HousePrecheckCheck an address

205 Cummer AveNewtonbrook East, Toronto · City records before you offer

Residential multiple · RM (f30.0; a1375; d1.5) (x41)≈ 125.9 × 188.3 m17,786 m²on Cummer Ave

2 things to check before you offer, including 6 building permits open, the oldest since 2008
N50 m
≈ 125.9 m frontage≈ 188.3 m deepirregular lot, estimated

Everything here comes from public records: City of Toronto open data, TRCA and Statistics Canada, 15 sets in all. Each item leads to the record it comes from. Our sources

This house at a glance

Each score from 0 to 10: 0 needs attention, 10 all clear. Build potential is how much more you could add.

About 205 Cummer Ave

205 Cummer Ave is on a 125.9 m by 188.3 m lot on Cummer Ave in Newtonbrook East. The zoning is RM. A site-specific exception, 900.6.10(41), changes some of the usual rules for this address.

The City has 28 records on this lot since 1996. That is more than at 99% of Toronto houses. In 2026, a building permit was filed: "Proposal for exterior renovations - exterior parking, stairs, curbs and sloped walkway". Status: application on hold. In 2025, a building permit was filed: "Proposed installation of new sprinkler zone in the 5th floor elevator machine room". Status: inspection. In 2023, a building permit was filed: "Revision #02 - see dwg. description for proposed scope of works under this revision (fire alarm devices in underground walkway between buildings) per…". Status: closed. 7 open permits mean the City has not closed the files. Ask the seller whether the work was finished and passed its final inspection.

Within 300 m, 1 development application is open. Within 300 m, the Committee of Adjustment decided 8 minor variance applications in the last 10 years and approved 100%. The nearest TTC stop is Cummer Ave at Becky Cheung Ct, a 2-minute walk.

Summary

What the City's records show on this house

  • 6 building permits open, the oldest since 2008ModerateFree check
  • Work or applications in progressModerateFree check
  • Site-specific exception 900.6.10(41)Moderate
  • No permit for a second unit on fileLowFree check
  • The back yard may be too tight for a garden suiteLowFree check
  • 1 development application open within 300 mLowFree check
  • 8 City trees in front of this lotLowFree check

Left unchecked, any of these can mean unexpected costs, trouble after closing, or plans you can't carry out. Found before you offer, they give you room to negotiate. The full report explains what each one means for this house and what to do next.

What the rules allow here: Multiplex up to 4 units · Lot split (severance)

Unlock the full report

15 sets of public records, already checked for you. Searching each one yourself and working out what it means for you takes time. We have done that work: what matters about this house and lot, in plain English, in a few minutes.

What to find out first

2 things to check before you offer.

What to find out before an offer, the steps to take, what each costs and how long it takesUnlock

Check carefully

Open City files

How much in the City's records needs answers before an offer

  • 6 building permits open, the oldest since 2008
  • Work or applications in progress
  • No open orders or by-law investigations

What this part means for this house, in plain EnglishUnlock

  1. 6 building permits open, the oldest since 2008

    ModerateCheck before you offer

    What the record shows, what it means for you and what to doUnlock

  2. Work or applications in progress

    ModerateCheck before you offer

    What the record shows, what it means for you and what to doUnlock

  3. No permit for a second unit on file

    LowCheck if it applies

    What the record shows, what it means for you and what to doUnlock

City files on this lot

28 records on file, more than at 99% of Toronto houses (median 0 records).

