Everything here comes from public records: City of Toronto open data, TRCA and Statistics Canada, 15 sets in all. Each item leads to the record it comes from. Our sources
This house at a glance
Each score from 0 to 10: 0 needs attention, 10 all clear. Build potential is how much more you could add.
About 19 Rutherford Ave
19 Rutherford Ave is on a 10.2 m by 30.8 m lot on Rutherford Ave in Mount Dennis. The zoning is RM. A site-specific exception, 900.6.10(252), changes some of the usual rules for this address.
The City has 6 records on this lot since 2014. That is more than at 95% of Toronto houses. In 2020, a building permit was filed: "Construct a second and third storey addition to existing one storey detached dwelling, as well as interior alterations and covered front porch". Status: refusal notice. In 2020, a Committee of Adjustment application was filed: "To construct a two-storey addition above the existing dwelling, a two-storey front addition, a new covered front porch and a south side addition to the…". Status: closed. In 2015, a building permit was filed: "Proposal to construct a new detached garage in rear yard and rebuild front porch". Status: inspection. An open permit means the City has not closed the file. Ask the seller whether the work was finished and passed its final inspection.
Within 300 m, 3 development applications are open (the tallest up to 14 storeys). Within 300 m, the Committee of Adjustment decided 23 minor variance applications in the last 10 years and approved 100%. Mount Dennis station is a 10-minute walk.
Summary
What the City's records show on this house
- Building permit open since 2015ModerateFree check
- Site-specific exception 900.6.10(252)Moderate
- Registered short-term rentalModerate
- 1 by-law investigation closed in the last two yearsLow
- No permit for a second unit on fileLowFree check
- 3 development applications open within 300 mLowFree check
- Minimum frontage 12 mLow
- Site and Area Specific Policy 053Low
- Mount Dennis Secondary PlanLow
- 1 Committee of Adjustment file on this lotLowFree check
Left unchecked, any of these can mean unexpected costs, trouble after closing, or plans you can't carry out. Found before you offer, they give you room to negotiate. The full report explains what each one means for this house and what to do next.
What the rules allow here: Multiplex up to 4 units · Garden suite
15 sets of public records, already checked for you. Searching each one yourself and working out what it means for you takes time. We have done that work: what matters about this house and lot, in plain English, in a few minutes.
What to find out first
1 thing to check before you offer.
What to find out before an offer, the steps to take, what each costs and how long it takesUnlock
Open City files
How much in the City's records needs answers before an offer
- Building permit open since 2015
- 1 by-law investigation closed in the last two years
- Registered short-term rental
What this part means for this house, in plain EnglishUnlock
Building permit open since 2015
ModerateCheck before you offerSee the open permit check for this house
What the record shows, what it means for you and what to doUnlock
Registered short-term rental
ModerateCheck if it appliesWhat the record shows, what it means for you and what to doUnlock
1 by-law investigation closed in the last two years
LowCheck if it appliesWhat the record shows, what it means for you and what to doUnlock
No permit for a second unit on file
LowCheck if it appliesSee the basement apartment check for this house
What the record shows, what it means for you and what to doUnlock
1 Committee of Adjustment file on this lot
LowFor later, once you own itSee the next door check for this house
What the record shows, what it means for you and what to doUnlock
What this means: Toronto zoning by addressWhat this means: Building permits before buyingWhat this means: Committee of Adjustment
City files on this lot
6 records on file, more than at 95% of Toronto houses (median 0 records).
| Date | Record | As the City filed it | In plain words | Status |
|---|---|---|---|---|
| 2025-08-19 | By-law investigation25 212889 ZON 00 IR | Zoning | Closed | |
| 2020-06-10 | Building permit20 154569 | Construct a second and third storey addition to existing one storey detached dwelling, as well as interior alterations and covered front porch. | Refusal Notice | |
| 2020-01-30 | Minor varianceA0632/19EYK | To construct a two-storey addition above the existing dwelling, a two-storey front addition, a new covered front porch and a south side addition to the existing detached garage. | Approved | |
| 2019-08-13 | Zoning review19 205366 ZZC | No description on file | Closed | |
| 2015-09-22 | Building permit15 218734 | Proposal to construct a new detached garage in rear yard and rebuild front porch. | Inspection | |
| 2014-06-10 | Building permit14 171388 | Back Water Valve (Sewer only) | Closed |
Restrictions
How much heritage, nature and site-specific rules limit changes to the house
- Site-specific exception 900.6.10(252)
- No heritage listing or designation
What this part means for this house, in plain EnglishUnlock
Site-specific exception 900.6.10(252)
ModerateCheck if it appliesWhat the record shows, what it means for you and what to doUnlock
Site and Area Specific Policy 053
LowFor later, once you own itWhat the record shows, what it means for you and what to doUnlock
Mount Dennis Secondary Plan
LowFor later, once you own itWhat the record shows, what it means for you and what to doUnlock
If you want to change or build
What the site-specific rules mean for an addition, a garage or a rebuild.
