HousePrecheckCheck an address

209 Victoria StDowntown Yonge East, Toronto · City records before you offer

Commercial residential · CR 4.0 (c2.0; r4.0) SS114.0 × 35.8 m499 m²on Victoria Stbacks onto Victoria Street Lane

1 thing to check before you offer, including building permit open since 2024
N10 m
14.0 m frontage35.8 m deep

Everything here comes from public records: City of Toronto open data, TRCA and Statistics Canada, 15 sets in all. Each item leads to the record it comes from. Our sources

This house at a glance

Each score from 0 to 10: 0 needs attention, 10 all clear. Build potential is how much more you could add.

About 209 Victoria St

209 Victoria St is on a 14 m by 35.8 m lot on Victoria St in Downtown Yonge East. The zoning is CR.

The City has 25 records on this lot since 2007. That is more than at 99% of Toronto houses. In 2024, a building permit was filed: "Renovations to existing storage space to create new procedure space including new architectural finishes, mechanical, electrical and fire protection…". Status: closed. In 2024, a building permit was filed: "Renovation of existing starbucks space". Status: inspection. In 2022, a building permit was filed: "Proposal for interior alteration to refit research lab". Status: closed. An open permit means the City has not closed the file. Ask the seller whether the work was finished and passed its final inspection.

Within 300 m, 11 development applications are open (the tallest up to 71 storeys). Within 300 m, the Committee of Adjustment decided 11 minor variance applications in the last 10 years and approved 91%. TMU station is a 4-minute walk, and the lot is in its Major Transit Station Area.

Summary

What the City's records show on this house

  • Building permit open since 2024ModerateFree check
  • 11 development applications open within 300 mLowFree check
  • Downtown Plan Secondary PlanLow

Left unchecked, any of these can mean unexpected costs, trouble after closing, or plans you can't carry out. Found before you offer, they give you room to negotiate. The full report explains what each one means for this house and what to do next.

Unlock the full report

15 sets of public records, already checked for you. Searching each one yourself and working out what it means for you takes time. We have done that work: what matters about this house and lot, in plain English, in a few minutes.

What to find out first

1 thing to check before you offer.

What to find out before an offer, the steps to take, what each costs and how long it takesUnlock

Check

Open City files

How much in the City's records needs answers before an offer

  • Building permit open since 2024
  • No open orders or by-law investigations
  • No work or applications in progress

What this part means for this house, in plain EnglishUnlock

  1. Building permit open since 2024

    ModerateCheck before you offer

    What the record shows, what it means for you and what to doUnlock

City files on this lot

25 records on file, more than at 99% of Toronto houses (median 0 records).

