HousePrecheckCheck an address

2112 Yonge StYonge-Eglinton, Toronto · City records before you offer

Commercial residential · CR 6.7 (c0.37; r6.34) SS2 (x23)≈ 6.2 × 34.3 m164 m²on Yonge St

1 thing to check before you offer, including work or applications in progress
N10 m
≈ 6.2 m frontage≈ 34.3 m deepirregular lot, estimated

Everything here comes from public records: City of Toronto open data, TRCA and Statistics Canada, 15 sets in all. Each item leads to the record it comes from. Our sources

This house at a glance

Each score from 0 to 10: 0 needs attention, 10 all clear. Build potential is how much more you could add.

About 2112 Yonge St

2112 Yonge St is on a 6.2 m by 34.3 m lot on Yonge St in Yonge-Eglinton. The zoning is CR. A site-specific exception, 900.11.10(23), changes some of the usual rules for this address.

The City has 22 records on this lot since 1982. That is more than at 99% of Toronto houses. In 2026, a building permit was filed: "1 wall sign + 2 overhanging structure signs**giorgetti**". Status: permit issued. In 2024, a development application was filed: "Draft plan of condominium approval for 12-storey mixed use building with 70 dwelling units". Status: closed. In 2022, a Committee of Adjustment application was filed: "To alter the 10-storey, 56-unit mixed-use development, approved under site specific by-law no. 1173-2015, by permitting two additional storeys, increasing the…". Status: closed. An open permit means the City has not closed the file. Ask the seller whether the work was finished and passed its final inspection.

Within 300 m, 12 development applications are open (the tallest up to 65 storeys). Eglinton station is a 5-minute walk, and the lot is in its Major Transit Station Area.

Summary

What the City's records show on this house

  • Work or applications in progressModerateFree check
  • Site-specific exception 900.11.10(23)Moderate
  • 12 development applications open within 300 mLowFree check
  • Yonge-Eglinton Secondary PlanLow
  • 2 Committee of Adjustment files on this lotLowFree check

Left unchecked, any of these can mean unexpected costs, trouble after closing, or plans you can't carry out. Found before you offer, they give you room to negotiate. The full report explains what each one means for this house and what to do next.

Unlock the full report

15 sets of public records, already checked for you. Searching each one yourself and working out what it means for you takes time. We have done that work: what matters about this house and lot, in plain English, in a few minutes.

What to find out first

1 thing to check before you offer.

What to find out before an offer, the steps to take, what each costs and how long it takesUnlock

A few questions

Open City files

How much in the City's records needs answers before an offer

  • Work or applications in progress
  • No open orders or by-law investigations
  • No permits left open for years

What this part means for this house, in plain EnglishUnlock

  1. Work or applications in progress

    ModerateCheck before you offer

    What the record shows, what it means for you and what to doUnlock

  2. 2 Committee of Adjustment files on this lot

    LowFor later, once you own it

    What the record shows, what it means for you and what to doUnlock

City files on this lot

22 records on file, more than at 99% of Toronto houses (median 0 records).