Site-specific exception 900.6.10(252)
What the exception changes for this address, rule by ruleUnlock
Flood and erosion rules
How much of the lot lies in the areas TRCA regulates for flooding and erosion
- Outside the areas TRCA regulates
From TRCA's regulated areas only. Basement flooding, sewer back-up and the TRCA flood plain are not in this score yet; ask the seller and your insurer about water in the basement.
What this part means for this house, in plain EnglishUnlock
Build potential
How much more the rules allow on this lot, beyond what is on record
- Multiplex up to 4 units: likely fits
- Garden suite: likely fits
- Secondary suite: likely fits
What this part means for this house, in plain EnglishUnlock
Minimum frontage 12 m
LowFor later, once you own itWhat the record shows, what it means for you and what to doUnlock
Multiplex up to 4 units
LowFor later, once you own itWhat the record shows, what it means for you and what to doUnlock
Garden suite
LowFor later, once you own itSee the garden suite check for this house
What the record shows, what it means for you and what to doUnlock
The lot and what the rules allow
- Zone
- RM (f12.0; u4; d0.8) (x252)
- Height limit
- 11 m
- Corner lot
- No
- Public lane
- None
- New house permit
- None since 2000
- House footprint
- 82 m²
- Back yard
- 14 m
- Buildings on the lot
- 1
House and yards from the City's 3D Massing; a survey gives exact figures.
What you can build
Why, measured on this lot, and the most you could buildUnlock
Building nearby
How much neighbours are building and applying to change within 300 m
- 3 development applications open within 300 m, up to 14 storeys
- 4 suite and multiplex permits within 300 m in 10 years
- 23 minor variance decisions within 300 m, 100% approved
What this part means for this house, in plain EnglishUnlock
3 development applications open within 300 m
LowCheck if it appliesSee the next door check for this house
What the record shows, what it means for you and what to doUnlock
What the City allowed next door
Within 500 m, last 10 years: a guide if you plan to build or apply for something similar.
What neighbours have built and changed around you, and how the City decidedUnlock
Area safety
Police-reported crime in the neighbourhood against the Toronto median
- Lower than the Toronto median in 5 of 8 categories
Neighbourhood rates per 100,000 people from the Toronto Police Service, not this street.
What this part means for this house, in plain EnglishUnlock
Mount Dennis neighbourhood
About the area, not this house.
2021 Census, against the median Toronto neighbourhood
Getting around and schools
- Mount Dennis StationNearest station10 min walk
- Weston Rd at Victoria BlvdNearest TTC stop1 min walk
- Pearen StNearest cycling route6 min walk
- Bala Avenue Community SchoolSchool4 min walk
- Darul Arqam Islamic Academy SchoolSchool12 min walk
- York Humber High SchoolSchool13 min walk
- Our Lady of Victory Catholic Elementary SchoolSchool14 min walk
Police-reported crime, 2025, per 100,000 people
- Assaultcity median 636.3562.1
- Robberycity median 69.583.3
- Homicidecity median 5.36.9
- Shootingscity median 10.513.9
- Auto theftcity median 192.6152.7
- Theft over $5,000city median 46.113.9
- Break and entercity median 172.8124.9
- Theft from vehiclescity median 188.1180.4
Ready emails
Copy and send as they are.
3 questions for the seller and your lawyer, written outUnlock
What we checked, and what the City's records don't cover
We checked 48 sets of City of Toronto, TRCA and Statistics Canada open data for this address, last updated Nov 27, 2026. Our records don't cover flooding history, ownership and mortgages, or the condition of the house: ask the seller and your insurer about water in the basement, your lawyer about title, and book a home inspection.
See every source and when we loaded it · Pre-offer checklist