This house at a glance
Each score from 0 to 10: 0 needs attention, 10 all clear. Build potential is how much more you could add.
About 1815 Eglinton Ave W
1815 Eglinton Ave W is on a 58.2 m by 44.7 m lot on Eglinton Ave W in Oakwood Village. The zoning is CR. A site-specific exception, 900.11.10(142), changes some of the usual rules for this address.
The City has 26 records on this lot since 2002. That is more than at 99% of Toronto houses. In 2023, a building permit was filed: "Protection of standpipe systems at all stations". Status: approved. In 2023, a building permit was filed: "Revision 01 - addition of platform edge bollards. refer to typical design approvals in ads 22 193328, 22 200930, 22 216439 and 22 216647construct for the…". Status: closed. In 2023, a building permit was filed: "Installation for future presto faregates at fairbank station". Status: closed. 2 open permits mean the City has not closed the files. Ask the seller whether the work was finished and passed its final inspection.
Within 300 m, 12 development applications are open (the tallest up to 50 storeys). Fairbank station is a 1-minute walk, and the lot is in its Major Transit Station Area.
Summary
What the City's records show on this house
- 2 building permits open, the oldest since 2004ModerateFree check
- Work or applications in progressModerateFree check
- Site-specific exception 900.11.10(142)Moderate
- 12 development applications open within 300 mLowFree check
- Site and Area Specific Policy 477Low
Left unchecked, any of these can mean unexpected costs, trouble after closing, or plans you can't carry out. Found before you offer, they give you room to negotiate. The full report explains what each one means for this house and what to do next.
15 sets of public records, already checked for you. Searching each one yourself and working out what it means for you takes time. We have done that work: what matters about this house and lot, in plain English, in a few minutes.
What to find out first
2 things to check before you offer.
What to find out before an offer, the steps to take, what each costs and how long it takesUnlock
Open City files
How much in the City's records needs answers before an offer
- 2 building permits open, the oldest since 2004
- Work or applications in progress
- No open orders or by-law investigations
What this part means for this house, in plain EnglishUnlock
2 building permits open, the oldest since 2004
ModerateCheck before you offerSee the open permit check for this house
What the record shows, what it means for you and what to doUnlock
Work or applications in progress
ModerateCheck before you offerSee the open permit check for this house
What the record shows, what it means for you and what to doUnlock
What this means: Building permits before buying
City files on this lot
26 records on file, more than at 99% of Toronto houses (median 0 records).
| Date | Record | As the City filed it | In plain words | Status |
|---|---|---|---|---|
| 2026-05-29 | By-law investigation26 170172 GRA 00 IR | Graffiti | Closed | |
| 2026-05-29 | By-law investigation26 170127 GRA 00 IV | Notice Issued Graffiti | Closed | |
| 2026-05-29 | By-law investigation26 170116 GRA 00 IR | Graffiti | Closed | |
| 2026-05-22 | By-law investigation26 165641 GRA 00 IR | Graffiti | Closed | |
| 2024-01-08 | Building permit24 102471 | Alternative solution - per sentence 3.13.5.4.(1) of OBC, each rapid transit station must be "monitored" by a central supervising station (CSS) conforming to CAN/ULC-S561. Based on the definition of CSS and overall approach to fire safety in rapid transit stations and the role played by the CSS, our position of this provision is that monitoring in this context is not exclusively limited to monitoring of the fire alarm system. Further, it is our position that the intent behind this sentence is to ensure that the CSS meets the high level of reliability that would be achieved by complying with CAN/ULC-S561, including the robust fire alarm, emergency power and security requirements contained within this standard.Based on the review described in the SenezCo report dated January 8 2024, accompanying this submission, the coordination of system response for different fire emergencies, will provide the level of protection intended by OBC Sentences 3.13.5.4.(1) and 3.13.5.6.(2) for communication to the central supervising station, including the use of a certified 3rd party monitoring company to relay signals from the station fire alarm panels.Further, the BOCC was designed and constructed in a manner that substantially meets or otherwise meets the intent of CAN/ULC S561, and the functions intended by the OBC definition of a central supervising station. On this basis, and with the implementation of the protocols described in the SenezCo report, the operation of the transit system from the BOCC by CTS affords the level of protection anticipated by the OBC for transit stations | Cancelled | |
| 2023-08-25 | Building permit23 193685 | Protection of Standpipe Systems at all Stations | Approved | |
| 2023-04-14 | Building permit16 234366 | Revision 01 - addition of platform edge bollards. Refer to typical design approvals in ADS 22 193328, 22 200930, 22 216439 and 22 216647Construct for the future station to the Eglinton LRT line at the Fairbank Station. | Closed | |
| 2023-02-07 | Building permit22 230715 | Installation for future Presto Faregates at Fairbank Station | Closed | |
| 2022-08-19 | Building permit22 193328 | Provide edge installation for bollard barriers | Approved | |
| 2021-08-24 | Development application21 203361 STE 12 SA | Site Plan Approval for a 41-storey mixed-use building having a non-residential gross floor area of 880 square metres, and a residential gross floor area of 31,616 square metres. A total of 485 units are proposed, of which 47 are rental replacement units. Proposal include a community agency space on the ground and second floors. | Under Review | |
