Before you offer
From the City's records on this lot. Each item says what it means for a purchase and how to confirm it.
Cultural Heritage Evaluation Report required
Needs a closer lookThis property is listed under Official Plan Amendment 720: a heritage evaluation is needed before redevelopment.
What it means. Plans to tear down or rebuild will need a heritage evaluation first.
How to confirm. Heritage Planning at the City confirms the status. Details
Official Plan Amendment 720Work or applications in progress
Good to knowRecent records on this lot: 25 125834 STE 12 SA (Site Plan approval application for a 40-storey tower with an 8-storey podium and three-..., 2025); 22 176960 STE 12 OZ (Rezoning for proposed 40-storey tower with an 8-storey podium and three-levels of under..., 2022).
What it means. The owner has planned or started work. Ask what it covers, whether it will be finished before closing, and who pays for what is left.
How to confirm. Application details and decisions are in the City's Application Information Centre. A Property Information Report from Toronto Building lists open permits, inspections and outstanding orders ($214.79, about five business days). Details
City of Toronto, Building Permits (active, cleared since 2017, cleared 2000-2016); City of Toronto, Committee of Adjustment applications (2001 onwards); City of Toronto, Development Applications27 development applications open within 300 m
Good to know27 rezoning, site plan, subdivision or condominium applications within 300 m, submitted in the last 10 years, are not closed yet, including buildings of up to 70 storeys. They are listed under Around this lot.
What it means. New buildings nearby can change views, sunlight, traffic and construction noise for years.
How to confirm. Each application, its drawings and its status are in the Application Information Centre. Details
City of Toronto, Development Applications
Not in these records
- Flooding history. Past basement flooding and insurance claims on this house are not published. Ask the seller directly and ask your insurer before you firm up the offer.
- Ownership, mortgages and easements. Title is not open data. Your lawyer searches title after the offer; ask for the survey and any easements before.
History of this lot
13 records on file: more than at 100% of Toronto houses (median 0).
- By-law investigation26 153037 GRA 00 IRNotice Issued
Graffiti
Apr 30, 2026 · 191 EGLINTON AVE E - Development application25 125834 STE 12 SAUnder Review
Site Plan approval application for a 40-storey tower with an 8-storey podium and three-levels of underground parking. The proposal incorporates residential, retail, and office uses, and will replace the existing commercial/retail spaces. The building includes 479 units, 164 vehicular parking spaces, and 504 bicycle parking spaces. The application is related to rezoning appeal, 22 176960 STE 12 OZ. The appeal has been settled and now includes a revised proposal for a 52-storey mixed use building.
Mar 6, 2025 · 191 EGLINTON AVE E · City file - Zoning review22 176958 PSPClosedAug 15, 2022 · 191 EGLINTON AVE E
- Zoning review22 176960 PRZClosedAug 15, 2022 · 191 EGLINTON AVE E
- Development application22 176960 STE 12 OZAppeal Received
Rezoning for proposed 40-storey tower with an 8-storey podium and three-levels of underground parking. The proposal incorporates residential, retail, and office uses, and will replace the existing commercial/retail spaces. The building includes 479 units, 164 vehicular parking spaces, and 504 bicycle parking spaces.
Jul 14, 2022 · 191 EGLINTON AVE E · City file - Zoning review18 206447 LTOClosedAug 9, 2018 · 191 EGLINTON AVE E
- Building permit16 253330Closed
Proposal to install backflow prevention device.
Dec 8, 2016 · 191 EGLINTON AVE E - Zoning review10 305949 LTOClosedNov 30, 2010 · 191 EGLINTON AVE E
Show 5 older records
- Zoning review08 224411 LTOClosedNov 25, 2008 · 191 EGLINTON AVE E
- Zoning review05 136713 ZSVClosedMay 27, 2005 · 191 EGLINTON AVE E
- Building permit04 135512Closed
Plumbing -Install 2 new fixtures on 2nd and third floor. Interior Alterations a 3 storey building for Credit Union bank and re-cladding front wall of building. - Multiple Projects
Jun 2, 2004 · 191 EGLINTON AVE E - Building permit01 134123Closed
install fixtures on 1st floor- 4 w.b., 3 cuspidors. see bp#01-128415
May 7, 2001 · 191 EGLINTON AVE E - Building permit01 128415Closed
Make interior alterations on first floor for dentist's office
Apr 19, 2001 · 191 EGLINTON AVE E
Check before you build
Site-specific exception 900.11.10(2497)
Needs a closer look3 site-specific rules and 3 older by-laws that still prevail apply to this lot. They can override the standard rules on this page.
Zoning By-law 569-2013, Chapter 900
These parts of the exception apply to this lot's address.
