This house at a glance
Each score from 0 to 10: 0 needs attention, 10 all clear. Build potential is how much more you could add.
About 197 King St E
197 King St E is on a 11 m by 36.6 m lot on King St E in Moss Park. The zoning is CR. A site-specific exception, 900.11.10(339), changes some of the usual rules for this address. The property is designated under Part IV of the Ontario Heritage Act, so changes to its heritage features need a City heritage permit.
The City has 25 records on this lot since 1983. That is more than at 99% of Toronto houses. In 2026, a building permit was filed: "2 wall signs**skoom**". Status: permit issued. In 2026, a building permit was filed: "Revision 04 - relocation of bathroomrevision 03 - hvac revision 02 - revised interior alterations to remove second elevator and garbage…". Status: closed. In 2026, a building permit was filed: "Drain - proposed interior alterations for group a2 occupancy with 38 seats". Status: closed. 2 open permits mean the City has not closed the files. Ask the seller whether the work was finished and passed its final inspection.
Within 300 m, 9 development applications are open (the tallest up to 46 storeys). Within 300 m, the Committee of Adjustment decided 8 minor variance applications in the last 10 years and approved 100%. King station is a 11-minute walk, and the lot is in its Major Transit Station Area.
Summary
What the City's records show on this house
- Heritage property: designated (Part IV)Moderate
- Work or applications in progressModerateFree check
- Site-specific exception 900.11.10(339)Moderate
- 3 by-law investigations closed in the last two yearsLow
- 9 development applications open within 300 mLowFree check
- Priority retail street: King Street EastLow
- 1 City tree in front of this lotLowFree check
- King-Parliament Secondary PlanLow
- 2 Committee of Adjustment files on this lotLowFree check
Left unchecked, any of these can mean unexpected costs, trouble after closing, or plans you can't carry out. Found before you offer, they give you room to negotiate. The full report explains what each one means for this house and what to do next.
15 sets of public records, already checked for you. Searching each one yourself and working out what it means for you takes time. We have done that work: what matters about this house and lot, in plain English, in a few minutes.
What to find out first
2 things to check before you offer.
What to find out before an offer, the steps to take, what each costs and how long it takesUnlock
Open City files
How much in the City's records needs answers before an offer
- Work or applications in progress
- 3 by-law investigations closed in the last two years
- No open orders or by-law investigations
What this part means for this house, in plain EnglishUnlock
Work or applications in progress
ModerateCheck before you offerSee the open permit check for this house
What the record shows, what it means for you and what to doUnlock
3 by-law investigations closed in the last two years
LowCheck if it appliesWhat the record shows, what it means for you and what to doUnlock
2 Committee of Adjustment files on this lot
LowFor later, once you own itSee the next door check for this house
What the record shows, what it means for you and what to doUnlock
What this means: Building permits before buyingWhat this means: Committee of Adjustment
City files on this lot
25 records on file, more than at 99% of Toronto houses (median 0 records).
| Date | Record | As the City filed it | In plain words | Status |
|---|---|---|---|---|
| 2026-05-11 | Building permit26 131741 | 2 WALL SIGNS**SKOOM** | Permit Issued | |
| 2026-05-07 | Zoning review26 156589 LPR | No description on file | Application On Hold | |
| 2026-05-07 | Building permit20 183972 | Revision 04 - Relocation of bathroomRevision 03 - HVAC Revision 02 - Revised Interior alterations to remove second elevator and garbage chute------------------------------------------------------------------------Revision 01 - Proposal for interior layouts and openings revisionsHVAC - Proposal to construct a four storey addition over existing four storey building, and interior alterations to convert from restaurant/residential to restaurant/hotel use. | Closed | |
| 2026-01-16 | Building permit25 265543 | Drain - Proposed interior alterations for Group A2 Occupancy with 38 Seats. | Closed | |
| 2025-11-11 | By-law investigation25 252362 PRS 00 IR | Property Standards | Closed | |
| 2025-03-04 | Building permit24 185358 | 1 WALL SIGN 1 PROJECTING SIGN | Permit Issued | |
| 2025-02-05 | By-law investigation25 113246 PRS 00 IR | Property Standards | Closed | |
| 2024-11-27 | By-law investigation24 244164 PRS 00 IR | Property Standards | Closed | |
| 2024-07-05 | Building permit24 175385 | 1 WALL SIGN1 PROJECTING SIGN | Cancelled | |
| 2020-02-26 | Minor varianceA1124/19TEY | To alter the existing 4-storey mixed-use building by constructing additions above and to the rear resulting in an 8-storey mixed use building containing a commercial restaurant use at the ground floor and basement with hotel suites above. | Approved | |
| 2019-06-13 | Zoning review19 170892 ZZC | No description on file | Closed | |
| 2018-11-16 | Zoning review18 257632 ZPR | No description on file | Closed | |
| 2018-11-16 | Zoning review18 257641 ZPR | No description on file | Closed | |
| 2016-02-03 | Minor varianceA0129/16TEY | To alter the existing four-storey mixed use building by converting the ground floor and basement levels into a restaurant use, and the second, third, and fourth floors into residential uses containing five residential dwelling units. | Withdrawn | |
| 2015-09-18 | Building permit15 224914 | Proposal for interior alterations to convert existing mixed-use four-storey building into a mixed-use building containing a restaurant of 145 seats on the ground and basement level, 3 residential units on second and third floors, with residential recreational area on second level. | Cancelled | |
