HousePrecheckCheck an address

1963 Yonge StToronto · zoning, lot size and permit records

Also 1965 Yonge St, 1967 Yonge St, 1969 Yonge St, 1971 Yonge St, 1973 Yonge St and 1 more

Commercial residential · CR SS2 (x562)≈ 25.1 × 89.4 m1,188 m²on Millwood Rdcorner, also on Yonge St

Not a home

A commercial or mixed-use building

7 different civic addresses share this parcel, in a commercial zone: shops, offices or a mixed-use building rather than one house. It is not a home for sale, so the house checks and the pre-offer report do not apply.

Looking at a house nearby? What this means for you

  • Shops, offices or a mixed buildingCustomers, deliveries and evening activity; errands within a short walk.
  • Permits or applications open on this parcelRecent records on this lot: 22 134578 (Application for a permit to erect and display one illuminated projecting sign.*****CAFE..., 2022). Larger work can mean noise and trucks next door; read what each one is for.
  • 15 development applications open within 300 m, up to 48 storeysNew buildings may go up around here in the next years. More change nearby than at 100% of Toronto houses.
  • Major Transit Station Area: DavisvilleThe City plans more homes around the station: good for transit, and more building over time.
N50 m
≈ 25.1 m frontage≈ 89.4 m deepirregular lot, estimated

Before you offer

From the City's records on this lot. Each item says what it means for a purchase and how to confirm it.

  • 2 building permits open, the oldest since 2001

    Needs a closer look

    Still open in the City's records: 03 101188 (make interior alterations to ground floor existing service, rental and repair shop and..., 2003, status Inspection); 01 108274 (Provide temporary shoring of courtyard slab and repairs, 2001, status Inspection).

    What it means. An open permit can mean work that was never finished or never passed final inspection. After closing, finishing it or closing the file can fall to you.

    How to confirm. Ask the seller for the final inspection records. A Property Information Report from Toronto Building lists open permits, inspections and outstanding orders ($214.79, about five business days). Details

    City of Toronto, Building Permits (active, cleared since 2017, cleared 2000-2016)
  • Work or applications in progress

    Good to know

    Recent records on this lot: 22 134578 (Application for a permit to erect and display one illuminated projecting sign.*****CAFE..., 2022).

    What it means. The owner has planned or started work. Ask what it covers, whether it will be finished before closing, and who pays for what is left.

    How to confirm. Application details and decisions are in the City's Application Information Centre. A Property Information Report from Toronto Building lists open permits, inspections and outstanding orders ($214.79, about five business days). Details

    City of Toronto, Building Permits (active, cleared since 2017, cleared 2000-2016); City of Toronto, Committee of Adjustment applications (2001 onwards); City of Toronto, Development Applications
  • 15 development applications open within 300 m

    Good to know

    15 rezoning, site plan, subdivision or condominium applications within 300 m, submitted in the last 10 years, are not closed yet, including buildings of up to 48 storeys. They are listed under Around this lot.

    What it means. New buildings nearby can change views, sunlight, traffic and construction noise for years.

    How to confirm. Each application, its drawings and its status are in the Application Information Centre. Details

    City of Toronto, Development Applications

Not in these records

  • Flooding history. Past basement flooding and insurance claims on this house are not published. Ask the seller directly and ask your insurer before you firm up the offer.
  • Ownership, mortgages and easements. Title is not open data. Your lawyer searches title after the offer; ask for the survey and any easements before.

History of this lot

36 records on file: more than at 100% of Toronto houses (median 0).

  • Building permit24 171313Closed

    Application for a permit to erect and display one (1) first party wall sign, displaying static copy and illuminated, erected at the first storey. Dimensions: 0.61m (L) x 5.86m (W) at a height of 3.18m.***ORBIT MONEY***

    Jul 3, 2024 · 1973 YONGE ST
  • Building permit24 146494Cancelled

    1 Wall sign

    May 9, 2024 · 1973 YONGE ST
  • Building permit24 144724Cancelled

    1 WALL SIGN

    May 6, 2024 · 1973 YONGE ST
  • Zoning review24 139285 LTOClosed
    Apr 23, 2024 · 1975 YONGE ST
  • Zoning review24 109561 LTOClosed
    Jan 30, 2024 · 1975 YONGE ST
  • Building permit23 231140Closed

    Proposal for interior alterations to convert existing vacant space to office.

    Dec 11, 2023 · 1973 YONGE ST
  • Zoning review23 221432 ZAPClosed
    Nov 2, 2023 · 1973 YONGE ST
  • Building permit23 121090Closed

    PROPOSED: RENOVATION OF THE BUILDING FOR A BEAUTY SPA, NO STRUCTURE CHANGE INVOLVED, ONLY PARTITION WALLS AND NEW MECHANICAL SYSTEM.

