HousePrecheckCheck an address

1951 Yonge StToronto · zoning, lot size and permit records

18.7 × 41.8 m747 m²on Yonge Stcorner, also on Millwood Rd

Not a home

Land without a building

The City's 3D model of buildings shows nothing standing on this parcel: vacant land, a parking lot or a yard. It is not a home for sale, so the house checks and the pre-offer report do not apply.

Looking at a house nearby? What this means for you

  • Empty land or parkingWhat gets built here matters most to the street: read the applications on it and around it below.
  • Permits or applications open on this parcelRecent records on this lot: 26 221868 (Proposal for alternative solution addressing the interconnected floor for the escalator..., 2026); 26 152942 (Shoring and excavation for remediation purposes, 2026); 26 259382 (Deferred Fees from folder 25 259382 (RSN-5747547) ZoningProcess RSN 78674544, 2026); and 4 more. Larger work can mean noise and trucks next door; read what each one is for.
  • 20 development applications open within 300 m, up to 48 storeysNew buildings may go up around here in the next years. More change nearby than at 100% of Toronto houses.
N10 m
18.7 m frontage41.8 m deep

Before you offer

From the City's records on this lot. Each item says what it means for a purchase and how to confirm it.

  • 1 by-law investigation closed in the last two years

    Good to know

    Closed files (Property Standards): 26 211149 PRS 00 IR (Property Standards, 2026).

    What it means. Someone raised an issue here and the City closed the file. Ask the seller what it was about.

    City of Toronto, Toronto Building orders and Municipal Licensing and Standards investigations
  • Work or applications in progress

    Good to know

    Recent records on this lot: 26 221868 (Proposal for alternative solution addressing the interconnected floor for the escalator..., 2026); 26 152942 (Shoring and excavation for remediation purposes, 2026); 26 259382 (Deferred Fees from folder 25 259382 (RSN-5747547) ZoningProcess RSN 78674544, 2026); and 4 more.

    What it means. The owner has planned or started work. Ask what it covers, whether it will be finished before closing, and who pays for what is left.

    How to confirm. Application details and decisions are in the City's Application Information Centre. A Property Information Report from Toronto Building lists open permits, inspections and outstanding orders ($214.79, about five business days). Details

    City of Toronto, Building Permits (active, cleared since 2017, cleared 2000-2016); City of Toronto, Committee of Adjustment applications (2001 onwards); City of Toronto, Development Applications
  • 1 Committee of Adjustment file on this lot

    Good to know

    1 approved. A0199/25TEY (To alter the development standards (as approved under Site Specific Zoning By-Law 907-2..., 2025).

    What it means. Approved variances and consents stay with the property, including any conditions in the decision. They allow what was approved, not more.

    How to confirm. Decisions are in the Application Information Centre; older files are available from the Committee of Adjustment office. Details

    City of Toronto, Committee of Adjustment applications (2001 onwards)
  • 20 development applications open within 300 m

    Good to know

    20 rezoning, site plan, subdivision or condominium applications within 300 m, submitted in the last 10 years, are not closed yet, including buildings of up to 48 storeys. They are listed under Around this lot.

    What it means. New buildings nearby can change views, sunlight, traffic and construction noise for years.

    How to confirm. Each application, its drawings and its status are in the Application Information Centre. Details

    City of Toronto, Development Applications

Not in these records

  • Flooding history. Past basement flooding and insurance claims on this house are not published. Ask the seller directly and ask your insurer before you firm up the offer.
  • Ownership, mortgages and easements. Title is not open data. Your lawyer searches title after the offer; ask for the survey and any easements before.

History of this lot

26 records on file: more than at 100% of Toronto houses (median 0).

  • Building permit26 221868Deficiency Notice Issued

    Proposal for alternative solution addressing the interconnected floor for the escalator (3.2.8.2.(5)) and 3.2.8.2.(6)).

