HousePrecheckCheck an address

1710 Bayview AveMount Pleasant East, Toronto · City records before you offer

Commercial residential · CR 1.0 (c1.0; r1.0) SS2 (x613)8.0 × 38.3 m308 m²on Bayview Ave

1 thing to check before you offer, including building permit open since 2023
N10 m
8.0 m frontage38.3 m deep

Everything here comes from public records: City of Toronto open data, TRCA and Statistics Canada, 15 sets in all. Each item leads to the record it comes from. Our sources

This house at a glance

Each score from 0 to 10: 0 needs attention, 10 all clear. Build potential is how much more you could add.

About 1710 Bayview Ave

1710 Bayview Ave is on a 8 m by 38.3 m lot on Bayview Ave in Mount Pleasant East. The zoning is CR. A site-specific exception, 900.11.10(613), changes some of the usual rules for this address.

The City has 13 records on this lot since 2020. That is more than at 99% of Toronto houses. In 2025, a building permit was filed: "Proposal for sprinkler system to 9 storey mixed use building". Status: closed. In 2025, a building permit was filed: "Revision 01 - height increase; suite layout updates; see cover letter10 storey mixed-use building with 2 levels of below grade parking and a total of 216…". Status: closed. In 2025, a building permit was filed: "The subject building is required to be of non-combustible construction. except obc 3.1.5.5.(1) permits combustible components within exterior wall assembly…". Status: approved. An open permit means the City has not closed the file. Ask the seller whether the work was finished and passed its final inspection.

Within 300 m, 10 development applications are open (the tallest up to 45 storeys). Leaside station is a 3-minute walk, and the lot is in its Major Transit Station Area.

Summary

What the City's records show on this house

  • Building permit open since 2023ModerateFree check
  • Site-specific exception 900.11.10(613)Moderate
  • 10 development applications open within 300 mLowFree check
  • Yonge-Eglinton Secondary PlanLow
  • 1 Committee of Adjustment file on this lotLowFree check

Left unchecked, any of these can mean unexpected costs, trouble after closing, or plans you can't carry out. Found before you offer, they give you room to negotiate. The full report explains what each one means for this house and what to do next.

Unlock the full report

15 sets of public records, already checked for you. Searching each one yourself and working out what it means for you takes time. We have done that work: what matters about this house and lot, in plain English, in a few minutes.

What to find out first

1 thing to check before you offer.

What to find out before an offer, the steps to take, what each costs and how long it takesUnlock

Check

Open City files

How much in the City's records needs answers before an offer

  • Building permit open since 2023
  • No open orders or by-law investigations
  • No work or applications in progress

What this part means for this house, in plain EnglishUnlock

  1. Building permit open since 2023

    ModerateCheck before you offer

    What the record shows, what it means for you and what to doUnlock

  2. 1 Committee of Adjustment file on this lot

    LowFor later, once you own it

    What the record shows, what it means for you and what to doUnlock

City files on this lot

13 records on file, more than at 99% of Toronto houses (median 0 records).