    Apr 6, 2023 · 1975 YONGE ST
Show 28 older records
  • Building permit22 130321Closed

    Interior alterations - Cobs Bread - Unit 18-22

    Aug 17, 2022 · 1965-1971 YONGE ST
  • Zoning review22 184405 LTOClosed
    Aug 1, 2022 · 1965-1971 YONGE ST
  • Zoning review22 138778 LTOClosed
    Apr 27, 2022 · 1965-1971 YONGE ST
  • Building permit22 134578Examiner's Notice Sent

    Application for a permit to erect and display one illuminated projecting sign.*****CAFE PLENTY*****

    Apr 14, 2022 · 1975 YONGE ST
  • Building permit21 166885Closed

    Proposal for interior alterations from vacant to take out restaurant. ground floor "Cafe Plenty"

    Aug 23, 2021 · 1965 YONGE ST
  • Building permit16 237639Closeddemolition

    Proposal to demolish existing 3 storey mixed use building.

    Dec 13, 2017 · 1975 YONGE ST
  • Building permit16 237520Closeddemolition

    Proposal to demolish existing 3 storey mixed use building.

    Dec 13, 2017 · 1973 YONGE ST
  • Building permit16 237504Closeddemolition

    Proposal to demolish existing 1 storey service/rental/repair shop & retail store.

    Mar 8, 2017 · 1965-1971 YONGE ST
  • Zoning review11 253138 LTOClosed
    Aug 8, 2011 · 1965 YONGE ST
  • Zoning review11 247647 LTOClosed
    Jul 28, 2011 · 1973 YONGE ST
  • Zoning review09 169963 LTOClosed
    Sep 17, 2009 · 1965 YONGE ST
  • Building permit08 223379Closed

    Proposal for interior alterations to existing video store "Rogers Plus" (171.86m2). Convenience address: 1971 Yonge St.

    Dec 23, 2008 · 1965 YONGE ST
  • Building permit07 248640Closed

    interior alterations to increase from 16 seats to 89 seats.

    Dec 12, 2007 · 1973 YONGE ST
  • Building permit07 171405Closed

    Provide fire suppression system for existing exhaust hood.

    May 15, 2007 · 1973 YONGE ST
  • Zoning review05 141698 LTOClosed
    Jun 10, 2005 · 1973 YONGE ST
  • Zoning review03 198113 ZSVClosed
    Dec 4, 2003 · 1965 YONGE ST
  • Building permit03 101188Inspection

    make interior alterations to ground floor existing service, rental and repair shop and retail store

    Feb 3, 2003 · 1965-1971 YONGE ST
  • Building permit01 108274Inspection

    Provide temporary shoring of courtyard slab and repairs

    Feb 14, 2001 · 1975 YONGE ST
  • Zoning review98 026105 LTOClosed
    May 7, 1998 · 1973 YONGE ST
  • Zoning review98 025854 LTOClosed
    Mar 18, 1998 · 1973 YONGE ST
  • Zoning review97 026126 LTOClosed
    Mar 26, 1997 · 1965-1971 YONGE ST
  • Zoning review97 025810 LTOClosed
    Jan 14, 1997 · 1965-1971 YONGE ST
  • Zoning review97 025791 LTOClosed
    Jan 2, 1997 · 1965-1971 YONGE ST
  • Zoning review96 025688 LTOClosed
    Nov 18, 1996 · 1965-1971 YONGE ST
  • Zoning review90 028370 LTOClosed
    Apr 25, 1990 · 1973 YONGE ST
  • Zoning review85 026419 LTOClosed
    Feb 13, 1985 · 1973 YONGE ST
  • Zoning review85 026328 LTOClosed
    Jan 18, 1985 · 1973 YONGE ST
  • Zoning review83 025673 LTOClosed
    Mar 7, 1983 · 1973 YONGE ST

Check before you build

  • Site-specific exception 900.11.10(562)

    Needs a closer look

    8 site-specific rules and 8 older by-laws that still prevail apply to this lot. They can override the standard rules on this page.

    Zoning By-law 569-2013, Chapter 900
Exception 900.11.10(562)Applies

These parts of the exception apply to this lot's address.