    Aug 18, 2026 · 1951 YONGE ST
  • By-law investigation26 211149 PRS 00 IRClosed

    Property Standards

    Jul 29, 2026 · 1951 YONGE ST
  • Zoning review26 144461 PRZClosed
    Jun 3, 2026 · 1951 YONGE ST
  • Building permit26 152942Permit Issued

    Shoring and excavation for remediation purposes

    May 21, 2026 · 1951 YONGE ST
  • Development application26 144461 STE 12 OZCouncil Approved

    The current proposal seeks to add an additional 10 storeys to each tower resulting in a total height of 48 and 55 storeys (165.3 metres and 186.3 metres to the top of the mechanical penthouses), inclusive of the previously approved 5 and 7-storey base building. The proposal includes a total GFA of 78,725 square metres, including 5,783 square metres of retail GFA, and a density of 13.71 FSI.

    Apr 15, 2026 · 1951 YONGE ST · City file
  • Building permit26 259382Open

    Deferred Fees from folder 25 259382 (RSN-5747547) ZoningProcess RSN 78674544

    Jan 26, 2026 · 1951 YONGE ST
  • Building permit26 257691Open

    Deferred Fees from folder 25 257691 (RSN-5745500) ZoningProcess RSN 78674701

    Jan 26, 2026 · 1951 YONGE ST
  • Building permit25 259382Cancelled

    Drain - TOWER B - Proposed 46 Storey rental residential building with 461 residential units and retail units

    Nov 27, 2025 · 1951 YONGE ST
Show 18 older records
  • Building permit25 257691Response Receivednew building

    TOWER A (with podium and underground garage): Proposed 39 Storey building with 357 rental residential units and retail units above and below grade. 3 levels of below grade parking

    Nov 24, 2025 · 1951 YONGE ST
  • Minor varianceA0199/25TEYApproved

    To alter the development standards (as approved under Site Specific Zoning By-Law 907-2024(OLT)) for mixed-use buildings, by reducing the minimum number of parking spaces required.

    May 7, 2025 · 1951 YONGE ST
  • Zoning review23 182907 PSPClosed
    Aug 18, 2023 · 1951 YONGE ST
  • Development application23 182907 STE 12 SANOAC Issued

    Proposed 38 and 45 storey towers, plus MPH, totaling 59,998.22 sq.m. residential GFA and 5,873.08 sq.m. non-residential for an FSI of 11.47. 818 units are proposed and 336 parking spaces.

    Aug 1, 2023 · 1951 YONGE ST · City file
  • Development application23 182894 STE 12 OZClosed

    Application to Lift the 'H' from Zoning By-law

    Aug 1, 2023 · 17 MILLWOOD RD · City file
  • Development application20 191099 STE 12 OZClosed

    Proposal for two mixed-use buildings at 30 and 45 storeys connected by an 8 storey base building. Proposal will contain 821 residential units and 2,569 square metres of grade-related commercial space. Proposed are 442 vehicle parking spaces (92 visitor/commercial & 350 residential) and 1,008 bicycle parking spaces (987 residential short/long term & 21 commercial short/long term) to be located within a below grade parking garage.

    Sep 8, 2020 · 17 MILLWOOD RD · City file
  • Zoning review17 136251 POZClosed
    Apr 10, 2017 · 1951 YONGE ST
  • Development application17 136251 STE 22 OZClosed

    Application Withdrawn - Official Plan Amendment and Zoning By-law Amendment to permit two towers, 25 and 34 storeys in height, containing 450 residential units and approximately 8,232 square metres of commercial space on the ground, 2nd and 3rd floors. An on-site park at the northeast corner of the site is also proposed.

    Mar 29, 2017 · 1951 YONGE ST · City file
  • Zoning review17 109919 ZPRClosed
    Jan 27, 2017 · 1951 YONGE ST
  • Building permit16 194596Closeddemolition

    Proposal to demolish the existing 1 storey retail store (LCBO). No new building proposed at this time.

    Sep 7, 2016 · 1951 YONGE ST
  • Building permit10 238464Closed - Dormant

    HVAC - Interior alterations to create 2 seperate commercial tenant spaces on the ground floor and fascade alterations to add additonal entrances.