DateRecordAs the City filed itIn plain wordsStatus
2026-11-02Building permit
26 263641
Proposal for Exterior Renovations - Exterior parking, stairs, curbs and sloped walkwayApplication On Hold
2026-10-21By-law investigation
26 258341 ELS 00 IR
Election SignsClosed
2026-10-07By-law investigation
26 250948 ELS 00 IR
Election SignsClosed
2026-03-26Building permit
26 135197
Proposal for alterations to exterior parking, stairs, curbs and sloped walkwaysCancelled
2025-05-30Zoning review
25 168667 ZAP
No description on fileApplication On Hold
2025-04-15Building permit
25 144884
Proposal For Long-Term Care Home Exterior Renovations, Exterior Parking, Stairs (Handrail/guard), Curbs and Sloped Walkway.Cancelled
2025-03-26Building permit
25 113797
Proposed installation of new sprinkler zone in the 5th floor elevator machine roomInspection
2023-07-13Building permit
18 155967
Revision #02 - See dwg. description for proposed scope of works under this revision (fire alarm devices in underground walkway between buildings) per applicant.Proposal to install firealarms in an existing long term care facility with four floors plus basement.Closed
2022-03-09Building permit
22 110804
Proposal for alterations for plumbing modification, addition and enhancement for installation of humidifier replacements and water softener in an existing Long Term Care Home.Cancelled
2020-06-24Building permit
20 148825
Replacement of existing rooftop chillersClosed
2019-12-20Building permit
19 219399
BLD, PLB, HVA - Proposal for interior alterations involving the replacement of the servery on the second floor, relocate electrical panel, sprinklers and food service equipment.Closed
2018-06-06Building permit
18 155950
Proposal to install 33 maglocks throughout existing long term care facility.Inspection
2018-02-14Building permit
18 108901
Proposed laundry room renovation, including equipment replacement and associated structural base.Permit Issued
2017-07-21Building permit
17 133031
HVAC - Proposal for demolition and renovation of level 2 and level 3 tub room, shower room and washroom in the existing long term care facility.Closed
2017-01-11Building permit
16 269525
Construct alteations to the long term care home in relations to mechanical permit 16-166535Inspection
2016-06-30Building permit
16 166535
Proposal to replace heating boiler plant and associated heat exchangers and upgrade of gas controls associated with the boiler plant within existing Home for the Aged. Cummer Lodge.Inspection
2015-04-27Building permit
15 125223
Proposal for a fuel storage tank and line replacement in an existing long term care homeInspection
2013-08-20Building permit
13 210617
Installation of 3 maglocks in the basementClosed
2011-05-11Building permit
11 184763
Cummer Lodge, installation of BFP.Closed
2011-01-25Building permit
10 315001
To erect double sided Illuminated Ground Sign for Long Term Care HomeClosed
2008-12-23Building permit
08 228223
Removal and relocating an existing chiller and cooling tower. Installation of new structural construction. Cummer LodgeInspection
2008-11-14Development application
08 221765 NNY 24 SA
Home for the Aged - Chiller Upgrade at Cummer Lodge. Application for a revision to the previously approved site plan: NY SPC 19940050Closed
2007-01-12Building permit
06 194890
Domestic hot water renovationClosed
2005-04-29Building permit
04 202394
Interior alterations to laundry room at Cummer LodgeClosed - Dormant
2000-07-14Building permit
00 166233
INSTALL 5 MAGLOCKS & REMOVE ONE MAGLOCK ON THE GROUND & 4TH FLOOR. FOR CUMMER LODGE.Closed - Dormant
2000-05-09Building permit
00 143967
ADD 10 NEW MAGLOCKS TO 1ST FLOOR OF AN EXISTING OLD AGE HOMEClosed - Dormant
1996-10-23Building permit
96 251052
ADD & INT ALTClosed
1996-07-17Building permit
96 089242
FOUNDATION ONLY B96-1139Closed
Clear

Restrictions

How much heritage, nature and site-specific rules limit changes to the house

  • Site-specific exception 900.6.10(41)
  • No heritage listing or designation

What this part means for this house, in plain EnglishUnlock

  1. Site-specific exception 900.6.10(41)

    ModerateCheck if it applies

    What the record shows, what it means for you and what to doUnlock

  2. 8 City trees in front of this lot

    LowFor later, once you own it

    What the record shows, what it means for you and what to doUnlock

If you want to change or build

What the site-specific rules mean for an addition, a garage or a rebuild.

Site-specific exception 900.6.10(41)

What the exception changes for this address, rule by ruleUnlock

Not on this lot

Flood and erosion rules

How much of the lot lies in the areas TRCA regulates for flooding and erosion

  • Outside the areas TRCA regulates

From TRCA's regulated areas only. Basement flooding, sewer back-up and the TRCA flood plain are not in this score yet; ask the seller and your insurer about water in the basement.

What this part means for this house, in plain EnglishUnlock

Good

Build potential

How much more the rules allow on this lot, beyond what is on record

  • Multiplex up to 4 units: likely fits
  • Garden suite: needs a closer look
  • Secondary suite: likely fits

What this part means for this house, in plain EnglishUnlock

  1. The back yard may be too tight for a garden suite

    LowCheck if it applies

    What the record shows, what it means for you and what to doUnlock

  2. Multiplex up to 4 units

    LowFor later, once you own it

    What the record shows, what it means for you and what to doUnlock

  3. Lot split (severance)

    LowFor later, once you own it

    What the record shows, what it means for you and what to doUnlock

The lot and what the rules allow

N50 m
≈ 125.9 m frontage≈ 188.3 m deepon Cummer Ave
Zone
RM (f30.0; a1375; d1.5) (x41)
Height limit
—
Lot coverage limit
35%
Corner lot
No
Public lane
None
New house permit
None since 2000
House footprint
6,055 m²
Back yard
9.3 m
Buildings on the lot
2

House and yards from the City's 3D Massing; a survey gives exact figures.