- Rule A
In a Commercial Residential zone, where the maximum lawfully permitted height exceeds the width of the right-of-way of the street it abuts then: (i) the angular plane requirements of regulations 40.10.40.70(2)(E) and 40.10.40.70(2)(G) do not apply; (ii) the rear yard setback requirements of regulation 40.10.40.70(2)(B) do not apply; and (iii) if the rear main wall of a building does not contain windows or openings: (a) the building must be set back at least 3.0 metres from any rear lot line that abuts a lot in the Residential Zone category; and (b) no building setback is required from any other zone category. Prevailing By-laws and Prevailing Sections: (A) Section 12(2) 118 of former City of Toronto By-law 438-86
- Rule B
Section 12(2) 119 of former City of Toronto By-law 438-86
- Rule C
Section 12(2) 270(a) of former City of Toronto By-law 438-86
- Older by-law A
In a Commercial Residential zone, where the maximum lawfully permitted height exceeds the width of the right-of-way of the street it abuts then: (i) the angular plane requirements of regulations 40.10.40.70(2)(E) and 40.10.40.70(2)(G) do not apply; (ii) the rear yard setback requirements of regulation 40.10.40.70(2)(B) do not apply; and (iii) if the rear main wall of a building does not contain windows or openings: (a) the building must be set back at least 3.0 metres from any rear lot line that abuts a lot in the Residential Zone category; and (b) no building setback is required from any other zone category. Prevailing By-laws and Prevailing Sections: (A) Section 12(2) 118 of former City of Toronto By-law 438-86
- Older by-law B
Section 12(2) 119 of former City of Toronto By-law 438-86
- Older by-law C
Section 12(2) 270(a) of former City of Toronto By-law 438-86
4 parts for other addresses
- D On 123 Eglinton Ave. E., City of Toronto by-law 881-98
- E On 130 Eglinton Ave. E., former City of Toronto by-law 882-78.
- D On 123 Eglinton Ave. E., City of Toronto by-law 881-98
- E On 130 Eglinton Ave. E., former City of Toronto by-law 882-78.
Lot facts
- Area
- 1,146 m²
- Frontage
- 24.9 m
- Depth
- 47 m
- Street
- Eglinton Ave E
- Corner lot
- Yes, also on Brownlow Ave47 m along it
- Public lane
- None
- House footprint
- 676 m²roof up to 19.1 m
- Back yard
- 18.4 mhouse to rear lot line
- Side yards
- 0 m and 0 mhouse to side lot lines; 0 is a shared wall
- Buildings on the lot
- 2house, garage, sheds
- Max height
- 48 m
- Max lot coverage
- —
House and yards are measured from the City's 3D Massing footprints, which are for illustration; a survey gives the exact figures.
- Major Transit Station Area: Mount Pleasant. The lot is inside the Mount Pleasant Major Transit Station Area approved by the Province (Site and Area Specific Policy 680). Source
- Yonge-Eglinton Secondary Plan. A Secondary Plan sets more detailed land use, height and density policies for this area. Source
- Zone CR 5.0 (c3.0; r3.0) SS2 (x2497) (Commercial Residential). Chapter 40, section 40.10 of the by-law. Source
- 2 City trees in front of this lot. The City's street tree inventory lists 2 trees at this address: linden (8 cm), linden (8 cm). Diameter is the trunk at breast height. Source
Around this lot
- Minor variances approved
- 92%11 of 12 decisions
- Garden suite permits
- 1
- Laneway suite permits
- 0
- Multiplex permits
- 0
- Development applications
- 44
Within 300 m, last 10 years. 1 suite and multiplex permits: no more than at most Toronto houses (median 3). 12 variance decisions: no more than at most Toronto houses (median 19).
Recent variance decisions in the same zone
- Minor varianceRefused
To permit the installation of a new in-ground pool and fence enclosure, in the rear yard of the subject property.
311 HILLSDALE AVE E · Feb 6, 2025 · 404 m away - Minor varianceRefused
To permit the addition of 4 storeys above the approved 23 storey building, as well as squaring off the curvature nature of the west façade by reducing the north, south and west tower setbacks. Please note this application was previously deferred Thursday, July 27, 2023.
717 MOUNT PLEASANT RD · Dec 7, 2023 · 224 m away - Minor varianceApproved
To alter the existing two-storey mixed-use building by constructing a third floor addition, a rear three-storey addition, a second dwelling unit and rear exterior stairs and landings accessing the second and third floors.
688 MOUNT PLEASANT RD · May 23, 2018 · 288 m away - Minor varianceApproved
To construct a new a new four-storey Salvation Army facility (place of worship and related accessory uses); along with vent shafts and an Emergency Exit Building (EEB) related to the new Eglinton Crosstown LRT station (Eglinton Station) at the rear of the site.