    Oct 26, 2010 · 1951 YONGE ST
  • Zoning review97 025883 LTOClosed
    Jan 31, 1997 · 1951 YONGE ST
  • Zoning review96 025823 LTOClosed
    Dec 13, 1996 · 1951 YONGE ST
  • Zoning review95 024585 LTOClosed
    Feb 1, 1995 · 1951 YONGE ST
  • Zoning review93 025247 LTOClosed
    Jun 17, 1993 · 1951 YONGE ST
  • Zoning review93 025147 LTOClosed
    May 27, 1993 · 1951 YONGE ST
  • Zoning review92 025319 LTOClosed
    Mar 20, 1992 · 1951 YONGE ST
  • Zoning review91 026884 LTOClosed
    Sep 10, 1991 · 1951 YONGE ST

Check before you build

  • Zoning not in By-law 569-2013

    Needs a closer look

    This lot is not covered by the citywide zoning by-law's map. It is probably still governed by a former municipal by-law, which this tool does not read yet.

    Zoning By-law 569-2013

Lot facts

Area
747 m²
Frontage
18.7 m
Depth
41.8 m
Street
Yonge St
Corner lot
Yes, also on Millwood Rd41.8 m along it
Public lane
None
Max height
—
Max lot coverage
—
  • 2 City trees in front of this lot. The City's street tree inventory lists 2 trees at this address: maple, freeman autumn blaze (10 cm), maple, freeman autumn blaze (10 cm). Diameter is the trunk at breast height. Source

Around this lot

Minor variances approved
92%22 of 24 decisions
Garden suite permits
0
Laneway suite permits
0
Multiplex permits
6
Development applications
37

Within 300 m, last 10 years. 6 suite and multiplex permits: more than at 64% of Toronto houses (median 3). 24 variance decisions: more than at 55% of Toronto houses (median 19).

Recent variance decisions in the same zone

  • Minor varianceApproved

    To alter the existing two-storey detached dwelling (houseplex) by constructing a front basement walkout, and a front yard parking pad. Also, to convert the existing front integral garage into habitable space (one residential dwelling unit). There will be a total of four residential dwelling units on this lot (one unit within the basement level, two units on the ground level, and one unit on the second level).

    105 BELSIZE DR · Jul 8, 2026 · 417 m away
  • Minor varianceApproved

    To construct a new three-storey detached dwelling with a rear third storey balcony Also, to construct a front widened driveway and a new one-storey ancillary building (cabana) in the rear yard.

    71 LASCELLES BLVD · Jun 3, 2026 · 476 m away
  • Minor varianceApproved

    To construct a new three-storey detached dwelling with a front covered porch with stairs, a front integral garage, a rear ground floor porch, and a rear third-storey balcony. Also, to construct a one-storey ancillary building (cabana) in the rear yard of the property.

    88 COLIN AVE · Mar 11, 2026 · 450 m away
  • Minor varianceRefused

    To construct a new undersized front yard parking pad, abutting Carey Road. The existing three-storey detached dwelling on the lot will be maintained and unaltered.

    26 CAREY RD · Feb 4, 2026 · 363 m away
  • Minor varianceApproved

    To alter the existing two-storey semi-detached dwelling by constructing a rear (south) two-storey addition with a deck and stairs, and a side (west) entrance (abutting Duplex Avenue). The existing rear deck will be demolished.

    53 MANOR RD W · Jan 21, 2026 · 387 m away

Latest activity nearby

  • Zoning review

    Not Started

    3 GLEBE RD E · Nov 24, 2026 · 209 m away
  • Zoning review

    Not Started

    21 IMPERIAL ST · Nov 24, 2026 · 92 m away
  • Zoning review

    Not Started

    1991 YONGE ST · Nov 23, 2026 · 148 m away
  • Zoning review

    Application On Hold

    1849 YONGE ST · Nov 23, 2026 · 257 m away
  • Building permit

    Proposal to construct an one-storey rear yard addition and new deck.See also 26-255451 ZAP 00 ZR

    30 CHAPLIN CRES · Nov 20, 2026 · 213 m away
  • Zoning review

    Not Started

    2039 YONGE ST · Nov 6, 2026 · 287 m away
  • Zoning review

    Closed

    1920 YONGE ST · Oct 29, 2026 · 89 m away
  • Building permit

    INTERIOR ALTERATIONS - DEMISING PARTITION - UNIT 906

    1867 YONGE ST · Oct 29, 2026 · 225 m away
  • Building permit

    Proposal for interior alterations to existing commercial suite into a veterinary clinic.

    2008 YONGE ST · Oct 28, 2026 · 173 m away
  • Building permitdemolition

    Proposed demolition of the existing 5-storey commercial building.

