Everything here comes from public records: City of Toronto open data, TRCA and Statistics Canada, 15 sets in all. Each item leads to the record it comes from. Our sources
This house at a glance
Each score from 0 to 10: 0 needs attention, 10 all clear. Build potential is how much more you could add.
About 2078 Avenue Rd
2078 Avenue Rd is on a 6 m by 38 m lot on Avenue Rd in Bedford Park-Nortown. The zoning is CR. A site-specific exception, 900.11.10(1543), changes some of the usual rules for this address. The lot also fronts Joicey Blvd.
The City has 11 records on this lot since 2002. That is more than at 99% of Toronto houses. In 2021, a building permit was filed: "In conjunction with a building on the premises, proposal to erect and display three wall signs, and a projecting sign, all illuminated, displaying static copy…". Status: closed. In 2015, a building permit was filed: "Revision - interior layout changes through fourth floor and mezzanine level. enclose front balcony from fourth floor". Status: closed. In 2015, a building permit was filed: "Revision - to add emergency lightingproposal for a change of use from residential on 2nd floor to commercial use". Status: closed. An open permit means the City has not closed the file. Ask the seller whether the work was finished and passed its final inspection.
Within 300 m, 1 development application is open (the tallest up to 4 storeys). Within 300 m, the Committee of Adjustment decided 34 minor variance applications in the last 10 years and approved 85%. The nearest TTC stop is Avenue Rd at Dunblaine Ave, a 1-minute walk.
Summary
What the City's records show on this house
- Building permit open since 2015ModerateFree check
- Site-specific exception 900.11.10(1543)Moderate
- 1 development application open within 300 mLowFree check
- 2 City trees in front of this lotLowFree check
- 1 Committee of Adjustment file on this lotLowFree check
Left unchecked, any of these can mean unexpected costs, trouble after closing, or plans you can't carry out. Found before you offer, they give you room to negotiate. The full report explains what each one means for this house and what to do next.
15 sets of public records, already checked for you. Searching each one yourself and working out what it means for you takes time. We have done that work: what matters about this house and lot, in plain English, in a few minutes.
What to find out first
1 thing to check before you offer.
What to find out before an offer, the steps to take, what each costs and how long it takesUnlock
Open City files
How much in the City's records needs answers before an offer
- Building permit open since 2015
- No open orders or by-law investigations
- No work or applications in progress
What this part means for this house, in plain EnglishUnlock
Building permit open since 2015
ModerateCheck before you offerSee the open permit check for this house
What the record shows, what it means for you and what to doUnlock
1 Committee of Adjustment file on this lot
LowFor later, once you own itSee the next door check for this house
What the record shows, what it means for you and what to doUnlock
What this means: Building permits before buyingWhat this means: Committee of Adjustment
City files on this lot
11 records on file, more than at 99% of Toronto houses (median 0 records).
| Date | Record | As the City filed it | In plain words | Status |
|---|---|---|---|---|
| 2026-07-28 | By-law investigation26 210056 LGW 00 IR | Long Grass and Weeds | Closed | |
| 2021-04-16 | Building permit21 117733 | In conjunction with a building on the premises, proposal to erect and display three wall signs, and a projecting sign, all illuminated, displaying static copy at the 2nd floor on the north, northeast, and east elevations.****LAW OFFICE**** | Closed | |
| 2015-12-18 | Building permit14 121827 | Revision - Interior layout changes through fourth floor and mezzanine level. Enclose front balcony from fourth floor. | Closed | |
| 2015-08-17 | Building permit15 134491 | REVISION - to add emergency lightingProposal for a change of use from Residential on 2nd floor to Commercial use | Closed | |
| 2015-06-15 | Building permit13 244886 | REVISION - as per drawingResidential addition to third floor on existing two storey building | Revision Issued | |
| 2015-05-07 | Minor varianceA0193/15NY | To legalize and to maintain the existing commericial/residential building. Please note the revised variance relates to the 0 step-back of the building face abutting Joicey Boulevard. | Deferred | |
| 2014-02-20 | Building permit14 106995 | To erect and display signs. **Kahnert Furs** | Closed | |
| 2013-09-17 | Building permit13 227365 | Underpinning to a Multiple-Use Building. | Closed | |
| 2013-08-02 | Building permit13 205592 | Interior Demolition of removal of drywall on ground floor and 2nd floor. Re-install drywall at stiarwell on G/F. | Closed | |
| 2013-06-24 | Zoning review13 193083 ZZC | No description on file | Cancelled | |
| 2002-01-24 | Zoning review02 105722 LTO | No description on file | Closed |
Restrictions
How much heritage, nature and site-specific rules limit changes to the house
- Site-specific exception 900.11.10(1543)
- No heritage listing or designation
What this part means for this house, in plain EnglishUnlock
Site-specific exception 900.11.10(1543)
ModerateCheck if it appliesWhat the record shows, what it means for you and what to doUnlock
2 City trees in front of this lot
LowFor later, once you own itSee the tree permit check for this house
What the record shows, what it means for you and what to doUnlock
What this means: Toronto zoning by address
If you want to change or build
What the site-specific rules mean for an addition, a garage or a rebuild.
