HousePrecheckCheck an address

192 Berkeley StMoss Park, Toronto · City records before you offer

Residential · R (d1.0) (x984)5.0 × 40.4 m198 m²on Berkeley St

1 thing to check before you offer, including building permit open since 2011
N10 m
5.0 m frontage40.4 m deep

Everything here comes from public records: City of Toronto open data, TRCA and Statistics Canada, 15 sets in all. Each item leads to the record it comes from. Our sources

This house at a glance

Each score from 0 to 10: 0 needs attention, 10 all clear. Build potential is how much more you could add.

About 192 Berkeley St

192 Berkeley St is on a 5 m by 40.4 m lot on Berkeley St in Moss Park. The zoning is R. A site-specific exception, 900.2.10(984), changes some of the usual rules for this address.

The City has 7 records on this lot since 2007. That is more than at 97% of Toronto houses. In 2011, a building permit was filed: "Revision: proposed alterations to roof deck guards.proposed 3rd storey rear, and 2 storey rear with roof deck addition to existing 3 storey row house. see c of…". Status: revision issued. In 2009, a building permit was filed: "New detached rear garage". Status: closed - dormant. In 2007, a Committee of Adjustment application was filed: "To structurally alter the existing 2½ storey row house by constructing a rear third floor addition and a rear two-storey addition". Status: closed. An open permit means the City has not closed the file. Ask the seller whether the work was finished and passed its final inspection.

Within 300 m, 6 development applications are open (the tallest up to 40 storeys). The nearest TTC stop is Parliament St at Shuter St, a 2-minute walk.

Summary

What the City's records show on this house

  • Building permit open since 2011ModerateFree check
  • Site-specific exception 900.2.10(984)Moderate
  • No permit for a second unit on fileLowFree check
  • 6 development applications open within 300 mLowFree check
  • 1 City tree in front of this lotLowFree check
  • Downtown Plan Secondary PlanLow
  • 1 Committee of Adjustment file on this lotLowFree check

Left unchecked, any of these can mean unexpected costs, trouble after closing, or plans you can't carry out. Found before you offer, they give you room to negotiate. The full report explains what each one means for this house and what to do next.

What the rules allow here: Multiplex up to 6 units · Garden suite

Unlock the full report

15 sets of public records, already checked for you. Searching each one yourself and working out what it means for you takes time. We have done that work: what matters about this house and lot, in plain English, in a few minutes.

What to find out first

1 thing to check before you offer.

What to find out before an offer, the steps to take, what each costs and how long it takesUnlock

Check

Open City files

How much in the City's records needs answers before an offer

  • Building permit open since 2011
  • No open orders or by-law investigations
  • No work or applications in progress

What this part means for this house, in plain EnglishUnlock

  1. Building permit open since 2011

    ModerateCheck before you offer

    What the record shows, what it means for you and what to doUnlock

  2. No permit for a second unit on file

    LowCheck if it applies

    What the record shows, what it means for you and what to doUnlock

  3. 1 Committee of Adjustment file on this lot

    LowFor later, once you own it

    What the record shows, what it means for you and what to doUnlock

City files on this lot

7 records on file, more than at 97% of Toronto houses (median 0 records).

DateRecordAs the City filed itIn plain wordsStatus
2025-04-30Zoning review
25 151855 ZAP
No description on fileApplication On Hold
2018-10-01Zoning review
18 234346 ZZC
No description on fileClosed
2018-08-14Zoning review
18 208903 ZZC
No description on fileCancelled
2011-11-07Building permit
07 286252
Revision: Proposed alterations to roof deck guards.Proposed 3rd storey rear, and 2 storey rear with roof deck addition to existing 3 storey Row House. See C of A and Final & Binding enclosed. PAL. Applicant will not proceed with garage as shown on DWG's. Applicant has submitted Urban Forestry 'Letter of Clearance'Revision Issued
2009-04-17Building permit
09 126121
New detached rear garage.Closed - Dormant
2007-08-08Minor variance
A0421/07TEY
To structurally alter the existing 2½ storey row house by constructing a rear third floor addition and a rear two-storey addition.Approved
2007-05-23Zoning review
07 220516 ZAL
No description on fileClosed
Clear

Restrictions

How much heritage, nature and site-specific rules limit changes to the house

  • Site-specific exception 900.2.10(984)
  • No heritage listing or designation

What this part means for this house, in plain EnglishUnlock

  1. Site-specific exception 900.2.10(984)

    ModerateCheck if it applies

    What the record shows, what it means for you and what to doUnlock

  2. 1 City tree in front of this lot

    LowFor later, once you own it

    What the record shows, what it means for you and what to doUnlock

  3. Downtown Plan Secondary Plan

    LowFor later, once you own it

    What the record shows, what it means for you and what to doUnlock

If you want to change or build

What the site-specific rules mean for an addition, a garage or a rebuild.

Site-specific exception 900.2.10(984)

What the exception changes for this address, rule by ruleUnlock

Not on this lot

Flood and erosion rules

How much of the lot lies in the areas TRCA regulates for flooding and erosion

  • Outside the areas TRCA regulates

From TRCA's regulated areas only. Basement flooding, sewer back-up and the TRCA flood plain are not in this score yet; ask the seller and your insurer about water in the basement.

