Everything here comes from public records: City of Toronto open data, TRCA and Statistics Canada, 15 sets in all. Each item leads to the record it comes from. Our sources
This house at a glance
Each score from 0 to 10: 0 needs attention, 10 all clear. Build potential is how much more you could add.
About 176 Huron St
176 Huron St is on a 80.1 m by 40.3 m lot on Huron St in Kensington-Chinatown. This lot is not covered by Toronto's city-wide zoning by-law 569-2013, so a by-law of the former city or borough most likely still applies. Toronto Building can confirm which one. The City lists the property on its Heritage Register. Listing does not stop changes inside, but the City must get 60 days' notice before any demolition.
The City has 19 records on this lot since 2000. That is more than at 99% of Toronto houses. In 2022, a building permit was filed: "Proposal to install 2 maglocks in third floor". Status: closed. In 2022, a building permit was filed: "Proposal for interior alterations to existig office space on the 3rd floor". Status: closed. In 2022, a building permit was filed: "Proposal to install 4 eletromagnetic locks on 4th and 5th floor (2 on each floor)4th floor: elevator lobby (402) and freight elevator lobby (428)5th floor…". Status: closed. An open permit means the City has not closed the file. Ask the seller whether the work was finished and passed its final inspection.
Within 300 m, 2 development applications are open (the tallest up to 31 storeys). Within 300 m, the Committee of Adjustment decided 14 minor variance applications in the last 10 years and approved 93%. Queen's Park station is a 11-minute walk.
Summary
What the City's records show on this house
- Building permit open since 2006ModerateFree check
- Zoning not in By-law 569-2013Moderate
- Heritage property: listedModerate
- 2 development applications open within 300 mLowFree check
Left unchecked, any of these can mean unexpected costs, trouble after closing, or plans you can't carry out. Found before you offer, they give you room to negotiate. The full report explains what each one means for this house and what to do next.
15 sets of public records, already checked for you. Searching each one yourself and working out what it means for you takes time. We have done that work: what matters about this house and lot, in plain English, in a few minutes.
What to find out first
3 things to check before you offer.
What to find out before an offer, the steps to take, what each costs and how long it takesUnlock
Open City files
How much in the City's records needs answers before an offer
- Building permit open since 2006
- No open orders or by-law investigations
- No work or applications in progress
What this part means for this house, in plain EnglishUnlock
Building permit open since 2006
ModerateCheck before you offerSee the open permit check for this house
What the record shows, what it means for you and what to doUnlock
What this means: Building permits before buying
City files on this lot
19 records on file, more than at 99% of Toronto houses (median 0 records).
| Date | Record | As the City filed it | In plain words | Status |
|---|---|---|---|---|
| 2022-12-12 | Building permit22 237972 | Proposal to install 2 maglocks in third floor | Closed | |
| 2022-07-05 | Building permit22 154296 | Proposal for interior alterations to existig office space on the 3rd floor. | Closed | |
| 2022-03-30 | Building permit22 128123 | Proposal to install 4 eletromagnetic locks on 4th and 5th floor (2 on each floor)4th floor: Elevator Lobby (402) and Freight Elevator Lobby (428)5th floor: Elevator Lobby (501A) and Freight Elevator Lobby (207) | Closed | |
| 2022-01-05 | Building permit21 200775 | Proposal for interior & exterior alterations to an existing office on the 4th & 5th floor levels for a new tenant (Social Media). Work includes restoring 4 window openings to the building face. | Closed | |
| 2016-08-05 | Building permit16 186771 | Proposal to install a 2 inch backflow prevention device. | Closed | |
| 2015-11-03 | Building permit15 232143 | Proposal for interior alterations to existing office space on the ground and basement levels - "Kindred" | Closed | |
| 2012-06-22 | Zoning review12 198447 PRZ | No description on file | Closed | |
| 2006-02-13 | Building permit06 106952 | Interior alterations to an existing office space on the 2nd floor. | Inspection | |
| 2001-11-14 | Building permit01 190873 | alter h.v.a.c. system on 4th and 5th floors. | Closed | |
| 2001-10-25 | Building permit01 189144 | interior alteration on third floor | Closed | |
| 2001-08-30 | Building permit01 173078 | Make interior alterations to portion of ground floor | Closed | |
| 2001-05-22 | Building permit01 122627 | Install fixtures: 4th fl: 2 showers, 2 b.t., 2 w.c., 3 w.b., 1 v.f.d., 1 bar sink, 1 w.t., 1 w.m.;5th fl: 2 w.c., 2 w.b., 1 2-compt. sink, 1 w.m., 1 v.f.d. cost incl. 352550 | Closed | |
| 2001-02-14 | Building permit00 352550 | make interior alterations to portion of 4th floor and entire 5th floor for new dwelling unit. edc/ms HISTORICAL. PICKED UP ON FEB.15/01 | Closed | |