    25 IMPERIAL ST · Oct 23, 2026 · 106 m away

Neighbourhood: South Eglinton-Davisville

About the area around the lot, not the lot itself.

Nearest station
Davisville Station3 min walk
Nearest TTC stop
Yonge St at Davisville Ave North Side1 min walk
Nearest cycling route
Yonge StCycle Track, 2 min walk
Nearest traffic count
15,943 vehicles in 14 hYonge St / Millwood Rd, 40 m away, Sep 24, 2024
Serious collisions within 500 m
62021–2026, killed or seriously injured: 3 fatal, 3 with pedestrians, 0 with cyclists
Parks
Fiona Nelson Parkette2 min walk
Oriole Park - Toronto4 min walk
Kay Gardner Beltline Park6 min walk

Schools within 1 km

  • DAVISVILLE & SPECTRUM SCHOOL English Public 2 min walk
  • THE STUDY ACADEMY Private 4 min walk
  • THE STUDY ACADEMY SCHOOL Private 4 min walk
  • MANOR MONTESSORI - DE SAVERY SITE Private 11 min walk
  • TORONTO PREP SCHOOL Private 13 min walk
  • GREENWOOD COLLEGE SCHOOL Private 13 min walk

Being near a school does not mean the lot is in its catchment; check with the board.

2021 Census

FigureSouth Eglinton-DavisvilleMedian neighbourhood
Median household income (2020)$80,000$84,500
Households that own their home30%54%
Population (2021)22,73516,813
Homes built in 1960 or before11%29%
Homes needing major repairs3%7%

Statistics Canada 2021 Census, 25% sample, by City of Toronto neighbourhood.

Police-reported crime, 2025

Per 100,000 peopleSouth Eglinton-DavisvilleCity median
Assault436636.3
Robbery24.269.5
Auto theft58.8192.6
Theft over $5,00020.846.1
Break and enter128172.8
Theft from vehicles100.3188.1

Neighbourhood totals from the Toronto Police Service. Rates are per resident, so areas with many visitors and few residents read high.

Something here not right?

