Before you offer
From the City's records on this lot. Each item says what it means for a purchase and how to confirm it.
Building permit open since 2023
Needs a closer lookStill open in the City's records: 23 131817 (Proposed replacement of aluminum railing at rooftop patio of the existing apartment bui..., 2023, status Permit Issued).
What it means. An open permit can mean work that was never finished or never passed final inspection. After closing, finishing it or closing the file can fall to you.
How to confirm. Ask the seller for the final inspection records. A Property Information Report from Toronto Building lists open permits, inspections and outstanding orders ($214.79, about five business days). Details
City of Toronto, Building Permits (active, cleared since 2017, cleared 2000-2016)1 by-law investigation closed in the last two years
Good to knowClosed files (Zoning): 25 120736 ZON 00 IR (Zoning, 2025).
What it means. Someone raised an issue here and the City closed the file. Ask the seller what it was about.
City of Toronto, Toronto Building orders and Municipal Licensing and Standards investigationsWork or applications in progress
Good to knowRecent records on this lot: 25 253929 (Proposal to replace make-up air unit at mechanical penthouse room and upper roof elevas..., 2025).
What it means. The owner has planned or started work. Ask what it covers, whether it will be finished before closing, and who pays for what is left.
How to confirm. Application details and decisions are in the City's Application Information Centre. A Property Information Report from Toronto Building lists open permits, inspections and outstanding orders ($214.79, about five business days). Details
City of Toronto, Building Permits (active, cleared since 2017, cleared 2000-2016); City of Toronto, Committee of Adjustment applications (2001 onwards); City of Toronto, Development Applications15 development applications open within 300 m
Good to know15 rezoning, site plan, subdivision or condominium applications within 300 m, submitted in the last 10 years, are not closed yet, including buildings of up to 48 storeys. They are listed under Around this lot.
What it means. New buildings nearby can change views, sunlight, traffic and construction noise for years.
How to confirm. Each application, its drawings and its status are in the Application Information Centre. Details
City of Toronto, Development Applications
Not in these records
- Flooding history. Past basement flooding and insurance claims on this house are not published. Ask the seller directly and ask your insurer before you firm up the offer.
- Ownership, mortgages and easements. Title is not open data. Your lawyer searches title after the offer; ask for the survey and any easements before.
History of this lot
5 records on file: more than at 93% of Toronto houses (median 0).
- Building permit25 253929Permit Issued
Proposal to replace make-up air unit at mechanical penthouse room and upper roof elevastor machine room.
Dec 16, 2025 · 18 MERTON ST - By-law investigation25 120736 ZON 00 IRClosed
Zoning
Feb 24, 2025 · 18 MERTON ST - Building permit23 131817Permit Issued
Proposed replacement of aluminum railing at rooftop patio of the existing apartment building.
Jul 18, 2023 · 18 MERTON ST - Building permit19 246565Closed
Proposal to install 2 maglocks in existing ground floor lobby.
Nov 8, 2019 · 18 MERTON ST - Building permit10 130460Closed
Proposal to install 2 backflow prevention devices in an existing apartment building.
Apr 9, 2010 · 18 MERTON ST
Check before you build
Site-specific exception 900.11.10(2505)
Needs a closer look5 site-specific rules and 5 older by-laws that still prevail apply to this lot. They can override the standard rules on this page.
Zoning By-law 569-2013, Chapter 900
These parts of the exception apply to this lot's address.
- Rule A
In a Commercial Residential zone, where the maximum lawfully permitted height exceeds the width of the right-of-way of the street it abuts then: (i) the angular plane requirements of regulations 40.10.40.70(2)(E) and 40.10.40.70(2)(G) do not apply; (ii) the rear yard setback requirements of regulation 40.10.40.70(2)(B) do not apply; and (iii) if the rear main wall of a building does not contain windows or openings: (a) the building must be set back at least 3.0 metres from any rear lot line that abuts a lot in the Residential Zone category; and (b) no building setback is required from any other zone category. Prevailing By-laws and Prevailing Sections: (A) Section 12(2) 118 of former City of Toronto By-law 438-86
- Rule B
Section 12(2) 119 of former City of Toronto By-law 438-86
- Rule C
Section 12(2) 269 of former City of Toronto By-law 438-86
- Rule D
Section 12(2) 270(a) of former City of Toronto By-law 438-86
- Rule E
On 18 Merton St. and 1819 Yonge St., former City of Toronto by-law 394-87.
