HousePrecheckCheck an address

182 Spadina AveKensington-Chinatown, Toronto · City records before you offer

Also 184 Spadina Ave, 25 Cameron St

Commercial residential · CR 3.5 (c2.0; r2.5) SS2 (x2353)≈ 24.4 × 61.9 m1,135 m²on Spadina Avecorner, also on Bulwer St

2 things to check before you offer, including building permit open since 2023
N20 m
≈ 24.4 m frontage≈ 61.9 m deepirregular lot, estimated

Everything here comes from public records: City of Toronto open data, TRCA and Statistics Canada, 15 sets in all. Each item leads to the record it comes from. Our sources

This house at a glance

Each score from 0 to 10: 0 needs attention, 10 all clear. Build potential is how much more you could add.

About 182 Spadina Ave

182 Spadina Ave is on a 24.4 m by 61.9 m lot on Spadina Ave in Kensington-Chinatown. The zoning is CR. A site-specific exception, 900.11.10(2353), changes some of the usual rules for this address. The lot also fronts Bulwer St.

The City has 39 records on this lot since 1981. That is more than at 99% of Toronto houses. In 2026, a building permit was filed: "Proposal for alternative solution". Status: not started. In 2026, a building permit was filed: "An alternative solution for demonstrating the proposed alternative egress route through exit stair a-a, which continues upward to the level 1 mezzanine level…". Status: application received. In 2025, a Committee of Adjustment application was filed: "To alter the development standards (as approved under site specific zoning by-law 762-2023) for a new 14 and 15-storey hotel building (east tower fronting…". Status: omb appeal. 2 open permits mean the City has not closed the files. Ask the seller whether the work was finished and passed its final inspection.

Within 300 m, 10 development applications are open (the tallest up to 25 storeys). Osgoode station is a 14-minute walk, and the lot is in its Major Transit Station Area.

Summary

What the City's records show on this house

  • Building permit open since 2023ModerateFree check
  • Work or applications in progressModerateFree check
  • Site-specific exception 900.11.10(2353)Moderate
  • 10 development applications open within 300 mLowFree check
  • Priority retail street: Spadina AvenueLow
  • 2 City trees in front of this lotLowFree check
  • Site and Area Specific Policy 202Low
  • Downtown Plan Secondary PlanLow
  • 1 Committee of Adjustment file on this lotLowFree check

Left unchecked, any of these can mean unexpected costs, trouble after closing, or plans you can't carry out. Found before you offer, they give you room to negotiate. The full report explains what each one means for this house and what to do next.

Unlock the full report

15 sets of public records, already checked for you. Searching each one yourself and working out what it means for you takes time. We have done that work: what matters about this house and lot, in plain English, in a few minutes.

What to find out first

2 things to check before you offer.

What to find out before an offer, the steps to take, what each costs and how long it takesUnlock

Check carefully

Open City files

How much in the City's records needs answers before an offer

  • Building permit open since 2023
  • Work or applications in progress
  • No open orders or by-law investigations

What this part means for this house, in plain EnglishUnlock

  1. Building permit open since 2023

    ModerateCheck before you offer

    What the record shows, what it means for you and what to doUnlock

  2. Work or applications in progress

    ModerateCheck before you offer

    What the record shows, what it means for you and what to doUnlock

  3. 1 Committee of Adjustment file on this lot

    LowFor later, once you own it

    What the record shows, what it means for you and what to doUnlock

City files on this lot

39 records on file, more than at 99% of Toronto houses (median 0 records).