| 2020-07-21 | Development application20 170662 STE 12 OZ | March 2022 key revisions: increase in height from 30 storeys to 41 storeys; increase in units count to 446; tower setback 0.0 m on west side; and approximately 5000 sq ft community agency space proposed on ground floor and second floor. Original submission: Proposal for a 30-storey tower (106.53 metres to the top of the mechanical penthouse) inclusive of a 4-storey podium along the Eglinton Avenue West frontage, which steps down to 1 storey along the Vaughan Road frontage at the rear of the Site. A total of 22,175 square metres of residential gross floor area and 455 square metres of non-residential gross floor area are proposed. A total of 284 residential dwelling units are proposed on the lot. | Closed | |
| 2018-05-23 | Building permit18 122290 | Site Services for the main entrance, secondary entrance and service building at Fairbank Station for the Eglinton LRT | Closed | |
| 2017-11-16 | Building permit17 263520 | Egress requirements from service rooms and spaces | Approved | |
| 2017-09-22 | Zoning review13 133553 PSP | No description on file | Closed | |
| 2017-03-16 | Building permit17 119796 | Site Services for the site trailer's washrooms at the construction location of Fairbank Station for the Eglinton LRT | Closed | |
| 2015-06-22 | Building permit15 135341 | Demolish existing Esso gas station canopy and convenience store for future Eglinton Crosstown LRT - Dufferin Station | Closed | |
| 2013-03-14 | Development application13 133553 NNY 15 SA | Eglionton Crosstown LRT - Fairbank Station | Closed | |
| 2012-01-27 | Zoning review12 113490 ZPR | No description on file | Closed | |
| 2010-11-26 | Building permit10 299768 | Backflow preventer | Permit Issued | |
| 2005-08-11 | Zoning review05 169813 LTO | No description on file | Closed | |
| 2004-12-13 | Building permit04 197091 | Interior alterations to convenience store | Inspection | |
| 2004-04-29 | Zoning review04 129353 ZPU | No description on file | Closed | |
| 2003-05-15 | Building permit03 112159 | Out side services for new gas bar. Refer to building permit # 03-112142. | Closed | |
| 2003-05-15 | Building permit03 112142 | To construct new gas bar and convenience store. | Closed | |
| 2003-05-15 | Building permit03 112135 | To demolish existing gas bar and all structures. | Closed | |
| 2002-05-14 | Zoning review02 135884 PSP | No description on file | Closed |
Restrictions
How much heritage, nature and site-specific rules limit changes to the house
- Site-specific exception 900.11.10(142)
- No heritage listing or designation
What this part means for this house, in plain EnglishUnlock
Site-specific exception 900.11.10(142)
ModerateCheck if it appliesWhat the record shows, what it means for you and what to doUnlock
Site and Area Specific Policy 477
LowFor later, once you own itWhat the record shows, what it means for you and what to doUnlock
What this means: Toronto zoning by address
If you want to change or build
What the site-specific rules mean for an addition, a garage or a rebuild.
Site-specific exception 900.11.10(142)
What the exception changes for this address, rule by ruleUnlock
Flood and erosion rules
How much of the lot lies in the areas TRCA regulates for flooding and erosion
- Outside the areas TRCA regulates
From TRCA's regulated areas only. Basement flooding, sewer back-up and the TRCA flood plain are not in this score yet; ask the seller and your insurer about water in the basement.
What this part means for this house, in plain EnglishUnlock
Build potential
How much more the rules allow on this lot, beyond what is on record
What this part means for this house, in plain EnglishUnlock
The lot and what the rules allow
- Zone
- CR 2.5 (c2.5; r2.5) SS2 (x142)
- Height limit
- 24 m
- Corner lot
- No
- Public lane
- None
- House footprint
- 260 m²
- Back yard
- 19.7 m
- Buildings on the lot
- 1
House and yards from the City's 3D Massing; a survey gives exact figures.
What you can build
Why, measured on this lot, and the most you could buildUnlock
Building nearby
How much neighbours are building and applying to change within 300 m
- 12 development applications open within 300 m, up to 50 storeys
- In the Fairbank station area
- 4 suite and multiplex permits within 300 m in 10 years
What this part means for this house, in plain EnglishUnlock
12 development applications open within 300 m
LowCheck if it appliesSee the next door check for this house
What the record shows, what it means for you and what to doUnlock
What this means: Committee of Adjustment
What the City allowed next door
Within 500 m, last 10 years: a guide if you plan to build or apply for something similar.
What neighbours have built and changed around you, and how the City decidedUnlock
Area safety
Police-reported crime in the neighbourhood against the Toronto median
- Lower than the Toronto median in 5 of 7 categories
Neighbourhood rates per 100,000 people from the Toronto Police Service, not this street.
What this part means for this house, in plain EnglishUnlock
Oakwood Village neighbourhood
About the area, not this house.
2021 Census, against the median Toronto neighbourhood
Getting around and schools
- Fairbank StationNearest station1 min walk
- Fairbank Station Westbound PlatformNearest TTC stop1 min walk
- Vaughan RdNearest cycling route4 min walk
- Fairbank Public SchoolSchool2 min walk
- Lycee Francais de TorontoSchool4 min walk
- St Thomas Aquinas Catholic Elementary SchoolSchool5 min walk
- Fairbank Memorial Community SchoolSchool10 min walk
Police-reported crime, 2025, per 100,000 people
- Assaultcity median 636.3646.7
- Robberycity median 69.512.8
- Shootingscity median 10.54.3
- Auto theftcity median 192.6200
- Theft over $5,000city median 46.112.8
- Break and entercity median 172.8106.4
- Theft from vehiclescity median 188.1140.4
Ready emails
Copy and send as they are.
4 questions for the seller and your lawyer, written outUnlock
What we checked, and what the City's records don't cover
We checked 48 sets of City of Toronto, TRCA and Statistics Canada open data for this address, last updated Nov 28, 2026. Our records don't cover flooding history, ownership and mortgages, or the condition of the house: ask the seller and your insurer about water in the basement, your lawyer about title, and book a home inspection.