| 2000-11-10 | Building permit00 347953 | alter alter hvac permit 00- 325294 by installing 16 baseboard heaters - ground floor tenant: Objectools see bp# 00-170063 | Closed | |
| 2000-10-11 | Zoning review00 344953 000 | No description on file | Closed | |
| 2000-08-23 | Building permit00 330771 | Install fixtures in basement: 3 w.c., 2 urinals, 4 w.b., 1 kitchen sink, 2 v.f.d. tenant: Objectools cost incl. 00 - 170063 | Closed | |
| 2000-08-23 | Building permit00 174749 | install fix. 1st fl:1 w.c., 2 urinals, 5 w.b., 1 kit. sink--cost incl. under file #00-170063 | Closed | |
| 2000-08-17 | Building permit00 170063 | make interior alterations to portion of basement, alter 1st floor. tenant: Objectools | Closed | |
| 2000-05-04 | Building permit00 146462 | Install fixtures on 2nd floor office: 3 w.c., 1 urinal, 2 w.b., 1 kitchen sink Tenant: U. of T. (Transfer Centre) cost incl. 135099 | Closed |
Restrictions
How much heritage, nature and site-specific rules limit changes to the house
- Zoning not in By-law 569-2013
- Heritage property: listed
What this part means for this house, in plain EnglishUnlock
Zoning not in By-law 569-2013
ModerateCheck before you offerWhat the record shows, what it means for you and what to doUnlock
Heritage property: listed
ModerateCheck before you offerWhat the record shows, what it means for you and what to doUnlock
What this means: Toronto Heritage RegisterWhat this means: Toronto zoning by address
Flood and erosion rules
How much of the lot lies in the areas TRCA regulates for flooding and erosion
- Outside the areas TRCA regulates
From TRCA's regulated areas only. Basement flooding, sewer back-up and the TRCA flood plain are not in this score yet; ask the seller and your insurer about water in the basement.
What this part means for this house, in plain EnglishUnlock
Build potential
How much more the rules allow on this lot, beyond what is on record
What this part means for this house, in plain EnglishUnlock
The lot and what the rules allow
- Zone
- —
- Height limit
- —
- Corner lot
- No
- Public lane
- None
- House footprint
- 522 m²
- Back yard
- 6.9 m
- Buildings on the lot
- 1
House and yards from the City's 3D Massing; a survey gives exact figures.
What you can build
Why, measured on this lot, and the most you could buildUnlock
Building nearby
How much neighbours are building and applying to change within 300 m
- 2 development applications open within 300 m, up to 31 storeys
- 19 suite and multiplex permits within 300 m in 10 years
- 14 minor variance decisions within 300 m, 93% approved
What this part means for this house, in plain EnglishUnlock
2 development applications open within 300 m
LowCheck if it appliesSee the next door check for this house
What the record shows, what it means for you and what to doUnlock
What this means: Committee of Adjustment
What the City allowed next door
Within 500 m, last 10 years: a guide if you plan to build or apply for something similar.
What neighbours have built and changed around you, and how the City decidedUnlock
Area safety
Police-reported crime in the neighbourhood against the Toronto median
- Lower than the Toronto median in 1 of 7 categories
- Theft over $5,000: 4.8 times the Toronto median
- Theft from vehicles: 4.5 times the Toronto median
- Assault: 3.2 times the Toronto median
- Robbery: 2.8 times the Toronto median
- Break and enter: 2.6 times the Toronto median
- Shootings: 2.1 times the Toronto median
Neighbourhood rates per 100,000 people from the Toronto Police Service, not this street.
What this part means for this house, in plain EnglishUnlock
Kensington-Chinatown neighbourhood
About the area, not this house.
2021 Census, against the median Toronto neighbourhood
Getting around and schools
- Queen's Park StationNearest station11 min walk
- College St at Spadina AveNearest TTC stop1 min walk
- College StNearest cycling route1 min walk
- Braemar College Private Secondary SchoolSchool2 min walk
- Lord Lansdowne Jr Sr & Da VinciSchool5 min walk
- Beverley & Subway Academy TwoSchool5 min walk
- Cornerstone Preparatory School - Main CampusSchool7 min walk
Police-reported crime, 2025, per 100,000 people
- Assaultcity median 636.32017.5
- Robberycity median 69.5193
- Shootingscity median 10.521.9
- Auto theftcity median 192.6118.4
- Theft over $5,000city median 46.1219.3
- Break and entercity median 172.8443
- Theft from vehiclescity median 188.1850.8
Ready emails
Copy and send as they are.
2 questions for the seller and your lawyer, written outUnlock
What we checked, and what the City's records don't cover
We checked 48 sets of City of Toronto, TRCA and Statistics Canada open data for this address, last updated Nov 27, 2026. Our records don't cover flooding history, ownership and mortgages, or the condition of the house: ask the seller and your insurer about water in the basement, your lawyer about title, and book a home inspection.
See every source and when we loaded it · Pre-offer checklist