DateRecordAs the City filed itIn plain wordsStatus
2026-10-28Building permit
26 261477
Proposal for alternative solutionNot Started
2026-10-28Building permit
26 261441
An alternative solution for demonstrating the proposed alternative egress route through Exit Stair A-A, which continues upward to the Level 1 Mezzanine Level in a manner similar to a crossover floor, provides an alternative egress route that may be considered to satisfy the intent of the OBC.Application Received
2026-05-20By-law investigation
26 165654 GRA 00 IV
Notice Issued GraffitiClosed
2026-05-20By-law investigation
26 163337 GRA 00 IR
GraffitiClosed
2025-12-03Minor variance
A0646/25TEY
To alter the development standards (as approved under Site Specific Zoning By-law 762-2023) for a new 14 and 15-storey hotel building (east tower fronting Spadina Avenue, and west tower fronting Cameron Street), connected by a one-storey (with mezzanine) base building, which is currently under construction. To permit the increase of non-residential gross floor area, and the west building height from 15-storeys to 19-storeys tower (44.4 m to 57 m), and to alter the building setbacks. A related Site Plan Control (under File Number 20 21 250663 STE 10 SA) is approved with conditions. There will be a total of 280 hotel units on this lot.Refused
2025-09-24Building permit
25 229895
Alternative Solution for a standpipe system at the building located at 182-184 Spadina Avenue. This alternative solution addresses the proposed design of the standpipe system in which will be located in the exit stairs as opposed to the hose stations required to be installed in each storey.Approved
2025-09-04Zoning review
25 220551 ZPR
No description on fileClosed
2025-05-15Zoning review
25 159847 ZAP
No description on fileClosed
2024-08-23Building permit
22 216477
Part Permit - 16-STOREY HOTEL BLDG. WITH 250 GUEST SUITES, HOTEL AMENITIES & MECHANICAL PENTHOUSE ON 3 BELOW-GRADE LEVELS OF SERVICES, HOTEL BOH, BUSINESS & PERSONAL SERVICES & PARKINGSuperseded
2023-02-24Building permit
22 221054
Geothermal permit application. Proposed 40 boreholes, 700ft depth rooting and connecting the piping.Permit Issued
2022-08-05Building permit
22 186329
Proposal for Excavation and Shoring of an existing vacant lot. See 22 108746 STE 10 ESC for future development.Cancelled
2022-01-28Zoning review
19 199402 PRZ
No description on fileClosed
2022-01-28Zoning review
21 250663 PSP
No description on fileClosed
2021-12-21Development application
21 250663 STE 10 SA
Site Plan Approval for a hotel development comprised of two towers, one fronting Spadina Avenue (14 storeys - 41.45 metres including the mechanical penthouse) and the other fronting Cameron Street (19 storeys - 57 metres including the mechanical penthouse), connected by a two-storey base building. A total of 280 hotel suites are proposed. Parking and loading areas will be accessed via Cameron Street.Final Approval Completed
2019-08-01Development application
19 199402 STE 10 OZ
The application proposes to amend the Zoning By-law to redevelop the site with a hotel development comprised of a two-storey base building and two tower elements above, one fronting Spadina Avenue (14 storeys - 41.45 metres including the mechanical penthouse) and the other Cameron Street (15 storeys - 44.4 metres including the mechanical penthouse). A total of 250 hotel suites are proposed. Parking and loading areas will be accessed via Cameron Street. This file is being reviewed in conjunction with and application for site plan approval (File No 21- 250663 STE 10 SA).Closed
2018-11-21Zoning review
18 259181 LPR
No description on fileClosed
2018-06-26Zoning review
18 184628 LPR
No description on fileClosed
2010-12-08Zoning review
10 310506 ZPR
No description on fileClosed
2010-04-28Building permit
10 135100
Proposal for site services and grading for commercial parking lot. See also 09 115783 STE. Convenience address is 180-184 Spadina Ave.Closed
2010-04-20Zoning review
10 155695 LPR
No description on fileClosed
2009-03-20Zoning review
09 118597 PSP
No description on fileClosed
2009-03-10Development application
09 115783 STE 20 SA
Site plan approval application for surface parking lotClosed
2008-11-25Zoning review
08 224496 LPR
No description on fileClosed
2008-06-23Building permit
08 159201
Demolition of 180,182 and 184 Spadina Avenue (One two-storey building).Closed
2007-12-28Zoning review
07 289608 ZPR
No description on fileClosed
1997-01-21Zoning review
97 025832 LTO
No description on fileClosed
1997-01-02Zoning review
97 025793 LTO
No description on fileClosed
1996-10-16Zoning review
96 025589 LTO
No description on fileClosed
1996-06-04Zoning review
96 025063 LTO
No description on fileClosed
1994-01-10Zoning review
94 024429 LTO
No description on fileClosed
1988-04-25Zoning review
88 030337 LTO
No description on fileClosed
1986-11-03Zoning review
86 028487 LTO
No description on fileClosed
1986-11-03Zoning review
86 028484 LTO
No description on fileClosed
1986-07-11Zoning review
86 028251 LTO
No description on fileClosed
1986-07-11Zoning review
86 028250 LTO
No description on fileClosed
1986-06-20Zoning review
86 028198 LTO
No description on fileClosed
1986-06-19Zoning review
86 028197 LTO
No description on fileClosed
1986-06-04Zoning review
86 028141 LTO
No description on fileClosed
1981-01-22Zoning review
81 029855 LTO
No description on fileClosed
Minor

