HousePrecheckCheck an address

207 Yonge StDowntown Yonge East, Toronto · City records before you offer

Also 209 Yonge St

Commercial residential · CR 6.0 (c4.5; r6.0) SS1 (x2533)12.6 × 37.3 m463 m²on Yonge Stbacks onto St Enoch's Sq

1 thing to check before you offer, including 2 building permits open, the oldest since 1999
N10 m
12.6 m frontage37.3 m deep

Everything here comes from public records: City of Toronto open data, TRCA and Statistics Canada, 15 sets in all. Each item leads to the record it comes from. Our sources

This house at a glance

Each score from 0 to 10: 0 needs attention, 10 all clear. Build potential is how much more you could add.

About 207 Yonge St

207 Yonge St is on a 12.6 m by 37.3 m lot on Yonge St in Downtown Yonge East. The zoning is CR. A site-specific exception, 900.11.10(2533), changes some of the usual rules for this address.

The City has 36 records on this lot since 1983. That is more than at 99% of Toronto houses. In 2017, a building permit was filed: "In conjunction with a multi-storey building on the premises, proposal to erect and display one illuminated wall sign displaying static copy, located on the…". Status: closed. In 2014, a building permit was filed: "Proposal for a new canopy extending over the city sidewalk attached to 13 storey apartment building. - "yonge suites"". Status: closed. In 2012, a building permit was filed: "To erect and display one non-illuminated projecting sign on the westerly elevation first storey wall of building. sign is of static copy and in conjunction…". Status: closed. 2 open permits mean the City has not closed the files. Ask the seller whether the work was finished and passed its final inspection.

Within 300 m, 10 development applications are open (the tallest up to 71 storeys). Within 300 m, the Committee of Adjustment decided 9 minor variance applications in the last 10 years and approved 100%. Queen station is a 2-minute walk, and the lot is in its Major Transit Station Area.

Summary

What the City's records show on this house

  • 2 building permits open, the oldest since 1999ModerateFree check
  • Site-specific exception 900.11.10(2533)Moderate
  • 10 development applications open within 300 mLowFree check
  • Priority retail street: Yonge StreetLow
  • Site and Area Specific Policy 174Low
  • Downtown Plan Secondary PlanLow
  • 1 Committee of Adjustment file on this lotLowFree check

Left unchecked, any of these can mean unexpected costs, trouble after closing, or plans you can't carry out. Found before you offer, they give you room to negotiate. The full report explains what each one means for this house and what to do next.

Unlock the full report

15 sets of public records, already checked for you. Searching each one yourself and working out what it means for you takes time. We have done that work: what matters about this house and lot, in plain English, in a few minutes.

What to find out first

1 thing to check before you offer.

What to find out before an offer, the steps to take, what each costs and how long it takesUnlock

Check

Open City files

How much in the City's records needs answers before an offer

  • 2 building permits open, the oldest since 1999
  • No open orders or by-law investigations
  • No work or applications in progress

What this part means for this house, in plain EnglishUnlock

  1. 2 building permits open, the oldest since 1999

    ModerateCheck before you offer

    What the record shows, what it means for you and what to doUnlock

  2. 1 Committee of Adjustment file on this lot

    LowFor later, once you own it

    What the record shows, what it means for you and what to doUnlock

City files on this lot

36 records on file, more than at 99% of Toronto houses (median 0 records).