Sources

  • Building permits on this lot since 2000: Permits issued or applied for since about 2000, with status.
  • Committee of Adjustment files since 2001: Minor variances and consents (lot splits) on this lot and nearby, with decisions.
  • Development applications: Rezoning, site plan, subdivision and condominium applications.
  • Preliminary zoning reviews: Zoning reviews requested before a permit or variance application.
  • Zoning and overlays: Zoning By-law 569-2013 zone, height, coverage, policy area, parking, rooming house, priority retail street and downtown setback overlays.
  • Lot boundary, street and lane: Lot polygon, its addresses, the street it fronts, corner and public lane contact, with frontage and depth measured from the boundary; City of Toronto land in City use, which is not a home.
  • House and yards: Footprint and roof height of the house and other buildings, and the yard behind the house, from the City's 3D Massing (updated yearly, illustrative).
  • City trees in front of the lot: City-owned trees on the street allowance at this address, with species and trunk diameter. Private trees on the lot are not in open data.
  • Heritage: Heritage Register (listed and designated properties), Official Plan Amendment 720 properties and properties removed from the Register under the 2022 two-year limit.
  • TRCA regulated area: Valleys, floodplains, shorelines and wetlands regulated by the Toronto and Region Conservation Authority.
  • Ravines and natural features: Ravine and Natural Feature Protection area (Chapter 658, map last published 2019), Natural Heritage System and Environmentally Significant Areas.
  • Official Plan policies: Site and Area Specific Policies, Secondary Plans and Major Transit Station Areas covering the lot.
  • Rooming houses, short-term rentals and rental buildings: Multi-tenant house licences, short-term rental registrations and RentSafeTO evaluations at this address.
  • Neighbourhood context: Neighbourhood, 2021 Census figures, police-reported crime rates, schools, parks, TTC stops, cycling routes, serious collisions and traffic counts nearby. Area context only, not a finding about the lot.
  • Orders and by-law investigations: Outstanding Toronto Building orders, and by-law investigations open now or closed in the last two years. Fire and Public Health orders and older closed files are not published.
  • Address points: loaded Nov 22, 2026, published Nov 20, 2026
  • Toronto Building orders: loaded Nov 28, 2026, published Nov 27, 2026
  • Neighbourhood Profiles, 2021 Census: loaded Oct 14, 2026, published Oct 6, 2023
  • Street centrelines: loaded Nov 22, 2026, published Nov 20, 2026
  • City-owned land: loaded Nov 22, 2026, published Nov 16, 2026
  • Committee of Adjustment open applications: loaded Nov 28, 2026, published Nov 27, 2026
  • Committee of Adjustment decisions: loaded Nov 28, 2026, published Nov 27, 2026
  • Committee of Adjustment decisions 2001-2016: loaded Oct 14, 2026, published Feb 20, 2026
  • Collisions with people killed or seriously injured (Toronto Police Service): loaded Nov 22, 2026, published Nov 21, 2026
  • Neighbourhood crime rates (Toronto Police Service): loaded Oct 14, 2026, published Feb 20, 2026
  • Cycling network: loaded Nov 22, 2026, published Nov 16, 2026
  • Development applications: loaded Nov 28, 2026, published Nov 28, 2026
  • Environmentally Significant Areas: loaded Oct 14, 2026, published Mar 16, 2026
  • Green spaces: loaded Nov 15, 2026, published Nov 10, 2026
  • Heritage register: loaded Oct 14, 2026, published Sep 1, 2026
  • Former heritage listings: loaded Oct 14, 2026, published Jul 3, 2025
  • Official Plan Amendment 720 heritage list: loaded Oct 14, 2026, published Sep 1, 2026
  • 3D Massing building footprints: loaded Oct 14, 2026, published Dec 2, 2025
  • By-law investigation addresses: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigation deficiencies: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigations: loaded Nov 28, 2026, published Nov 27, 2026
  • Major Transit Station Areas: loaded Oct 14, 2026, published Feb 3, 2026
  • Natural Heritage System: loaded Oct 14, 2026, published Mar 16, 2026
  • Neighbourhoods: loaded Oct 14, 2026, published Feb 20, 2026
  • Property boundaries: loaded Nov 27, 2026, published Nov 27, 2026
  • Active building permits: loaded Nov 28, 2026, published Nov 27, 2026
  • Cleared building permits: loaded Nov 28, 2026, published Nov 27, 2026
  • Cleared building permits 2000-2016: loaded Oct 14, 2026, published Jul 8, 2025
  • Preliminary zoning reviews: loaded Nov 28, 2026, published Nov 27, 2026
  • Ravine and natural feature protection: loaded Oct 14, 2026, published Jul 23, 2019
  • RentSafeTO evaluations: loaded Nov 28, 2026, published Nov 27, 2026
  • Multi-tenant house licences: loaded Nov 28, 2026, published Nov 27, 2026
  • Site and Area Specific Policies: loaded Oct 14, 2026, published Mar 16, 2026
  • School locations: loaded Oct 14, 2026, published May 27, 2026
  • Secondary Plans: loaded Oct 14, 2026, published Mar 16, 2026
  • Street trees: loaded Oct 14, 2026, published Jun 4, 2026
  • Short-term rental registrations: loaded Nov 28, 2026, published Nov 27, 2026
  • Traffic counts at intersections: loaded Nov 22, 2026, published Nov 21, 2026
  • TRCA regulation limit: loaded Oct 14, 2026, published Apr 29, 2026
  • TTC stops (GTFS): loaded Nov 8, 2026, published Nov 5, 2026
  • Zoning by-law: loaded Oct 14, 2026, published Feb 20, 2026
  • Lot coverage overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Height overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Parking zone overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Policy area overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Priority retail streets: loaded Oct 14, 2026, published Feb 20, 2026
  • Rooming house overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Zoning setbacks: loaded Oct 14, 2026, published Feb 20, 2026

Contains information licensed under the Open Government Licence – Toronto. TRCA regulation limit © TRCA.

Screening tool based on City of Toronto and TRCA open data. Not a zoning review or legal opinion. Site-specific exceptions, amendments not yet in the open data, minor variances and other by-laws can change the answer. Confirm with a Preliminary Project Review or Zoning Certificate from Toronto Building before buying or designing.

Flag an error

What is not right?

The problem

The records come from the City's open data; we check each flag against them. Your email is used only to answer this.