What you can build

Why, measured on this lot, and the most you could buildUnlock

Some

Building nearby

How much neighbours are building and applying to change within 300 m

  • 1 development application open within 300 m
  • 1 suite and multiplex permits within 300 m in 10 years
  • 8 minor variance decisions within 300 m, 100% approved

What this part means for this house, in plain EnglishUnlock

  1. 1 development application open within 300 m

    LowCheck if it applies

    What the record shows, what it means for you and what to doUnlock

What the City allowed next door

Within 500 m, last 10 years: a guide if you plan to build or apply for something similar.

What neighbours have built and changed around you, and how the City decidedUnlock

Crime near median

Area safety

Police-reported crime in the neighbourhood against the Toronto median

  • Lower than the Toronto median in 4 of 6 categories

Neighbourhood rates per 100,000 people from the Toronto Police Service, not this street.

What this part means for this house, in plain EnglishUnlock

Newtonbrook East neighbourhood

About the area, not this house.

2021 Census, against the median Toronto neighbourhood

Median household income (2020)$80,000median $84,500
Households that own their home62%median 54%
Population (2021)15,345median 16,813
Homes built in 1960 or before17%median 29%
Homes needing major repairs5%median 7%

Getting around and schools

  • Finch StationNearest station17 min walk
  • Cummer Ave at Becky Cheung CtNearest TTC stop2 min walk
  • Newtonbrook Park TrlNearest cycling route2 min walk
  • Avondale Secondary Alternative SchoolSchool7 min walk
  • Cummer Valley Mdl SchoolSchool8 min walk
  • Drewry AcademySchool16 min walk
  • Alpha Quality Education SchoolSchool16 min walk

Police-reported crime, 2025, per 100,000 people

  • Assaultcity median 636.3554
  • Robberycity median 69.560.3
  • Auto theftcity median 192.6252.3
  • Theft over $5,000city median 46.149.4
  • Break and entercity median 172.8170
  • Theft from vehiclescity median 188.1170

More about Newtonbrook East

Ready emails

Copy and send as they are.

4 questions for the seller and your lawyer, written outUnlock

What we checked, and what the City's records don't cover

We checked 48 sets of City of Toronto, TRCA and Statistics Canada open data for this address, last updated Nov 27, 2026. Our records don't cover flooding history, ownership and mortgages, or the condition of the house: ask the seller and your insurer about water in the basement, your lawyer about title, and book a home inspection.

See every source and when we loaded it · Pre-offer checklist

Something here not right?

Screening tool based on City of Toronto and TRCA open data. Not a zoning review or legal opinion. Site-specific exceptions, amendments not yet in the open data, minor variances and other by-laws can change the answer. Confirm with a Preliminary Project Review or Zoning Certificate from Toronto Building before buying or designing.

Scores calibrated on Toronto house lots on 2026-10-19; prices and sources checked on 2026-10-06. Contains information licensed under the Open Government Licence – Toronto. TRCA regulation limits © Toronto and Region Conservation Authority.

Full pre-offer report · 205 Cummer Ave

2 things to check at 205 Cummer Ave before you offer

  • 6 building permits open, the oldest since 2008Moderate
  • Work or applications in progressModerate
  • Site-specific exception 900.6.10(41)Moderate
  • No permit for a second unit on fileLow
  • and 3 more

The report explains what each one can cost you on this house and what to ask the seller or the City before you offer.

$29 CAD one time · opens right away

See a sample report

Full refund within 30 days if the report left out or misstated a City record on the lot. Refund policy

Also in the report

  • A PDF to forward to your agent and lawyer
  • What you can build on this lot, measured on it
  • Every line linked to the City record it comes from
  • 15 sets of public records, already searched and read for you
  • A clear list of the 7 steps to take before you offer, so nothing slips
  • What each of the 7 findings can cost you or stop you doing, in plain English
  • A two-minute summary of this house, and what to find out first before you offer
  • What the City allowed your neighbours, a guide if you plan to build or apply for something similar
  • We watch this address for 90 days. If anything changes in the City's records, we email you the same day
  • A short summary of each part: City files, restrictions, flood and erosion, build potential, building nearby, area safety

By paying you agree to the terms of use and the refund policy. Payment by Stripe. The report opens right after payment, and we email you a link to it; your account is made from the email you pay with. A screening of public records, not a legal opinion or a home inspection.

Flag an error

What is not right?

The problem

The records come from the City's open data; we check each flag against them. Your email is used only to answer this.