Restrictions

How much heritage, nature and site-specific rules limit changes to the house

  • Site-specific exception 900.11.10(2353)
  • Priority retail street: Spadina Avenue
  • No heritage listing or designation

What this part means for this house, in plain EnglishUnlock

  1. Site-specific exception 900.11.10(2353)

    ModerateCheck if it applies

    What the record shows, what it means for you and what to doUnlock

  2. Priority retail street: Spadina Avenue

    LowFor later, once you own it

    What the record shows, what it means for you and what to doUnlock

  3. 2 City trees in front of this lot

    LowFor later, once you own it

    What the record shows, what it means for you and what to doUnlock

  4. Site and Area Specific Policy 202

    LowFor later, once you own it

    What the record shows, what it means for you and what to doUnlock

  5. Downtown Plan Secondary Plan

    LowFor later, once you own it

    What the record shows, what it means for you and what to doUnlock

If you want to change or build

What the site-specific rules mean for an addition, a garage or a rebuild.

Site-specific exception 900.11.10(2353)

What the exception changes for this address, rule by ruleUnlock

Not on this lot

Flood and erosion rules

How much of the lot lies in the areas TRCA regulates for flooding and erosion

  • Outside the areas TRCA regulates

From TRCA's regulated areas only. Basement flooding, sewer back-up and the TRCA flood plain are not in this score yet; ask the seller and your insurer about water in the basement.

What this part means for this house, in plain EnglishUnlock

Little left to add

Build potential

How much more the rules allow on this lot, beyond what is on record

What this part means for this house, in plain EnglishUnlock

The lot and what the rules allow

N20 m
≈ 24.4 m frontage≈ 61.9 m deepon Spadina Ave
Zone
CR 3.5 (c2.0; r2.5) SS2 (x2353)
Height limit
28 m
Corner lot
Yes, also on Bulwer St
Public lane
None
House footprint
13 m²
Back yard
1.1 m
Buildings on the lot
1

House and yards from the City's 3D Massing; a survey gives exact figures.

What you can build

    Why, measured on this lot, and the most you could buildUnlock

    Busy

    Building nearby

    How much neighbours are building and applying to change within 300 m

    • 10 development applications open within 300 m, up to 25 storeys
    • In the King-Bathurst station area
    • 4 suite and multiplex permits within 300 m in 10 years

    What this part means for this house, in plain EnglishUnlock

    1. 10 development applications open within 300 m

      LowCheck if it applies

      What the record shows, what it means for you and what to doUnlock

    What the City allowed next door

    Within 500 m, last 10 years: a guide if you plan to build or apply for something similar.

    What neighbours have built and changed around you, and how the City decidedUnlock

    Crime well above median

    Area safety

    Police-reported crime in the neighbourhood against the Toronto median

    • Lower than the Toronto median in 1 of 7 categories
    • Theft over $5,000: 4.8 times the Toronto median
    • Theft from vehicles: 4.5 times the Toronto median
    • Assault: 3.2 times the Toronto median
    • Robbery: 2.8 times the Toronto median
    • Break and enter: 2.6 times the Toronto median
    • Shootings: 2.1 times the Toronto median

    Neighbourhood rates per 100,000 people from the Toronto Police Service, not this street.