DateRecordAs the City filed itIn plain wordsStatus
2026-08-05By-law investigation
26 213948 LGW 00 IR
Long Grass and WeedsClosed
2024-09-12Building permit
24 210024
Renovations to existing storage space to create new procedure space including new architectural finishes, mechanical, electrical and fire protection distributionClosed
2024-03-05Building permit
24 109633
Renovation of existing Starbucks spaceInspection
2022-03-07Building permit
22 116250
Proposal for interior alteration to refit research lab.Closed
2022-01-04Building permit
21 248737
New steam line PRV station - lvl B1 and P1Closed
2017-09-18Building permit
17 211210
Proposal for interior alterations to the entrance area of the ground floor of existing hospital. St. Michael's Hospital.Closed
2015-08-18Building permit
15 145139
Revision 01: installation of additional maglock on 7 floor elevator lobby door 777. INSTALLATION OF ONE NEW MAGLOCK ON 7 FLOOR ELEVATOR LOBBY DOOR.Closed
2015-05-22Zoning review
15 160879 LTO
No description on fileClosed
2015-04-09Building permit
14 185076
Structural revisions to the roof area.Closed
2014-05-30Building permit
14 162610
Proposal to install electromagnetic locks, 1 on the 4th floor, 1 on the 6th floor and 3 on the 8th floor of existing "St. Michales Hospital".Closed
2013-12-31Building permit
13 276557
Proposal for interior alterations to the 2nd floor A2 occupancy and 8th floor D occupancy in existing hospital - "St Michaels Hospital"Closed
2013-04-10Building permit
13 147648
To erect and display a static copy illuminated ground sign at the westerly frontage of the property in conjunction with an existing parking facility within St Michael's Hospital. **St Mikes Hospital**Cancelled
2012-10-23Building permit
12 265067
Proposal to install 3 electromagnetic locks on the 3rd floor and 3 on the 7th floor to "St.Michael's Hospital Li Ka Shing Knowledge Institue".Closed
2012-02-14Zoning review
12 122093 LPR
No description on fileClosed
2011-10-19Zoning review
11 295369 LPR
No description on fileClosed
2011-09-02Building permit
11 258506
Proposal for interior alterations to ground floor unit for new cafeteria, greater than 30 seats in existing hospital.Closed
2011-03-04Building permit
07 114980
REVISION TO EXISTING BUILDING PERMIT - REVISION TO CHANGE PARTITION LAYOUT IN BASEMENT OF NEW HOSPITAL BUILDING - SIMULATION CENTRE.Proposal to construct a new nine-storey hospital building with below grade parking (in conjunction to St. Michael's Hospital). Office, Admin., & Research Building. 26 & 38 Shuter Street, 209 Victoria Street and portion of Victoria Street Lane. Also, demolish an existing three-storey parking garage and office building. See Final & Binding - A0307/06TEYClosed
2010-11-22Zoning review
10 300691 LPR
No description on fileClosed
2010-05-04Building permit
09 190866
Permit for pedistrian bridge to connect 209 Victoria with 30 Bond St. Bridge to Cross Shuter Street - See 08 173116 STE 27 SA for Site Plan review, and 08 173110 ZPR for PPR. Please see 07 114980 BLD for building permit for new Hospital wing.Closed
2008-07-07Zoning review
08 178731 PSP
No description on fileClosed
2008-07-04Building permit
08 173198
Permit for 16 maglocks - throughout the buildingClosed
2008-06-20Zoning review
08 173110 ZPR
No description on fileClosed
2008-01-18Building permit
08 104320
This Folder was closed by the system. PP child folders cannot be created using the 'Create Child' button.The parentRSN was: 1839340Closed
2008-01-18Building permit
08 104300
This Folder was closed by the system. PP child folders cannot be created using the 'Create Child' button.The parentRSN was: 1839340Closed
2007-06-19Building permit
07 217851
Demolition of 2 existing 6 storey buildings operated as Offices/Research Facilities, known as #209 Victoria St on North East corner of Victoria and Shuter and #26 and #38 Shuter St ( under 1 building) on North side of Shuter.Closed
Clear

Restrictions

How much heritage, nature and site-specific rules limit changes to the house

  • No heritage listing or designation
  • No site-specific zoning exception

What this part means for this house, in plain EnglishUnlock

  1. Downtown Plan Secondary Plan

    LowFor later, once you own it

    What the record shows, what it means for you and what to doUnlock

Not on this lot

Flood and erosion rules

How much of the lot lies in the areas TRCA regulates for flooding and erosion

  • Outside the areas TRCA regulates

From TRCA's regulated areas only. Basement flooding, sewer back-up and the TRCA flood plain are not in this score yet; ask the seller and your insurer about water in the basement.

What this part means for this house, in plain EnglishUnlock

Little left to add

Build potential

How much more the rules allow on this lot, beyond what is on record

What this part means for this house, in plain EnglishUnlock

The lot and what the rules allow

N10 m
14.0 m frontage35.8 m deepon Victoria St
Zone
CR 4.0 (c2.0; r4.0) SS1
Height limit
30 m
Corner lot
No
Public lane
Victoria Street Lane, 14 m along it
House footprint
489 m²
Back yard
0.1 m
Buildings on the lot
1

House and yards from the City's 3D Massing; a survey gives exact figures.

What you can build

    Why, measured on this lot, and the most you could buildUnlock

    Busy

    Building nearby

    How much neighbours are building and applying to change within 300 m

    • 11 development applications open within 300 m, up to 71 storeys
    • In the Dundas station area
    • 11 minor variance decisions within 300 m, 91% approved

    What this part means for this house, in plain EnglishUnlock

    1. 11 development applications open within 300 m

      LowCheck if it applies

      What the record shows, what it means for you and what to doUnlock

    What the City allowed next door

    Within 500 m, last 10 years: a guide if you plan to build or apply for something similar.

