HousePrecheckCheck an address

197 Queen St EMoss Park, Toronto · City records before you offer

Also 199 Queen St E

Commercial residential · CR 4.5 (c2.0; r4.0) SS2 (x333)9.1 × 18.3 m167 m²on Queen St E

1 thing to check before you offer, including 4 building permits open, the oldest since 2005
N10 m
9.1 m frontage18.3 m deep

Everything here comes from public records: City of Toronto open data, TRCA and Statistics Canada, 15 sets in all. Each item leads to the record it comes from. Our sources

This house at a glance

Each score from 0 to 10: 0 needs attention, 10 all clear. Build potential is how much more you could add.

About 197 Queen St E

197 Queen St E is on a 9.1 m by 18.3 m lot on Queen St E in Moss Park. The zoning is CR. A site-specific exception, 900.11.10(333), changes some of the usual rules for this address.

The City has 8 records on this lot since 2003. That is more than at 98% of Toronto houses. In 2019, a building permit was filed: "Plumbing - interior alterations to fit out new gf retail 'fly fishing' store. gf only". Status: closed. In 2007, a building permit was filed: "Proposal to construct interior alterations.see c of a a0240/06tey associated with bldg permit 06117168note: 1. owner and applicant owns units on both sides of…". Status: inspection. In 2006, a building permit was filed: "Build mezzanine level on 3rd floor dwelling unit and change of use in basement from retail store to storage". Status: inspection. 4 open permits mean the City has not closed the files. Ask the seller whether the work was finished and passed its final inspection.

Within 300 m, 7 development applications are open (the tallest up to 39 storeys). Within 300 m, the Committee of Adjustment decided 18 minor variance applications in the last 10 years and approved 100%. Queen station is a 11-minute walk, and the lot is in its Major Transit Station Area.

Summary

What the City's records show on this house

  • 4 building permits open, the oldest since 2005ModerateFree check
  • Site-specific exception 900.11.10(333)Moderate
  • 7 development applications open within 300 mLowFree check
  • Priority retail street: Queen Street EastLow
  • King-Parliament Secondary PlanLow
  • 3 Committee of Adjustment files on this lotLowFree check

Left unchecked, any of these can mean unexpected costs, trouble after closing, or plans you can't carry out. Found before you offer, they give you room to negotiate. The full report explains what each one means for this house and what to do next.

Unlock the full report

15 sets of public records, already checked for you. Searching each one yourself and working out what it means for you takes time. We have done that work: what matters about this house and lot, in plain English, in a few minutes.

What to find out first

1 thing to check before you offer.

What to find out before an offer, the steps to take, what each costs and how long it takesUnlock

Check

Open City files

How much in the City's records needs answers before an offer

  • 4 building permits open, the oldest since 2005
  • No open orders or by-law investigations
  • No work or applications in progress

What this part means for this house, in plain EnglishUnlock

  1. 4 building permits open, the oldest since 2005

    ModerateCheck before you offer

    What the record shows, what it means for you and what to doUnlock

  2. 3 Committee of Adjustment files on this lot

    LowFor later, once you own it

    What the record shows, what it means for you and what to doUnlock

City files on this lot

8 records on file, more than at 98% of Toronto houses (median 0 records).