    What this part means for this house, in plain EnglishUnlock

    Kensington-Chinatown neighbourhood

    About the area, not this house.

    2021 Census, against the median Toronto neighbourhood

    Median household income (2020)$62,000median $84,500
    Households that own their home32%median 54%
    Population (2021)18,120median 16,813
    Homes built in 1960 or before26%median 29%
    Homes needing major repairs8%median 7%

    Getting around and schools

    • Osgoode StationNearest station14 min walk
    • Spadina Ave at Queen St West North SideNearest TTC stop1 min walk
    • Richmond St WNearest cycling route3 min walk
    • Ogden Jr Public SchoolSchool3 min walk
    • Alpha Alternative & Oasis AlternativeSchool7 min walk
    • Ryerson Community School & Downtown Vocal Music AcademySchool7 min walk
    • OCAD University - Aboveground Art SuppliesSchool10 min walk

    Police-reported crime, 2025, per 100,000 people

    • Assaultcity median 636.32017.5
    • Robberycity median 69.5193
    • Shootingscity median 10.521.9
    • Auto theftcity median 192.6118.4
    • Theft over $5,000city median 46.1219.3
    • Break and entercity median 172.8443
    • Theft from vehiclescity median 188.1850.8

    More about Kensington-Chinatown

    Ready emails

    Copy and send as they are.

    4 questions for the seller and your lawyer, written outUnlock

    What we checked, and what the City's records don't cover

    We checked 48 sets of City of Toronto, TRCA and Statistics Canada open data for this address, last updated Nov 27, 2026. Our records don't cover flooding history, ownership and mortgages, or the condition of the house: ask the seller and your insurer about water in the basement, your lawyer about title, and book a home inspection.

    See every source and when we loaded it · Pre-offer checklist

    Something here not right?

    Screening tool based on City of Toronto and TRCA open data. Not a zoning review or legal opinion. Site-specific exceptions, amendments not yet in the open data, minor variances and other by-laws can change the answer. Confirm with a Preliminary Project Review or Zoning Certificate from Toronto Building before buying or designing.

    Scores calibrated on Toronto house lots on 2026-10-19; prices and sources checked on 2026-10-06. Contains information licensed under the Open Government Licence – Toronto. TRCA regulation limits © Toronto and Region Conservation Authority.

    Full pre-offer report · 182 Spadina Ave

    2 things to check at 182 Spadina Ave before you offer

    • Building permit open since 2023Moderate
    • Work or applications in progressModerate
    • Site-specific exception 900.11.10(2353)Moderate
    • 10 development applications open within 300 mLow
    • and 5 more

    The report explains what each one can cost you on this house and what to ask the seller or the City before you offer.

    $29 CAD one time · opens right away

    See a sample report

    Full refund within 30 days if the report left out or misstated a City record on the lot. Refund policy

    Also in the report

    • A PDF to forward to your agent and lawyer
    • What you can build on this lot, measured on it
    • Every line linked to the City record it comes from
    • 15 sets of public records, already searched and read for you
    • A clear list of the 7 steps to take before you offer, so nothing slips
    • What each of the 9 findings can cost you or stop you doing, in plain English
    • A two-minute summary of this house, and what to find out first before you offer
    • What the City allowed your neighbours, a guide if you plan to build or apply for something similar
    • We watch this address for 90 days. If anything changes in the City's records, we email you the same day
    • A short summary of each part: City files, restrictions, flood and erosion, build potential, building nearby, area safety

    By paying you agree to the terms of use and the refund policy. Payment by Stripe. The report opens right after payment, and we email you a link to it; your account is made from the email you pay with. A screening of public records, not a legal opinion or a home inspection.

    Flag an error

    What is not right?

    The problem

    The records come from the City's open data; we check each flag against them. Your email is used only to answer this.