    What neighbours have built and changed around you, and how the City decidedUnlock

    Crime well above median

    Area safety

    Police-reported crime in the neighbourhood against the Toronto median

    • Lower than the Toronto median in 1 of 7 categories
    • Assault: 3.7 times the Toronto median
    • Theft over $5,000: 2.2 times the Toronto median
    • Theft from vehicles: 2.1 times the Toronto median
    • Robbery: 2.1 times the Toronto median
    • Break and enter: 1.6 times the Toronto median

    Neighbourhood rates per 100,000 people from the Toronto Police Service, not this street.

    What this part means for this house, in plain EnglishUnlock

    Downtown Yonge East neighbourhood

    About the area, not this house.

    2021 Census, against the median Toronto neighbourhood

    Median household income (2020)$69,500median $84,500
    Households that own their home36%median 54%
    Population (2021)17,700median 16,813
    Homes built in 1960 or before7%median 29%
    Homes needing major repairs4%median 7%

    Getting around and schools

    • TMU StationNearest station4 min walk
    • Yonge St at Shuter StNearest TTC stop2 min walk
    • Shuter StNearest cycling route1 min walk
    • St Michael's Choir School - Gymnasium BldgSchool1 min walk
    • St Michael's Choir School - Choral BldgSchool1 min walk
    • St Michael's Choir School - ElementarySchool2 min walk
    • St Michael's Choir School - SecondarySchool2 min walk

    Police-reported crime, 2025, per 100,000 people

    • Assaultcity median 636.32360.8
    • Robberycity median 69.5143.3
    • Shootingscity median 10.511.9
    • Auto theftcity median 192.675.6
    • Theft over $5,000city median 46.199.5
    • Break and entercity median 172.8274.7
    • Theft from vehiclescity median 188.1390.1

    More about Downtown Yonge East

    Ready emails

    Copy and send as they are.

    2 questions for the seller and your lawyer, written outUnlock

    What we checked, and what the City's records don't cover

    We checked 48 sets of City of Toronto, TRCA and Statistics Canada open data for this address, last updated Nov 28, 2026. Our records don't cover flooding history, ownership and mortgages, or the condition of the house: ask the seller and your insurer about water in the basement, your lawyer about title, and book a home inspection.

    See every source and when we loaded it · Pre-offer checklist

    Something here not right?

    Screening tool based on City of Toronto and TRCA open data. Not a zoning review or legal opinion. Site-specific exceptions, amendments not yet in the open data, minor variances and other by-laws can change the answer. Confirm with a Preliminary Project Review or Zoning Certificate from Toronto Building before buying or designing.

    Scores calibrated on Toronto house lots on 2026-10-19; prices and sources checked on 2026-10-06. Contains information licensed under the Open Government Licence – Toronto. TRCA regulation limits © Toronto and Region Conservation Authority.

    Full pre-offer report · 209 Victoria St

    1 thing to check at 209 Victoria St before you offer

    • Building permit open since 2024Moderate
    • 11 development applications open within 300 mLow
    • Downtown Plan Secondary PlanLow

    The report explains what each one can cost you on this house and what to ask the seller or the City before you offer.

    $29 CAD one time · opens right away

    See a sample report

    Full refund within 30 days if the report left out or misstated a City record on the lot. Refund policy

    Also in the report

    • A PDF to forward to your agent and lawyer
    • What you can build on this lot, measured on it
    • Every line linked to the City record it comes from
    • 15 sets of public records, already searched and read for you
    • A clear list of the 5 steps to take before you offer, so nothing slips
    • What each of the 3 findings can cost you or stop you doing, in plain English
    • A two-minute summary of this house, and what to find out first before you offer
    • What the City allowed your neighbours, a guide if you plan to build or apply for something similar
    • We watch this address for 90 days. If anything changes in the City's records, we email you the same day
    • A short summary of each part: City files, restrictions, flood and erosion, build potential, building nearby, area safety

    By paying you agree to the terms of use and the refund policy. Payment by Stripe. The report opens right after payment, and we email you a link to it; your account is made from the email you pay with. A screening of public records, not a legal opinion or a home inspection.

    Flag an error

    What is not right?

    The problem

    The records come from the City's open data; we check each flag against them. Your email is used only to answer this.