DateRecordAs the City filed itIn plain wordsStatus
2019-07-15Building permit
07 107460
Plumbing - Interior alterations to fit out new GF Retail 'Fly Fishing' Store. GF Only.Closed
2007-04-11Building permit
06 185290
Proposal to construct interior alterations.See C of A A0240/06TEY associated with Bldg Permit 06117168Note: 1. Owner and applicant owns units on both sides of party wall. 2. Applicant will apply for Mechanical Permit at a later date.Inspection
2006-08-14Building permit
06 117168
Build mezzanine level on 3rd floor dwelling unit and change of use in basement from retail store to storage.Inspection
2006-05-03Minor variance
A0242/06TEY
The applicant is seeking relief from the provisions of the Zoning By-law No. 438-86 as amended, to make interior alterations and to convert the existing basement from a storage room to office/retail use. A third floor addition and walk out deck is also proposed but both structures comply with the provisions of the Zoning By-law.Approved
2005-08-26Building permit
05 157365
Demolish one free standing masonry wall 50' long by 11' high and 3 steel supported by wallJohn Gillespie been on site already to confirm existing conditionInspection
2005-02-25Building permit
04 102610
Construct third floor addition; infill existing openings on multiple elevations; proposed front & rear walkout decks at front & rear; interior alterations to basement for proposed retail space; maintain ground floor retail.Inspection
2004-03-24Minor variance
A0073/04TEY
The applicant is seeking relief from the provisions of Zoning By-law No. 438-86, as amended, in order to maintain the existing dwelling unit on the second floor of the non-residential building, without providing the required parking. It is also proposed to construct a third floor addition towards the middle of the building, with decks at the front and rear, in conjunction with the existing dwelling unit, as well as, to make alterations to the basement for the existing retail use. The addition, decks and basement alterations and uses within the building comply with the provisions of the by-law.Approved
2003-09-24Consent (lot split)
B0057/03TEY
This application also involves No. 199 Queen Street East. The applicant is seeking permission to sever the subject site into two parcels of land, one of the parcels fronting onto Queen Street will have a frontage of 9.144 metres and a depth of 18.125 metres. While the second parcel fronting onto Britain Street will have a frontage of 9.144 metres and a depth of 16.183 metres. The existing buildings located on the lands are to be maintained on each of the two proposed lots.Approved
Minor

Restrictions

How much heritage, nature and site-specific rules limit changes to the house

  • Site-specific exception 900.11.10(333)
  • Priority retail street: Queen Street East
  • No heritage listing or designation

What this part means for this house, in plain EnglishUnlock

  1. Site-specific exception 900.11.10(333)

    ModerateCheck if it applies

    What the record shows, what it means for you and what to doUnlock

  2. Priority retail street: Queen Street East

    LowFor later, once you own it

    What the record shows, what it means for you and what to doUnlock

  3. King-Parliament Secondary Plan

    LowFor later, once you own it

    What the record shows, what it means for you and what to doUnlock

If you want to change or build

What the site-specific rules mean for an addition, a garage or a rebuild.

Site-specific exception 900.11.10(333)

What the exception changes for this address, rule by ruleUnlock

Not on this lot

Flood and erosion rules

How much of the lot lies in the areas TRCA regulates for flooding and erosion

  • Outside the areas TRCA regulates

From TRCA's regulated areas only. Basement flooding, sewer back-up and the TRCA flood plain are not in this score yet; ask the seller and your insurer about water in the basement.

What this part means for this house, in plain EnglishUnlock

Little left to add

Build potential

How much more the rules allow on this lot, beyond what is on record

What this part means for this house, in plain EnglishUnlock

The lot and what the rules allow

N10 m
9.1 m frontage18.3 m deepon Queen St E
Zone
CR 4.5 (c2.0; r4.0) SS2 (x333)
Height limit
30 m
Corner lot
No
Public lane
None
House footprint
153 m²
Back yard
0 m
Buildings on the lot
1

House and yards from the City's 3D Massing; a survey gives exact figures.

What you can build

    Why, measured on this lot, and the most you could buildUnlock

    Busy

    Building nearby

    How much neighbours are building and applying to change within 300 m

    • 7 development applications open within 300 m, up to 39 storeys
    • In the Corktown station area
    • 18 minor variance decisions within 300 m, 100% approved

    What this part means for this house, in plain EnglishUnlock

    1. 7 development applications open within 300 m

      LowCheck if it applies

      What the record shows, what it means for you and what to doUnlock

    What the City allowed next door

    Within 500 m, last 10 years: a guide if you plan to build or apply for something similar.