7 EGLINTON AVE E · Feb 14, 2018 · 471 m away - Minor varianceApproved
To alter the re-development plan approved under Site Specific By-law 622-2010 for the mixed-use building containing two residential towers with 36 and 33 storeys each and an eight-storey podium by reducing the required number of residential parking.
85 EGLINTON AVE E · Jan 6, 2016 · 289 m away
Latest activity nearby
- Building permit
Interior alternations to existing group D suite
150 EGLINTON AVE E · Nov 12, 2026 · 191 m away - Building permit
Designing and installing a sprinkler modification system
110 EGLINTON AVE E · Nov 10, 2026 · 295 m away - Building permit
REVISION-01: ON THE 3RD FLOOR REDUCES THE AREA OF SUITE #302 TO CREATE A SECOND SUITE FOR FUTURE LEASEPROPOSED INTERIOR ALTERATIONS ON 3RD FLOOR FOR OFFICE SUITE FITOUT.
240 EGLINTON AVE E · Nov 10, 2026 · 90 m away - Building permit
Revision 01: New scope includes full interior renovation of the basement and ground floors including architectural, structural, hvac, electrical and plumbing and drainage for personal Service Shop (Beauty Salon).Basement Underpinning (24.82m), Basement Benching (14.63m), and Drain Permit
688 MOUNT PLEASANT RD · Nov 6, 2026 · 288 m away - Building permit
Backflow Device Replacement
244 EGLINTON AVE E · Nov 5, 2026 · 101 m away - Zoning review
Not Started
689 MOUNT PLEASANT RD · Nov 3, 2026 · 297 m away - Building permit
Proposal for interior alterations to expand existing laundry room and install a universal washroom.
130 EGLINTON AVE E · Oct 23, 2026 · 238 m away - Building permit
Wholesale replacement of exterior sealants. Wholesale replacement off vent grills. Localized masonry repairs including brick replacement and mortar joint repointing. Localized concrete balcony slab surface and slab edge repairs. Localized surface repairs at deteriorated EIFS cladding.
123 EGLINTON AVE E · Oct 21, 2026 · 146 m away - Building permit
Proposal to install two Maglocks - doors P100b and P00b at the level P1.
170 ROEHAMPTON AVE · Oct 14, 2026 · 241 m away - Building permit
Reconstruction of the existing deck and exterior stairs, including the construction of new reinforced concrete masonry unit (CMU) walls to support the new deck.
176 EGLINTON AVE E · Oct 9, 2026 · 122 m away
Neighbourhood: South Eglinton-Davisville
About the area around the lot, not the lot itself.
- Nearest station
- Mount Pleasant Station2 min walk
- Nearest TTC stop
- Eglinton Ave East at Redpath Ave1 min walk
- Nearest cycling route
- Broadway AveSigned Route (No Pavement Markings), 6 min walk
- Nearest traffic count
- 4,629 vehicles in 8 hEglinton Ave E / Brownlow Ave, 40 m away, Dec 15, 2021
- Serious collisions within 500 m
- 32021–2026, killed or seriously injured: 1 fatal, 3 with pedestrians, 0 with cyclists
- Parks
- 174 Soudan Avenue Park4 min walk
- Dunfield Park5 min walk
- Dawn Redwood Park6 min walk
Schools within 1 km
- EGLINTON JR PUBLIC SCHOOL English Public 1 min walk
- WILLOWDALE HIGH SCHOOL Private 3 min walk
- CAREERQUEST Private 3 min walk
- TORONTO STEM SCHOOL Private 5 min walk
- NORTHERN SECONDARY SCHOOL English Public 5 min walk
- EGLINTON LINC AND ESL CENTRE English Separate 6 min walk
Being near a school does not mean the lot is in its catchment; check with the board.
2021 Census
| Figure | South Eglinton-Davisville | Median neighbourhood |
|---|---|---|
| Median household income (2020) | $80,000 | $84,500 |
| Households that own their home | 30% | 54% |
| Population (2021) | 22,735 | 16,813 |
| Homes built in 1960 or before | 11% | 29% |
| Homes needing major repairs | 3% | 7% |
Statistics Canada 2021 Census, 25% sample, by City of Toronto neighbourhood.
Police-reported crime, 2025
| Per 100,000 people | South Eglinton-Davisville | City median |
|---|---|---|
| Assault | 436 | 636.3 |
| Robbery | 24.2 | 69.5 |
| Auto theft | 58.8 | 192.6 |
| Theft over $5,000 | 20.8 | 46.1 |
| Break and enter | 128 | 172.8 |
| Theft from vehicles | 100.3 | 188.1 |
Neighbourhood totals from the Toronto Police Service. Rates are per resident, so areas with many visitors and few residents read high.