  1. Rule A

    These premises must comply with Regulation 900.11.10(729)

  2. Rule B

    These premises must comply with Regulation 900.11.10(730)

  3. Rule C

    These premises must comply with Regulation 900.11.10(731)

  4. Rule D

    These premises must comply with Regulation 900.11.10(732)

  5. Rule E

    These premises must comply with Regulation 900.11.10(733)

  6. Rule F

    These premises must comply with Regulation 900.11.10(735)

  7. Rule G

    The required minimum street yard setback is 1.5 metres

  8. Rule H

    The required minimum floor space index of all land uses on a lot is 2.0. Prevailing By-laws and Prevailing Sections: (A) Former City of Toronto By-law 236-2011.

  9. Older by-law A

    These premises must comply with Regulation 900.11.10(729)

  10. Older by-law B

    These premises must comply with Regulation 900.11.10(730)

  11. Older by-law C

    These premises must comply with Regulation 900.11.10(731)

  12. Older by-law D

    These premises must comply with Regulation 900.11.10(732)

  13. Older by-law E

    These premises must comply with Regulation 900.11.10(733)

  14. Older by-law F

    These premises must comply with Regulation 900.11.10(735)

  15. Older by-law G

    The required minimum street yard setback is 1.5 metres

  16. Older by-law H

    The required minimum floor space index of all land uses on a lot is 2.0. Prevailing By-laws and Prevailing Sections: (A) Former City of Toronto By-law 236-2011.

By-law 569-2013, Chapter 900

Lot facts

Area
1,188 m²
Frontage
25.1 mestimated, irregular lot
Depth
89.4 mestimated, irregular lot
Street
Millwood Rd
Corner lot
Yes, also on Yonge St89.4 m along it
Public lane
None
House footprint
830 m²
Back yard
3.1 mhouse to rear lot line
Side yards
0 m and 3.4 mhouse to side lot lines; 0 is a shared wall
Buildings on the lot
4house, garage, sheds
Max height
25.5 m
Max lot coverage
—

House and yards are measured from the City's 3D Massing footprints, which are for illustration; a survey gives the exact figures.

  • Major Transit Station Area: Davisville. The lot is inside the Davisville Major Transit Station Area approved by the Province (Site and Area Specific Policy 722). Source
  • Yonge-Eglinton Secondary Plan. A Secondary Plan sets more detailed land use, height and density policies for this area. Source
  • Zone CR SS2 (x562) (Commercial Residential). Chapter 40, section 40.10 of the by-law. Source

Around this lot

Minor variances approved
88%21 of 24 decisions
Garden suite permits
0
Laneway suite permits
0
Multiplex permits
7
Development applications
27

Within 300 m, last 10 years. 7 suite and multiplex permits: more than at 67% of Toronto houses (median 3). 24 variance decisions: more than at 55% of Toronto houses (median 19).

Recent variance decisions in the same zone

  • Minor varianceApproved

    To alter the existing 12-storey apartment building (Building A) by enclosing the double-height opening within Unit 417 (located on the fourth and fifth levels) for additional habitable space.

    119 MERTON ST · Nov 19, 2025 · 500 m away
  • Minor varianceApproved

    To alter the mezzanine levels within two adjacent dwelling units (units 1210 and 1216).

    119 MERTON ST · May 31, 2023 · 500 m away
  • Minor varianceApproved

    To permit a lower percentage of units with three bedrooms or more within a new 12-storey mixed-use building (that will contain 7 rental replacement suites and a total of 76 residential dwelling units).

    2100 YONGE ST · Sep 7, 2022 · 323 m away
  • Minor varianceApproved

    To legalize and to maintain the shed that has been constructed between the two-storey building and the detached garage, without the benefit of a building permit.

    1913 YONGE ST · Jun 8, 2022 · 144 m away
  • Minor varianceApproved

    To alter the 10-storey, 56-unit mixed-use development, approved under Site Specific By-law No. 1173-2015, by permitting two additional storeys, increasing the height of the retail level, converting a part of a residential unit on the second storey to amenity space, and converting two regular parking spaces on level P2 into one accessible parking space, for a total of 70 residential units.

    2112 YONGE ST · May 18, 2022 · 348 m away

Latest activity nearby

  • Zoning review

    Not Started

    3 GLEBE RD E · Nov 24, 2026 · 140 m away
  • Zoning review

    Not Started

    21 IMPERIAL ST · Nov 24, 2026 · 73 m away
  • Zoning review

    Not Started

    1991 YONGE ST · Nov 23, 2026 · 77 m away
  • Building permit

    Proposal to construct an one-storey rear yard addition and new deck.See also 26-255451 ZAP 00 ZR

    30 CHAPLIN CRES · Nov 20, 2026 · 240 m away
  • Zoning review

    Not Started

    2039 YONGE ST · Nov 6, 2026 · 217 m away
  • Zoning review

    Closed

    1920 YONGE ST · Oct 29, 2026 · 128 m away
  • Building permit

    INTERIOR ALTERATIONS - DEMISING PARTITION - UNIT 906

    1867 YONGE ST · Oct 29, 2026 · 296 m away
  • Building permit

    Proposal for interior alterations to existing commercial suite into a veterinary clinic.