    What neighbours have built and changed around you, and how the City decidedUnlock

    Crime above median

    Area safety

    Police-reported crime in the neighbourhood against the Toronto median

    • Lower than the Toronto median in 3 of 8 categories
    • Assault: 3.5 times the Toronto median
    • Robbery: 2.4 times the Toronto median
    • Break and enter: 2.0 times the Toronto median

    Neighbourhood rates per 100,000 people from the Toronto Police Service, not this street.

    What this part means for this house, in plain EnglishUnlock

    Moss Park neighbourhood

    About the area, not this house.

    2021 Census, against the median Toronto neighbourhood

    Median household income (2020)$65,000median $84,500
    Households that own their home35%median 54%
    Population (2021)21,490median 16,813
    Homes built in 1960 or before17%median 29%
    Homes needing major repairs8%median 7%

    Getting around and schools

    • Queen StationNearest station11 min walk
    • Queen St East at Sherbourne StNearest TTC stop2 min walk
    • Richmond St ENearest cycling route2 min walk
    • Ecole Elementaire Gabrielle RoySchool5 min walk
    • George Brown College - St James CampusSchool5 min walk
    • Liberty Prep SchoolSchool8 min walk
    • Keystone International SchoolsSchool9 min walk

    Police-reported crime, 2025, per 100,000 people

    • Assaultcity median 636.32226.8
    • Robberycity median 69.5166.6
    • Homicidecity median 5.33.4
    • Shootingscity median 10.53.4
    • Auto theftcity median 192.681.6
    • Theft over $5,000city median 46.164.6
    • Break and entercity median 172.8350.2
    • Theft from vehiclescity median 188.1275.4

    More about Moss Park

    Ready emails

    Copy and send as they are.

    2 questions for the seller and your lawyer, written outUnlock

    What we checked, and what the City's records don't cover

    We checked 48 sets of City of Toronto, TRCA and Statistics Canada open data for this address, last updated Nov 27, 2026. Our records don't cover flooding history, ownership and mortgages, or the condition of the house: ask the seller and your insurer about water in the basement, your lawyer about title, and book a home inspection.

    See every source and when we loaded it · Pre-offer checklist

    Something here not right?

    Screening tool based on City of Toronto and TRCA open data. Not a zoning review or legal opinion. Site-specific exceptions, amendments not yet in the open data, minor variances and other by-laws can change the answer. Confirm with a Preliminary Project Review or Zoning Certificate from Toronto Building before buying or designing.

    Scores calibrated on Toronto house lots on 2026-10-19; prices and sources checked on 2026-10-06. Contains information licensed under the Open Government Licence – Toronto. TRCA regulation limits © Toronto and Region Conservation Authority.

    Full pre-offer report · 197 Queen St E

    1 thing to check at 197 Queen St E before you offer

    • 4 building permits open, the oldest since 2005Moderate
    • Site-specific exception 900.11.10(333)Moderate
    • 7 development applications open within 300 mLow
    • Priority retail street: Queen Street EastLow
    • and 2 more

    The report explains what each one can cost you on this house and what to ask the seller or the City before you offer.

    $29 CAD one time · opens right away

    See a sample report

    Full refund within 30 days if the report left out or misstated a City record on the lot. Refund policy

    Also in the report

    • A PDF to forward to your agent and lawyer
    • What you can build on this lot, measured on it
    • Every line linked to the City record it comes from
    • 15 sets of public records, already searched and read for you
    • A clear list of the 6 steps to take before you offer, so nothing slips
    • What each of the 6 findings can cost you or stop you doing, in plain English
    • A two-minute summary of this house, and what to find out first before you offer
    • What the City allowed your neighbours, a guide if you plan to build or apply for something similar
    • We watch this address for 90 days. If anything changes in the City's records, we email you the same day
    • A short summary of each part: City files, restrictions, flood and erosion, build potential, building nearby, area safety

    By paying you agree to the terms of use and the refund policy. Payment by Stripe. The report opens right after payment, and we email you a link to it; your account is made from the email you pay with. A screening of public records, not a legal opinion or a home inspection.

    Flag an error

    What is not right?

    The problem

    The records come from the City's open data; we check each flag against them. Your email is used only to answer this.