DateRecordAs the City filed itIn plain wordsStatus
2017-11-08Building permit
17 244662
In conjunction with a multi-storey building on the premises, proposal to erect and display one illuminated wall sign displaying static copy, located on the second storey of the west elevation. The proposed sign contains two sign faces, each measuring 2.44 metre vertically by 0.41 metres horizontally at a height of 6.64 metres above grade.**FIRKIN ON YONGE**Closed
2014-02-26Building permit
14 101071
Proposal for a new canopy extending over the city sidewalk attached to 13 storey apartment building. - "Yonge Suites"Closed
2013-08-14Zoning review
13 220485 ZZC
No description on fileClosed
2012-02-21Building permit
12 124349
To erect and display one non-illuminated projecting sign on the westerly elevation first storey wall of building. Sign is of static copy and in conjunction with a pub.**Firkin**Closed
2011-11-21Building permit
11 234121
REVISION - to change interior layout of kitchen area on ground floor and washroom area in basement. permit for interior alterations to basement, ground and second floor to convert existing retail store to restaurant greater than 30 seats - Firkin on Yonge.Closed
2011-07-14Building permit
11 234135
Kitchen exhaust permit for new building permit permit for interior alterations to basement, ground and second floor to convert existing retail store to restaurant greater than 30 seats - Firkin on Yonge.Closed
2011-03-17Zoning review
11 147485 ZZC
No description on fileCancelled
2011-02-23Zoning review
11 131756 ZPR
No description on fileClosed
2011-02-08Building permit
11 103928
Proposal to alter the existing ground floor retail space by relocating the entry doors (changing from outswing to sliding doors) which will also increase the retail space. See also 10 144712 MV.Closed - Dormant
2010-07-28Building permit
10 113831
REVISION TO EXSITING BUILDING PERMIT - REVISION to change interior partitioning and add smoke baffels to existing permit Proposal to replace a section of the interior glazing on the ground floor lobby of an existing multi use building. Existing use is residential apartment building with ground floor retail. Convenience address is 207 Yonge St.Closed
2010-05-26Minor variance
A0399/10TEY
To alter the existing 12-storey mixed use building by renovating the ground floor retail space by relocating the entry doors (changing from outswing to sliding doors) to accommodate new signage installation.Approved
2010-03-01Zoning review
10 124409 ZAL
No description on fileCancelled
2004-07-15Building permit
04 157027
Interior alterations to create new retail storeClosed
2003-04-15Zoning review
03 124289 PLO
No description on fileClosed
2003-04-15Zoning review
03 124146 PLO
No description on fileClosed
2002-01-24Building permit
02 105509
install 2 maglocks on 5th floor and 2 maglocks on 10th floor ( 4 total)Permit Issued
2000-09-22Building permit
00 140145
ALTER BLD PERMIT #412818 BY BUILDING A PORTION OF THE 10TH,11TH,12TH FLOORS FOR ADDITIONAL UNIT ALSO ENCLOSING BALCONIES FROM 4TH TO 12TH --SEE C. OF A. DEC.--- FINAL & BINDING NOV. 1/99Closed
2000-07-21Building permit
00 173326
install sprinkler system, basement, ground, 2nd fl, 3rd fl,-mech. penthouse, & garbage chute--cost incl. under file#98-412818Closed
2000-03-21Building permit
00 130085
install drains- 200mm storm drain, 150mm sanitary drain, 100mm water service,200mm Fireline- install fixtures in basement- 3 sump pumps, 2 f.d.,; 1st floor- 6 f.d., 3rd floor- 4 2-compt. k.s., 7 w.b., 3 b.t., 3 showers, 7 w.c., 3 w.m., 4 f.d.; 4th to 9th floors- 4 2-compt. k.s., 8 w.b., 4 b.t., 8 w.c., 4 showers, 4 w.m.; 10th-11th floors- 3 2-compt. k.s., 6 w.b., 6 w.c., 3 showers, 3 w.m., 1 f.d.: 12th floor- 2 2-compt. k.s.,2 w.m., 2 w.c., 2 w.b.; 13th floor- 3 w.b., 2 b.t., 1 shower, 2 w.c., 2 bidet; mech. floor- 1 r.d., 2 f.d.; roof- 5 r.d.cost incl.with B.P.# 412818)Closed
1999-06-04Building permit
99 015521
SUPPLY AND INSTALL HVAC. REFER TO 412818 FOR PLANS. Closed
1999-05-03Building permit
98 017232
BUILD A 13 STOREY PLUS MECHANICAL PENTHOUSE AND ONE LEVEL OF BASEMENT SEE C. OF A. DECISION ALSO SEE UNDERTAKING APPROX. 3,898.9 M2Inspection
1999-01-21Building permit
98 025290
EXCAVATION AND FOUNDATIONS TO GRADE. FEE $ 200.00 SEE BP# 412818Closed
1995-02-06Zoning review
95 024600 LTO
No description on fileClosed
1992-11-02Zoning review
92 026150 LTO
No description on fileClosed
1991-02-04Zoning review
91 026064 LTO
No description on fileClosed
1990-01-25Zoning review
90 028101 LTO
No description on fileClosed
1988-04-22Zoning review
88 030332 LTO
No description on fileClosed
1987-09-09Zoning review
87 030379 LTO
No description on fileClosed
1984-03-20Zoning review
84 026272 LTO
No description on fileClosed
1984-03-05Zoning review
84 026231 LTO
No description on fileClosed
1983-12-01Zoning review
83 026488 LTO
No description on fileClosed
1983-11-09Zoning review
83 026442 LTO
No description on fileClosed
1983-11-08Zoning review
83 026436 LTO
No description on fileClosed
1983-11-03Zoning review
83 026407 LTO
No description on fileClosed
1983-10-20Zoning review
83 026354 LTO
No description on fileClosed
1983-10-06Zoning review
83 026319 LTO
No description on fileClosed
Minor