| 2015-05-05 | Zoning review15 151517 LPR | No description on file | Closed | |
| 2015-01-15 | Zoning review15 104570 LTO | No description on file | Closed | |
| 2014-10-29 | Zoning review14 244857 LTO | No description on file | Closed | |
| 1997-11-13 | Building permit97 021783 | ALTER PLAN AS APPROVED UNDER FILE #359375 BY CONVERTING EXISTING 4 STOREY BUILDING TO A TWO STOREY BUILING BY DELETING PROPOSED WORK ON 3RD. AND 4TH. FLOORS. | Closed | |
| 1997-11-13 | Building permit97 022702 | SUPPLY AND INSTALL H.V.A.C. REFER TO 403-607 FOR COST AND PLANS | Closed - Dormant | |
| 1994-11-09 | Building permit94 021720 | ALTER BP 359375 BY CHANGING LAYOUT AND MAKING INTERIOR ALTERS TO BASEMENT, GROUND FLOOR AND 2ND FL. LANDING, AND ELEVATION ALTERS. ATTENTION: WADE TAM "HISTORICAL" (WARD 6) /SP | Closed | |
| 1994-11-07 | Building permit94 017113 | SUPPLY & INTALL HVAC REFER TO #359375 FOR COST AND PLANS | Closed | |
| 1994-07-11 | Building permit94 014763 | MAKE INTERIOR ALTERATIONS. SF | Closed | |
| 1990-05-11 | Building permit90 016865 | BASEMENT ADDITION AND UNDERPIN FOUNDATION WALLS. JG | Closed | |
| 1983-01-20 | Zoning review83 025497 LTO | No description on file | Closed |
Restrictions
How much heritage, nature and site-specific rules limit changes to the house
- Heritage property: designated (Part IV)
- Site-specific exception 900.11.10(339)
- Priority retail street: King Street East
What this part means for this house, in plain EnglishUnlock
Heritage property: designated (Part IV)
ModerateCheck before you offerWhat the record shows, what it means for you and what to doUnlock
Site-specific exception 900.11.10(339)
ModerateCheck if it appliesWhat the record shows, what it means for you and what to doUnlock
Priority retail street: King Street East
LowFor later, once you own itWhat the record shows, what it means for you and what to doUnlock
1 City tree in front of this lot
LowFor later, once you own itSee the tree permit check for this house
What the record shows, what it means for you and what to doUnlock
King-Parliament Secondary Plan
LowFor later, once you own itWhat the record shows, what it means for you and what to doUnlock
What this means: Toronto Heritage RegisterWhat this means: Toronto zoning by address
If you want to change or build
What the site-specific rules mean for an addition, a garage or a rebuild.
Site-specific exception 900.11.10(339)
What the exception changes for this address, rule by ruleUnlock
Flood and erosion rules
How much of the lot lies in the areas TRCA regulates for flooding and erosion
- Outside the areas TRCA regulates
From TRCA's regulated areas only. Basement flooding, sewer back-up and the TRCA flood plain are not in this score yet; ask the seller and your insurer about water in the basement.
What this part means for this house, in plain EnglishUnlock
Build potential
How much more the rules allow on this lot, beyond what is on record
What this part means for this house, in plain EnglishUnlock
The lot and what the rules allow
- Zone
- CR SS1 (x339)
- Height limit
- 90 m
- Corner lot
- No
- Public lane
- None
- House footprint
- 224 m²
- Back yard
- 5.1 m
- Buildings on the lot
- 2
House and yards from the City's 3D Massing; a survey gives exact figures.
What you can build
Why, measured on this lot, and the most you could buildUnlock
Building nearby
How much neighbours are building and applying to change within 300 m
- 9 development applications open within 300 m, up to 46 storeys
- In the Corktown station area
- 8 minor variance decisions within 300 m, 100% approved
What this part means for this house, in plain EnglishUnlock
9 development applications open within 300 m
LowCheck if it appliesSee the next door check for this house
What the record shows, what it means for you and what to doUnlock
What the City allowed next door
Within 500 m, last 10 years: a guide if you plan to build or apply for something similar.
What neighbours have built and changed around you, and how the City decidedUnlock
Area safety
Police-reported crime in the neighbourhood against the Toronto median
- Lower than the Toronto median in 3 of 8 categories
- Assault: 3.5 times the Toronto median
- Robbery: 2.4 times the Toronto median
- Break and enter: 2.0 times the Toronto median
Neighbourhood rates per 100,000 people from the Toronto Police Service, not this street.
What this part means for this house, in plain EnglishUnlock
Moss Park neighbourhood
About the area, not this house.
2021 Census, against the median Toronto neighbourhood
Getting around and schools
- King StationNearest station11 min walk
- King St West at Jarvis St East SideNearest TTC stop2 min walk
- Adelaide St ENearest cycling route2 min walk
- George Brown College - St James CampusSchool1 min walk
- St Michael Catholic Elementary School - Bldg 1School5 min walk
- Downtown Alternative SchoolSchool5 min walk
- Market Lane Jr & Sr Public SchoolSchool7 min walk
Police-reported crime, 2025, per 100,000 people
- Assaultcity median 636.32226.8
- Robberycity median 69.5166.6
- Homicidecity median 5.33.4
- Shootingscity median 10.53.4
- Auto theftcity median 192.681.6
- Theft over $5,000city median 46.164.6
- Break and entercity median 172.8350.2
- Theft from vehiclescity median 188.1275.4
Ready emails
Copy and send as they are.
4 questions for the seller and your lawyer, written outUnlock
What we checked, and what the City's records don't cover
We checked 48 sets of City of Toronto, TRCA and Statistics Canada open data for this address, last updated Nov 27, 2026. Our records don't cover flooding history, ownership and mortgages, or the condition of the house: ask the seller and your insurer about water in the basement, your lawyer about title, and book a home inspection.
See every source and when we loaded it · Pre-offer checklist