DateRecordAs the City filed itIn plain wordsStatus
2026-11-16Building permit
26 267520
1 wall sign + 2 overhanging structure signs**GIORGETTI**Permit Issued
2026-11-03Building permit
26 264817
1 wall sign + 2 overhanging structure signs**GIORGETTI**Cancelled
2024-06-25Development application
24 169804 STE 12 CD
Draft Plan of Condominium approval for 12-storey mixed use building with 70 dwelling units.Closed
2022-05-18Minor variance
A0124/22TEY
To alter the 10-storey, 56-unit mixed-use development, approved under Site Specific By-law No. 1173-2015, by permitting two additional storeys, increasing the height of the retail level, converting a part of a residential unit on the second storey to amenity space, and converting two regular parking spaces on level P2 into one accessible parking space, for a total of 70 residential units.Approved
2022-03-08Development application
22 120632 STE 12 SA
Site Plan Amendment Application to add an additional 2-storeys to the approved 10-storey mixed-use building. The proposal will result in a total non-residential gross floor area of 485 square metres, and a residential gross floor area of 7512 square metres on the lot. 70 residential dwelling units are proposed.Closed
2022-01-26Zoning review
22 107868 ZPR
No description on fileClosed
2021-10-08Zoning review
21 223762 ZPR
No description on fileClosed
2021-06-14Zoning review
21 170099 ZPR
No description on fileClosed
2019-06-03Building permit
19 139231
Proposal to demolish building and foundations for future development.Closed
2019-02-11Zoning review
19 114384 ZPR
No description on fileClosed
2018-07-03Minor variance
A0646/18TEY
Proposal for an 11 storey condominium building with 67 units and 378m2 of retail gross floor area at grade. Concurrent Site PlanWithdrawn
2018-05-18Zoning review
18 150890 PSP
No description on fileClosed
2018-04-30Development application
18 150890 STE 22 SA
Site Plan Control application to redevlop the site with a 10-storey mixed use residential building at approximately 36 metres containing 56 units, replacing the existing auto service centre and restaurant currently operating on the site.Closed
2018-04-11Zoning review
18 141968 ZPR
No description on fileClosed
2018-01-15Building permit
17 247265
REV 01 - REMOVAL OF ORIGINALY PROPOSED FANCOIL UNIT SYSTEM, PROPOSED ADDITION OF VERTICAL HEAT PUMP SYSTEM, OUTDOOR CONDENSING UNIT AS PER ORIGINAL APPLICATIONHVAC - INTERIOR ALTERATIONS TO GROUND FLOOR FOR A TEMPORARY SALES CENTRE FOR A CONDOMINIUM DEVELOPMENTClosed
2015-03-20Zoning review
10 154610 PRZ
No description on fileClosed
2010-03-26Development application
10 140492 STE 22 OZ
Rezoning application for both 2112 and 2114 Yonge st. Planning application for construction of 10 storey mixed use building - 80 residential units - 2 levels below grade parking - 60 parking spaces in total - 387m of retail space on ground floor - no parking related to retail.Closed
2006-02-15Zoning review
06 109844 LTO
No description on fileClosed
2005-09-16Zoning review
05 181466 ZPU
No description on fileClosed
1989-09-26Zoning review
89 030385 LTO
No description on fileClosed
1984-06-04Zoning review
84 026489 LTO
No description on fileClosed
1982-08-09Zoning review
82 026343 LTO
No description on fileClosed
Clear

Restrictions

How much heritage, nature and site-specific rules limit changes to the house

  • Site-specific exception 900.11.10(23)
  • No heritage listing or designation

What this part means for this house, in plain EnglishUnlock

  1. Site-specific exception 900.11.10(23)

    ModerateCheck if it applies

    What the record shows, what it means for you and what to doUnlock

  2. Yonge-Eglinton Secondary Plan

    LowFor later, once you own it

    What the record shows, what it means for you and what to doUnlock

If you want to change or build

What the site-specific rules mean for an addition, a garage or a rebuild.

Site-specific exception 900.11.10(23)

What the exception changes for this address, rule by ruleUnlock

Not on this lot

Flood and erosion rules

How much of the lot lies in the areas TRCA regulates for flooding and erosion

  • Outside the areas TRCA regulates

From TRCA's regulated areas only. Basement flooding, sewer back-up and the TRCA flood plain are not in this score yet; ask the seller and your insurer about water in the basement.

What this part means for this house, in plain EnglishUnlock

Little left to add

Build potential

How much more the rules allow on this lot, beyond what is on record

What this part means for this house, in plain EnglishUnlock

The lot and what the rules allow

N10 m
≈ 6.2 m frontage≈ 34.3 m deepon Yonge St
Zone
CR 6.7 (c0.37; r6.34) SS2 (x23)
Height limit
37.5 m
Corner lot
No
Public lane
None
House footprint
86 m²
Back yard
6.5 m
Buildings on the lot
3

House and yards from the City's 3D Massing; a survey gives exact figures.

What you can build

    Why, measured on this lot, and the most you could buildUnlock

    Busy

    Building nearby

    How much neighbours are building and applying to change within 300 m

    • 12 development applications open within 300 m, up to 65 storeys
    • In the Eglinton station area
    • 6 suite and multiplex permits within 300 m in 10 years

    What this part means for this house, in plain EnglishUnlock

    1. 12 development applications open within 300 m

      LowCheck if it applies

      What the record shows, what it means for you and what to doUnlock

    What the City allowed next door

    Within 500 m, last 10 years: a guide if you plan to build or apply for something similar.