- Older by-law A
In a Commercial Residential zone, where the maximum lawfully permitted height exceeds the width of the right-of-way of the street it abuts then: (i) the angular plane requirements of regulations 40.10.40.70(2)(E) and 40.10.40.70(2)(G) do not apply; (ii) the rear yard setback requirements of regulation 40.10.40.70(2)(B) do not apply; and (iii) if the rear main wall of a building does not contain windows or openings: (a) the building must be set back at least 3.0 metres from any rear lot line that abuts a lot in the Residential Zone category; and (b) no building setback is required from any other zone category. Prevailing By-laws and Prevailing Sections: (A) Section 12(2) 118 of former City of Toronto By-law 438-86
- Older by-law B
Section 12(2) 119 of former City of Toronto By-law 438-86
- Older by-law C
Section 12(2) 269 of former City of Toronto By-law 438-86
- Older by-law D
Section 12(2) 270(a) of former City of Toronto By-law 438-86
- Older by-law E
On 18 Merton St. and 1819 Yonge St., former City of Toronto by-law 394-87.
Lot facts
- Area
- 663 m²
- Frontage
- 25.2 m
- Depth
- 30.3 m
- Street
- Merton St
- Corner lot
- No
- Public lane
- Al Green Lane, 37.6 m along it
- Max height
- 38 m
- Max lot coverage
- —
- Major Transit Station Area: Davisville. The lot is inside the Davisville Major Transit Station Area approved by the Province (Site and Area Specific Policy 722). Source
- Yonge-Eglinton Secondary Plan. A Secondary Plan sets more detailed land use, height and density policies for this area. Source
- Zone CR 3.0 (c3.0; r2.5) SS2 (x2505) (Commercial Residential). Chapter 40, section 40.10 of the by-law. Source
Around this lot
- Minor variances approved
- 86%6 of 7 decisions
- Garden suite permits
- 0
- Laneway suite permits
- 0
- Multiplex permits
- 0
- Development applications
- 29
Within 300 m, last 10 years. 0 suite and multiplex permits: no more than at most Toronto houses (median 3). 7 variance decisions: no more than at most Toronto houses (median 19).
Recent variance decisions in the same zone
- Minor varianceApproved
To alter the existing 12-storey apartment building (Building A) by enclosing the double-height opening within Unit 417 (located on the fourth and fifth levels) for additional habitable space.
119 MERTON ST · Nov 19, 2025 · 255 m away - Minor varianceApproved
To alter the mezzanine levels within two adjacent dwelling units (units 1210 and 1216).
119 MERTON ST · May 31, 2023 · 255 m away - Minor varianceApproved
To legalize and to maintain the shed that has been constructed between the two-storey building and the detached garage, without the benefit of a building permit.
1913 YONGE ST · Jun 8, 2022 · 243 m away - Minor varianceApproved
To permit the provisions of By-law 438-86, as amended by prevailing by law 967-88 to continue to be administered and applied over the entire parcel of lands collectively municipally known as 1920/1944 Yonge Street, notwithstanding any further conveyance, partition, or division of the lands.
1944 YONGE ST · Feb 28, 2017 · 318 m away - Minor varianceApproved
To permit the provisions of By-law 438-86, as amended by prevailing by law 967-88 to continue to be administered and applied over the entire parcel of lands collectively municipally known as 1920/1944 Yonge Street, notwithstanding any further conveyance, partition, or division of the lands.