Restrictions

How much heritage, nature and site-specific rules limit changes to the house

  • Site-specific exception 900.11.10(2533)
  • Priority retail street: Yonge Street
  • No heritage listing or designation

What this part means for this house, in plain EnglishUnlock

  1. Site-specific exception 900.11.10(2533)

    ModerateCheck if it applies

    What the record shows, what it means for you and what to doUnlock

  2. Priority retail street: Yonge Street

    LowFor later, once you own it

    What the record shows, what it means for you and what to doUnlock

  3. Site and Area Specific Policy 174

    LowFor later, once you own it

    What the record shows, what it means for you and what to doUnlock

  4. Downtown Plan Secondary Plan

    LowFor later, once you own it

    What the record shows, what it means for you and what to doUnlock

If you want to change or build

What the site-specific rules mean for an addition, a garage or a rebuild.

Site-specific exception 900.11.10(2533)

What the exception changes for this address, rule by ruleUnlock

Not on this lot

Flood and erosion rules

How much of the lot lies in the areas TRCA regulates for flooding and erosion

  • Outside the areas TRCA regulates

From TRCA's regulated areas only. Basement flooding, sewer back-up and the TRCA flood plain are not in this score yet; ask the seller and your insurer about water in the basement.

What this part means for this house, in plain EnglishUnlock

Little left to add

Build potential

How much more the rules allow on this lot, beyond what is on record

What this part means for this house, in plain EnglishUnlock

The lot and what the rules allow

N10 m
12.6 m frontage37.3 m deepon Yonge St
Zone
CR 6.0 (c4.5; r6.0) SS1 (x2533)
Height limit
46 m
Corner lot
No
Public lane
St Enoch's Sq, 12.4 m along it
House footprint
456 m²
Back yard
0.6 m
Buildings on the lot
4

House and yards from the City's 3D Massing; a survey gives exact figures.

What you can build

    Why, measured on this lot, and the most you could buildUnlock

    Busy

    Building nearby

    How much neighbours are building and applying to change within 300 m

    • 10 development applications open within 300 m, up to 71 storeys
    • In the Dundas station area
    • 9 minor variance decisions within 300 m, 100% approved

    What this part means for this house, in plain EnglishUnlock

    1. 10 development applications open within 300 m

      LowCheck if it applies

      What the record shows, what it means for you and what to doUnlock

    What the City allowed next door

    Within 500 m, last 10 years: a guide if you plan to build or apply for something similar.

    What neighbours have built and changed around you, and how the City decidedUnlock

    Crime well above median

    Area safety

    Police-reported crime in the neighbourhood against the Toronto median

    • Lower than the Toronto median in 1 of 7 categories
    • Assault: 3.7 times the Toronto median
    • Theft over $5,000: 2.2 times the Toronto median
    • Theft from vehicles: 2.1 times the Toronto median
    • Robbery: 2.1 times the Toronto median
    • Break and enter: 1.6 times the Toronto median

    Neighbourhood rates per 100,000 people from the Toronto Police Service, not this street.