    2008 YONGE ST · Oct 28, 2026 · 102 m away
  • Building permitdemolition

    Proposed demolition of the existing 5-storey commercial building.

    25 IMPERIAL ST · Oct 23, 2026 · 87 m away
  • Building permitdemolition

    Proposal to demolish the existing 2 storey office building located at 21 IMPERIAL ST only.

    21 IMPERIAL ST · Oct 23, 2026 · 73 m away

Neighbourhood: South Eglinton-Davisville

About the area around the lot, not the lot itself.

Nearest station
Davisville Station4 min walk
Nearest TTC stop
Yonge St at Belsize Dr1 min walk
Nearest cycling route
Yonge StCycle Track, 3 min walk
Nearest traffic count
16,691 vehicles in 14 hYonge St / Imperial St, 20 m away, Sep 24, 2024
Serious collisions within 500 m
52021–2026, killed or seriously injured: 2 fatal, 3 with pedestrians, 0 with cyclists
Parks
Fiona Nelson Parkette2 min walk
Oriole Park - Toronto5 min walk
Glebe Manor Square6 min walk

Schools within 1 km

  • THE STUDY ACADEMY Private 3 min walk
  • DAVISVILLE & SPECTRUM SCHOOL English Public 3 min walk
  • THE STUDY ACADEMY SCHOOL Private 3 min walk
  • MANOR MONTESSORI - DE SAVERY SITE Private 11 min walk
  • BIRMINGHAM INTERNATIONAL COLLEGIATE OF CANADA Private 13 min walk
  • TORONTO PREP SCHOOL Private 13 min walk

Being near a school does not mean the lot is in its catchment; check with the board.

2021 Census

FigureSouth Eglinton-DavisvilleMedian neighbourhood
Median household income (2020)$80,000$84,500
Households that own their home30%54%
Population (2021)22,73516,813
Homes built in 1960 or before11%29%
Homes needing major repairs3%7%

Statistics Canada 2021 Census, 25% sample, by City of Toronto neighbourhood.

Police-reported crime, 2025

Per 100,000 peopleSouth Eglinton-DavisvilleCity median
Assault436636.3
Robbery24.269.5
Auto theft58.8192.6
Theft over $5,00020.846.1
Break and enter128172.8
Theft from vehicles100.3188.1

Neighbourhood totals from the Toronto Police Service. Rates are per resident, so areas with many visitors and few residents read high.

Something here not right?