Site-specific exception 900.11.10(1543)
What the exception changes for this address, rule by ruleUnlock
Flood and erosion rules
How much of the lot lies in the areas TRCA regulates for flooding and erosion
- Outside the areas TRCA regulates
From TRCA's regulated areas only. Basement flooding, sewer back-up and the TRCA flood plain are not in this score yet; ask the seller and your insurer about water in the basement.
What this part means for this house, in plain EnglishUnlock
Build potential
How much more the rules allow on this lot, beyond what is on record
What this part means for this house, in plain EnglishUnlock
The lot and what the rules allow
- Zone
- CR 3.0 (c2.0; r2.8) SS2 (x1543)
- Height limit
- 16.5 m
- Corner lot
- Yes, also on Joicey Blvd
- Public lane
- None
- House footprint
- 176 m²
- Back yard
- 4.8 m
- Buildings on the lot
- 1
House and yards from the City's 3D Massing; a survey gives exact figures.
What you can build
Why, measured on this lot, and the most you could buildUnlock
Building nearby
How much neighbours are building and applying to change within 300 m
- 1 development application open within 300 m, up to 4 storeys
- 34 minor variance decisions within 300 m, 85% approved
What this part means for this house, in plain EnglishUnlock
1 development application open within 300 m
LowCheck if it appliesSee the next door check for this house
What the record shows, what it means for you and what to doUnlock
What the City allowed next door
Within 500 m, last 10 years: a guide if you plan to build or apply for something similar.
What neighbours have built and changed around you, and how the City decidedUnlock
Area safety
Police-reported crime in the neighbourhood against the Toronto median
- Lower than the Toronto median in 3 of 6 categories
Neighbourhood rates per 100,000 people from the Toronto Police Service, not this street.
What this part means for this house, in plain EnglishUnlock
Bedford Park-Nortown neighbourhood
About the area, not this house.
2021 Census, against the median Toronto neighbourhood
Getting around and schools
- York Mills StationNearest station24 min walk
- Avenue Rd at Dunblaine AveNearest TTC stop1 min walk
- Ridley BlvdNearest cycling route15 min walk
- Armour Heights Public SchoolSchool8 min walk
- St Margaret Catholic Elementary School - Carmichael SiteSchool8 min walk
- Glen Briar Academy Elementary SchoolSchool8 min walk
- Magnificent Minds SchoolSchool14 min walk
Police-reported crime, 2025, per 100,000 people
- Assaultcity median 636.3230.1
- Robberycity median 69.559.5
- Auto theftcity median 192.6150.8
- Theft over $5,000city median 46.167.4
- Break and entercity median 172.8250
- Theft from vehiclescity median 188.1198.4
Ready emails
Copy and send as they are.
2 questions for the seller and your lawyer, written outUnlock
What we checked, and what the City's records don't cover
We checked 48 sets of City of Toronto, TRCA and Statistics Canada open data for this address, last updated Nov 28, 2026. Our records don't cover flooding history, ownership and mortgages, or the condition of the house: ask the seller and your insurer about water in the basement, your lawyer about title, and book a home inspection.
See every source and when we loaded it · Pre-offer checklist