    What this part means for this house, in plain EnglishUnlock

    Downtown Yonge East neighbourhood

    About the area, not this house.

    2021 Census, against the median Toronto neighbourhood

    Median household income (2020)$69,500median $84,500
    Households that own their home36%median 54%
    Population (2021)17,700median 16,813
    Homes built in 1960 or before7%median 29%
    Homes needing major repairs4%median 7%

    Getting around and schools

    • Queen StationNearest station2 min walk
    • Queen Station - Northbound PlatformNearest TTC stop1 min walk
    • Shuter StNearest cycling route1 min walk
    • St Michael's Choir School - Gymnasium BldgSchool3 min walk
    • St Michael's Choir School - Choral BldgSchool3 min walk
    • St Michael's Choir School - ElementarySchool4 min walk
    • St Michael's Choir School - SecondarySchool4 min walk

    Police-reported crime, 2025, per 100,000 people

    • Assaultcity median 636.32360.8
    • Robberycity median 69.5143.3
    • Shootingscity median 10.511.9
    • Auto theftcity median 192.675.6
    • Theft over $5,000city median 46.199.5
    • Break and entercity median 172.8274.7
    • Theft from vehiclescity median 188.1390.1

    More about Downtown Yonge East

    Ready emails

    Copy and send as they are.

    2 questions for the seller and your lawyer, written outUnlock

    What we checked, and what the City's records don't cover

    We checked 48 sets of City of Toronto, TRCA and Statistics Canada open data for this address, last updated Nov 27, 2026. Our records don't cover flooding history, ownership and mortgages, or the condition of the house: ask the seller and your insurer about water in the basement, your lawyer about title, and book a home inspection.

    See every source and when we loaded it · Pre-offer checklist

    Something here not right?

    Screening tool based on City of Toronto and TRCA open data. Not a zoning review or legal opinion. Site-specific exceptions, amendments not yet in the open data, minor variances and other by-laws can change the answer. Confirm with a Preliminary Project Review or Zoning Certificate from Toronto Building before buying or designing.

    Scores calibrated on Toronto house lots on 2026-10-19; prices and sources checked on 2026-10-06. Contains information licensed under the Open Government Licence – Toronto. TRCA regulation limits © Toronto and Region Conservation Authority.

    Full pre-offer report · 207 Yonge St

    1 thing to check at 207 Yonge St before you offer

    • 2 building permits open, the oldest since 1999Moderate
    • Site-specific exception 900.11.10(2533)Moderate
    • 10 development applications open within 300 mLow
    • Priority retail street: Yonge StreetLow
    • and 3 more

    The report explains what each one can cost you on this house and what to ask the seller or the City before you offer.

    $29 CAD one time · opens right away

    See a sample report

    Full refund within 30 days if the report left out or misstated a City record on the lot. Refund policy

    Also in the report

    • A PDF to forward to your agent and lawyer
    • What you can build on this lot, measured on it
    • Every line linked to the City record it comes from
    • 15 sets of public records, already searched and read for you
    • A clear list of the 6 steps to take before you offer, so nothing slips
    • What each of the 7 findings can cost you or stop you doing, in plain English
    • A two-minute summary of this house, and what to find out first before you offer
    • What the City allowed your neighbours, a guide if you plan to build or apply for something similar
    • We watch this address for 90 days. If anything changes in the City's records, we email you the same day
    • A short summary of each part: City files, restrictions, flood and erosion, build potential, building nearby, area safety

    By paying you agree to the terms of use and the refund policy. Payment by Stripe. The report opens right after payment, and we email you a link to it; your account is made from the email you pay with. A screening of public records, not a legal opinion or a home inspection.

    Flag an error

    What is not right?

    The problem

    The records come from the City's open data; we check each flag against them. Your email is used only to answer this.