1944 YONGE ST · Feb 28, 2017 · 318 m away
Latest activity nearby
- Zoning review
Application On Hold
1849 YONGE ST · Nov 23, 2026 · 64 m away - Zoning review
Closed
119 MERTON ST · Nov 3, 2026 · 255 m away - Zoning review
Closed
1920 YONGE ST · Oct 29, 2026 · 293 m away - Building permit
INTERIOR ALTERATIONS - DEMISING PARTITION - UNIT 906
1867 YONGE ST · Oct 29, 2026 · 92 m away - Consent (lot split)Approved
To obtain consent to sever the property into three stratified lots (commercial parking lands, retail lands, and residential lands) and to create various easements/rights-of-ways for the approved 37-storey mixed-use building with a three level below grade parking garage (currently under construction).
30 MERTON ST · Oct 21, 2026 · 43 m away - Building permit
Proposed interior alterations for interior cosmetic upgrades including washer/ dryer addition.No changes to existing HVAC system - no HVA permit required
111 LAWTON BLVD · Oct 8, 2026 · 283 m away - Building permit
Proposed interior alterations to the existing medical office.
1835 YONGE ST · Oct 7, 2026 · 34 m away - Building permit
Proposed Vehicular Ramp Repairs.
19 LASCELLES BLVD · Sep 23, 2026 · 244 m away - Building permit
1 wall sign**DAVISVILLE MEDICAL DENTAL CENTRE**
1849 YONGE ST · Sep 17, 2026 · 64 m away - Building permit
To erect and display one illuminated wall sign*****DAVISVILLE MEDICAL DENTAL CENTRE*****
1849 YONGE ST · Aug 26, 2026 · 64 m away
Neighbourhood: South Eglinton-Davisville
About the area around the lot, not the lot itself.
- Nearest station
- Davisville Station3 min walk
- Nearest TTC stop
- Yonge St at Merton St North Side1 min walk
- Nearest cycling route
- Yonge StCycle Track, 1 min walk
- Nearest traffic count
- 5,850 vehicles in 8 hMerton St / Al Green Lane / Lane E of Yonge and S of Merton, 30 m away, May 1, 2019
- Serious collisions within 500 m
- 32021–2026, killed or seriously injured: 1 fatal, 1 with pedestrians, 0 with cyclists
- Parks
- Kay Gardner Beltline Park1 min walk
- Oriole Park - Toronto4 min walk
- Fiona Nelson Parkette5 min walk
Schools within 1 km
- DAVISVILLE & SPECTRUM SCHOOL English Public 5 min walk
- THE YORK SCHOOL - JR CAMPUS Private 9 min walk
- THE STUDY ACADEMY Private 9 min walk
- THE STUDY ACADEMY SCHOOL Private 9 min walk
- UPPER CANADA COLLEGE SCHOOL Private 12 min walk
- DEER PARK JR & SR PUBLIC SCHOOL English Public 13 min walk
Being near a school does not mean the lot is in its catchment; check with the board.
2021 Census
| Figure | South Eglinton-Davisville | Median neighbourhood |
|---|---|---|
| Median household income (2020) | $80,000 | $84,500 |
| Households that own their home | 30% | 54% |
| Population (2021) | 22,735 | 16,813 |
| Homes built in 1960 or before | 11% | 29% |
| Homes needing major repairs | 3% | 7% |
Statistics Canada 2021 Census, 25% sample, by City of Toronto neighbourhood.
Police-reported crime, 2025
| Per 100,000 people | South Eglinton-Davisville | City median |
|---|---|---|
| Assault | 436 | 636.3 |
| Robbery | 24.2 | 69.5 |
| Auto theft | 58.8 | 192.6 |
| Theft over $5,000 | 20.8 | 46.1 |
| Break and enter | 128 | 172.8 |
| Theft from vehicles | 100.3 | 188.1 |
Neighbourhood totals from the Toronto Police Service. Rates are per resident, so areas with many visitors and few residents read high.