What this part means for this house, in plain EnglishUnlock

Some

Build potential

How much more the rules allow on this lot, beyond what is on record

  • Multiplex up to 6 units: likely fits
  • Garden suite: likely fits
  • Secondary suite: likely fits

What this part means for this house, in plain EnglishUnlock

  1. Multiplex up to 6 units

    LowFor later, once you own it

    What the record shows, what it means for you and what to doUnlock

  2. Garden suite

    LowFor later, once you own it

    What the record shows, what it means for you and what to doUnlock

The lot and what the rules allow

N10 m
5.0 m frontage40.4 m deepon Berkeley St
Zone
R (d1.0) (x984)
Height limit
13 m
Corner lot
No
Public lane
None
New house permit
None since 2000
House footprint
41 m²
Back yard
23.1 m
Buildings on the lot
2

House and yards from the City's 3D Massing; a survey gives exact figures.

What you can build

Why, measured on this lot, and the most you could buildUnlock

Busy

Building nearby

How much neighbours are building and applying to change within 300 m

  • 6 development applications open within 300 m, up to 40 storeys
  • In the Moss Park station area
  • 5 suite and multiplex permits within 300 m in 10 years

What this part means for this house, in plain EnglishUnlock

  1. 6 development applications open within 300 m

    LowCheck if it applies

    What the record shows, what it means for you and what to doUnlock

What the City allowed next door

Within 500 m, last 10 years: a guide if you plan to build or apply for something similar.

What neighbours have built and changed around you, and how the City decidedUnlock

Crime above median

Area safety

Police-reported crime in the neighbourhood against the Toronto median

  • Lower than the Toronto median in 3 of 8 categories
  • Assault: 3.5 times the Toronto median
  • Robbery: 2.4 times the Toronto median
  • Break and enter: 2.0 times the Toronto median

Neighbourhood rates per 100,000 people from the Toronto Police Service, not this street.

What this part means for this house, in plain EnglishUnlock

Moss Park neighbourhood

About the area, not this house.

2021 Census, against the median Toronto neighbourhood

Median household income (2020)$65,000median $84,500
Households that own their home35%median 54%
Population (2021)21,490median 16,813
Homes built in 1960 or before17%median 29%
Homes needing major repairs8%median 7%

Getting around and schools

  • Queen StationNearest station18 min walk
  • Parliament St at Shuter StNearest TTC stop2 min walk
  • Shuter StNearest cycling route1 min walk
  • Liberty Prep SchoolSchool4 min walk
  • St Paul Catholic Elementary SchoolSchool7 min walk
  • Lord Dufferin Jr & Sr Public SchoolSchool7 min walk
  • Ecole Elementaire Gabrielle RoySchool7 min walk

Police-reported crime, 2025, per 100,000 people

  • Assaultcity median 636.32226.8
  • Robberycity median 69.5166.6
  • Homicidecity median 5.33.4
  • Shootingscity median 10.53.4
  • Auto theftcity median 192.681.6
  • Theft over $5,000city median 46.164.6
  • Break and entercity median 172.8350.2
  • Theft from vehiclescity median 188.1275.4

More about Moss Park

Ready emails

Copy and send as they are.

2 questions for the seller and your lawyer, written outUnlock

What we checked, and what the City's records don't cover

We checked 48 sets of City of Toronto, TRCA and Statistics Canada open data for this address, last updated Nov 27, 2026. Our records don't cover flooding history, ownership and mortgages, or the condition of the house: ask the seller and your insurer about water in the basement, your lawyer about title, and book a home inspection.

See every source and when we loaded it · Pre-offer checklist

Something here not right?

Screening tool based on City of Toronto and TRCA open data. Not a zoning review or legal opinion. Site-specific exceptions, amendments not yet in the open data, minor variances and other by-laws can change the answer. Confirm with a Preliminary Project Review or Zoning Certificate from Toronto Building before buying or designing.

Scores calibrated on Toronto house lots on 2026-10-19; prices and sources checked on 2026-10-06. Contains information licensed under the Open Government Licence – Toronto. TRCA regulation limits © Toronto and Region Conservation Authority.

Full pre-offer report · 192 Berkeley St

1 thing to check at 192 Berkeley St before you offer

  • Building permit open since 2011Moderate
  • Site-specific exception 900.2.10(984)Moderate
  • No permit for a second unit on fileLow
  • 6 development applications open within 300 mLow
  • and 3 more

The report explains what each one can cost you on this house and what to ask the seller or the City before you offer.

$29 CAD one time · opens right away

See a sample report

Full refund within 30 days if the report left out or misstated a City record on the lot. Refund policy

Also in the report

  • A PDF to forward to your agent and lawyer
  • What you can build on this lot, measured on it
  • Every line linked to the City record it comes from
  • 15 sets of public records, already searched and read for you
  • A clear list of the 7 steps to take before you offer, so nothing slips
  • What each of the 7 findings can cost you or stop you doing, in plain English
  • A two-minute summary of this house, and what to find out first before you offer
  • What the City allowed your neighbours, a guide if you plan to build or apply for something similar
  • We watch this address for 90 days. If anything changes in the City's records, we email you the same day
  • A short summary of each part: City files, restrictions, flood and erosion, build potential, building nearby, area safety

By paying you agree to the terms of use and the refund policy. Payment by Stripe. The report opens right after payment, and we email you a link to it; your account is made from the email you pay with. A screening of public records, not a legal opinion or a home inspection.

Flag an error

What is not right?

The problem

The records come from the City's open data; we check each flag against them. Your email is used only to answer this.