Sources

  • Building permits on this lot since 2000: Permits issued or applied for since about 2000, with status.
  • Committee of Adjustment files since 2001: Minor variances and consents (lot splits) on this lot and nearby, with decisions.
  • Development applications: Rezoning, site plan, subdivision and condominium applications.
  • Preliminary zoning reviews: Zoning reviews requested before a permit or variance application.
  • Zoning and overlays: Zoning By-law 569-2013 zone, height, coverage, policy area, parking, rooming house, priority retail street and downtown setback overlays.
  • Lot boundary, street and lane: Lot polygon, its addresses, the street it fronts, corner and public lane contact, with frontage and depth measured from the boundary; City of Toronto land in City use, which is not a home.
  • House and yards: Footprint and roof height of the house and other buildings, and the yard behind the house, from the City's 3D Massing (updated yearly, illustrative).
  • City trees in front of the lot: City-owned trees on the street allowance at this address, with species and trunk diameter. Private trees on the lot are not in open data.
  • Heritage: Heritage Register (listed and designated properties), Official Plan Amendment 720 properties and properties removed from the Register under the 2022 two-year limit.
  • TRCA regulated area: Valleys, floodplains, shorelines and wetlands regulated by the Toronto and Region Conservation Authority.
  • Ravines and natural features: Ravine and Natural Feature Protection area (Chapter 658, map last published 2019), Natural Heritage System and Environmentally Significant Areas.
  • Official Plan policies: Site and Area Specific Policies, Secondary Plans and Major Transit Station Areas covering the lot.
  • Rooming houses, short-term rentals and rental buildings: Multi-tenant house licences, short-term rental registrations and RentSafeTO evaluations at this address.
  • Neighbourhood context: Neighbourhood, 2021 Census figures, police-reported crime rates, schools, parks, TTC stops, cycling routes, serious collisions and traffic counts nearby. Area context only, not a finding about the lot.
  • Orders and by-law investigations: Outstanding Toronto Building orders, and by-law investigations open now or closed in the last two years. Fire and Public Health orders and older closed files are not published.
  • Address points: loaded Nov 22, 2026, published Nov 20, 2026
  • Toronto Building orders: loaded Nov 28, 2026, published Nov 27, 2026
  • Neighbourhood Profiles, 2021 Census: loaded Oct 14, 2026, published Oct 6, 2023
  • Street centrelines: loaded Nov 22, 2026, published Nov 20, 2026
  • City-owned land: loaded Nov 22, 2026, published Nov 16, 2026
  • Committee of Adjustment open applications: loaded Nov 28, 2026, published Nov 27, 2026
  • Committee of Adjustment decisions: loaded Nov 28, 2026, published Nov 27, 2026
  • Committee of Adjustment decisions 2001-2016: loaded Oct 14, 2026, published Feb 20, 2026
  • Collisions with people killed or seriously injured (Toronto Police Service): loaded Nov 22, 2026, published Nov 21, 2026
  • Neighbourhood crime rates (Toronto Police Service): loaded Oct 14, 2026, published Feb 20, 2026
  • Cycling network: loaded Nov 22, 2026, published Nov 16, 2026
  • Development applications: loaded Nov 28, 2026, published Nov 28, 2026
  • Environmentally Significant Areas: loaded Oct 14, 2026, published Mar 16, 2026
  • Green spaces: loaded Nov 15, 2026, published Nov 10, 2026
  • Heritage register: loaded Oct 14, 2026, published Sep 1, 2026
  • Former heritage listings: loaded Oct 14, 2026, published Jul 3, 2025
  • Official Plan Amendment 720 heritage list: loaded Oct 14, 2026, published Sep 1, 2026
  • 3D Massing building footprints: loaded Oct 14, 2026, published Dec 2, 2025
  • By-law investigation addresses: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigation deficiencies: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigations: loaded Nov 28, 2026, published Nov 27, 2026
  • Major Transit Station Areas: loaded Oct 14, 2026, published Feb 3, 2026
  • Natural Heritage System: loaded Oct 14, 2026, published Mar 16, 2026
  • Neighbourhoods: loaded Oct 14, 2026, published Feb 20, 2026
  • Property boundaries: loaded Nov 27, 2026, published Nov 27, 2026
  • Active building permits: loaded Nov 28, 2026, published Nov 27, 2026
  • Cleared building permits: loaded Nov 28, 2026, published Nov 27, 2026
  • Cleared building permits 2000-2016: loaded Oct 14, 2026, published Jul 8, 2025
  • Preliminary zoning reviews: loaded Nov 28, 2026, published Nov 27, 2026
  • Ravine and natural feature protection: loaded Oct 14, 2026, published Jul 23, 2019
  • RentSafeTO evaluations: loaded Nov 28, 2026, published Nov 27, 2026
  • Multi-tenant house licences: loaded Nov 28, 2026, published Nov 27, 2026
  • Site and Area Specific Policies: loaded Oct 14, 2026, published Mar 16, 2026
  • School locations: loaded Oct 14, 2026, published May 27, 2026
  • Secondary Plans: loaded Oct 14, 2026, published Mar 16, 2026
  • Street trees: loaded Oct 14, 2026, published Jun 4, 2026
  • Short-term rental registrations: loaded Nov 28, 2026, published Nov 27, 2026
  • Traffic counts at intersections: loaded Nov 22, 2026, published Nov 21, 2026
  • TRCA regulation limit: loaded Oct 14, 2026, published Apr 29, 2026
  • TTC stops (GTFS): loaded Nov 8, 2026, published Nov 5, 2026
  • Zoning by-law: loaded Oct 14, 2026, published Feb 20, 2026
  • Lot coverage overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Height overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Parking zone overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Policy area overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Priority retail streets: loaded Oct 14, 2026, published Feb 20, 2026
  • Rooming house overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Zoning setbacks: loaded Oct 14, 2026, published Feb 20, 2026

Contains information licensed under the Open Government Licence – Toronto. TRCA regulation limit © TRCA.

Screening tool based on City of Toronto and TRCA open data. Not a zoning review or legal opinion. Site-specific exceptions, amendments not yet in the open data, minor variances and other by-laws can change the answer. Confirm with a Preliminary Project Review or Zoning Certificate from Toronto Building before buying or designing.

Flag an error

What is not right?

The problem

The records come from the City's open data; we check each flag against them. Your email is used only to answer this.