    What neighbours have built and changed around you, and how the City decidedUnlock

    Crime near median

    Area safety

    Police-reported crime in the neighbourhood against the Toronto median

    • Lower than the Toronto median in 3 of 6 categories
    • Theft over $5,000: 2.2 times the Toronto median

    Neighbourhood rates per 100,000 people from the Toronto Police Service, not this street.

    What this part means for this house, in plain EnglishUnlock

    Yonge-Eglinton neighbourhood

    About the area, not this house.

    2021 Census, against the median Toronto neighbourhood

    Median household income (2020)$94,000median $84,500
    Households that own their home37%median 54%
    Population (2021)12,410median 16,813
    Homes built in 1960 or before47%median 29%
    Homes needing major repairs6%median 7%

    Getting around and schools

    • Eglinton StationNearest station5 min walk
    • Yonge St at Manor Rd WestNearest TTC stop1 min walk
    • Lascelles BlvdNearest cycling route6 min walk
    • The Study AcademySchool3 min walk
    • The Study Academy SchoolSchool3 min walk
    • Birmingham International Collegiate of CanadaSchool8 min walk
    • Caesar International AcademySchool8 min walk

    Police-reported crime, 2025, per 100,000 people

    • Assaultcity median 636.3713.8
    • Robberycity median 69.595.2
    • Auto theftcity median 192.6115.6
    • Theft over $5,000city median 46.1102
    • Break and entercity median 172.8136
    • Theft from vehiclescity median 188.154.4

    More about Yonge-Eglinton

    Ready emails

    Copy and send as they are.

    2 questions for the seller and your lawyer, written outUnlock

    What we checked, and what the City's records don't cover

    We checked 48 sets of City of Toronto, TRCA and Statistics Canada open data for this address, last updated Nov 27, 2026. Our records don't cover flooding history, ownership and mortgages, or the condition of the house: ask the seller and your insurer about water in the basement, your lawyer about title, and book a home inspection.

    See every source and when we loaded it · Pre-offer checklist

    Something here not right?

    Screening tool based on City of Toronto and TRCA open data. Not a zoning review or legal opinion. Site-specific exceptions, amendments not yet in the open data, minor variances and other by-laws can change the answer. Confirm with a Preliminary Project Review or Zoning Certificate from Toronto Building before buying or designing.

    Scores calibrated on Toronto house lots on 2026-10-19; prices and sources checked on 2026-10-06. Contains information licensed under the Open Government Licence – Toronto. TRCA regulation limits © Toronto and Region Conservation Authority.

    Full pre-offer report · 2112 Yonge St

    1 thing to check at 2112 Yonge St before you offer

    • Work or applications in progressModerate
    • Site-specific exception 900.11.10(23)Moderate
    • 12 development applications open within 300 mLow
    • Yonge-Eglinton Secondary PlanLow
    • and 1 more

    The report explains what each one can cost you on this house and what to ask the seller or the City before you offer.

    $29 CAD one time · opens right away

    See a sample report

    Full refund within 30 days if the report left out or misstated a City record on the lot. Refund policy

    Also in the report

    • A PDF to forward to your agent and lawyer
    • What you can build on this lot, measured on it
    • Every line linked to the City record it comes from
    • 15 sets of public records, already searched and read for you
    • A clear list of the 3 steps to take before you offer, so nothing slips
    • What each of the 5 findings can cost you or stop you doing, in plain English
    • A two-minute summary of this house, and what to find out first before you offer
    • What the City allowed your neighbours, a guide if you plan to build or apply for something similar
    • We watch this address for 90 days. If anything changes in the City's records, we email you the same day
    • A short summary of each part: City files, restrictions, flood and erosion, build potential, building nearby, area safety

    By paying you agree to the terms of use and the refund policy. Payment by Stripe. The report opens right after payment, and we email you a link to it; your account is made from the email you pay with. A screening of public records, not a legal opinion or a home inspection.

    Flag an error

    What is not right?

    The problem

    The records come from the City's open data; we check each flag against them. Your email is used only to answer this.