DateRecordAs the City filed itIn plain wordsStatus
2025-08-12Building permit
25 194227
Proposal for sprinkler system to 9 storey mixed use building.Closed
2025-08-12Building permit
22 183283
Revision 01 - Height increase; suite layout updates; see cover letter10 Storey mixed-use building with 2 levels of below grade parking and a total of 216 residential units are proposed, previously proposed ground floor retail space has been replaced by 12 live-work units fronting Bayview Avenue.Closed
2025-03-10Building permit
25 126687
The subject building is required to be of non-combustible construction. Except OBC 3.1.5.5.(1) permits combustible components within exterior wall assembly provided the the building is not more than 3 storeys high in an unsprinklered building or not more than 6 storeys high where the building is sprinklered and the exterior wall assembly is tested per the requirements of CAN/ULC-S134. It is proposed to utilize Alpolic FR ACM panel in underside of the breezeway ceiling located on the ground floor. The OBC does not address combustible ceiling components in the building exterior. It is proposed to treat the panel similar to an exterior wall assembly. Therefore, this alternative is proposed to highlight compliance with OBC 3.1.5.5.(1). The Alpolic FR ACM panel has been tested to CAN/ULC-S134.Approved
2025-03-06Minor variance
A0022/25NY
To alter the previously approved 9-storey mixed-use building, which is currently under construction. The variances are being requested to allow for a 0.3 metre increase in building height, to alter the permitted location of functional building elements on the roof and to reduce the supply of visitor parking. Cross-reference City of Toronto By-law No. 1184-2022 (Ontario Land Tribunal).Approved
2024-11-28Zoning review
24 244472 ZAP
No description on fileNotice Sent
2024-05-15Development application
24 149283 NNY 15 CD
Draft Plan of Condominum application for a 9-storey mid-rise with 197 residential condominium units being constructed atop two levels of underground parking comprising of 98 residential parking spaces and 21 visitor parking spaces. It also has ground floor retail space.Closed
2023-10-10Building permit
23 212479
This alternative solution proposal is to address the use of a modified two-stage fire alarm system in the building to belocated at 1710 Bayview AvenueApproved
2023-01-04Building permit
22 145439
Demolish existing dwelling for future redevelopmentPermit Issued
2022-08-28Building permit
22 196737
This alternative solution proposal is to permit hose connections to be located within exit stairwells on all above gradelevels above the first storey as opposed to locating hoses within the floor area. Additional hose cabinets will be locatedwithin the floor area where the permitted maximum hose travel distance of 33 m is exceeded, and in the parking belowgrade levels.Approved
2022-04-29Zoning review
20 153356 PRZ
No description on fileClosed
2021-05-06Zoning review
21 147244 PSP
No description on fileClosed
2021-04-28Development application
21 147244 NNY 15 SA
Site Plan Application submitted to permit a 9-storey, mid-rise, mixed-use development, containing 197 apartment units and groundfloor retail space. The proposed GFA is 16,452 sqm (16,020 sqm residential GFA and 432 sqm retail GFA). The SPA application is related to Zoning By-law Amendment (ZBA) application 20 153356 NNY 15 OZ, both of which were appealed to the Ontario Land Tribula (OLT). The OLT approved the ZBA application in June 30, 2022 (refer to OLT file OLT-22002414 and PL 210295). The revised SPA application (June 2022) reflects the plan before the OLT.Closed
2020-06-08Development application
20 153356 NNY 15 OZ
Resubmission to include 5 additional lots to the north and south of the subject site have been acquired by the Owner. The expanded subject site now includes the properties municipally known as 1710, 1712, 1714, 1716 and 1736 Bayview Avenue. The revised proposal continues to propose a 9-storey (31.5 metres including the mechanical penthouse) mid-rise development fronting onto Bayview Avenue. The overall site area has increased from 2,504.2 square metres to 3,974.2 square metres and the frontage on Bayview Avenue has increased from 65.7 metres to 103.4 metres. As a result, the gross floor area (¿GFA¿) has increased from 10,879 square metres to approximately 16,931 square metres, and the number of residential units has increased from 123 to 216. The previously proposed ground floor retail space has been replaced by 12 live-work units fronting Bayview Avenue. Previous proposal: Zoning By-law Amendment application for an 9-storey, 31.3 metre high mixed-use building totalling 10,879 square metres of gross floor area. The proposal consists of 123 dwelling units, retail at grade, and 77 parking spaces in a two-level underground parking garage. The proposed floor space index is 4.34 times the lot area. See Rental Housing Demolition application 20 153939 NNY 15 RH.Closed
Clear

Restrictions

How much heritage, nature and site-specific rules limit changes to the house

  • Site-specific exception 900.11.10(613)
  • No heritage listing or designation

What this part means for this house, in plain EnglishUnlock

  1. Site-specific exception 900.11.10(613)

    ModerateCheck if it applies

    What the record shows, what it means for you and what to doUnlock

  2. Yonge-Eglinton Secondary Plan

    LowFor later, once you own it

    What the record shows, what it means for you and what to doUnlock

If you want to change or build

What the site-specific rules mean for an addition, a garage or a rebuild.

Site-specific exception 900.11.10(613)

What the exception changes for this address, rule by ruleUnlock

Not on this lot

Flood and erosion rules

How much of the lot lies in the areas TRCA regulates for flooding and erosion

  • Outside the areas TRCA regulates

From TRCA's regulated areas only. Basement flooding, sewer back-up and the TRCA flood plain are not in this score yet; ask the seller and your insurer about water in the basement.

What this part means for this house, in plain EnglishUnlock

Little left to add

Build potential

How much more the rules allow on this lot, beyond what is on record

What this part means for this house, in plain EnglishUnlock

The lot and what the rules allow

N10 m
8.0 m frontage38.3 m deepon Bayview Ave
Zone
CR 1.0 (c1.0; r1.0) SS2 (x613)
Height limit
26 m
Corner lot
No
Public lane
None

House and yards from the City's 3D Massing; a survey gives exact figures.

What you can build

    Why, measured on this lot, and the most you could buildUnlock

    Busy

    Building nearby

    How much neighbours are building and applying to change within 300 m

    • 10 development applications open within 300 m, up to 45 storeys
    • In the Leaside station area
    • 13 suite and multiplex permits within 300 m in 10 years

    What this part means for this house, in plain EnglishUnlock

    1. 10 development applications open within 300 m

      LowCheck if it applies

      What the record shows, what it means for you and what to doUnlock

    What the City allowed next door

    Within 500 m, last 10 years: a guide if you plan to build or apply for something similar.

    What neighbours have built and changed around you, and how the City decidedUnlock

    Crime below median

    Area safety

    Police-reported crime in the neighbourhood against the Toronto median

    • Lower than the Toronto median in 4 of 6 categories

    Neighbourhood rates per 100,000 people from the Toronto Police Service, not this street.

    What this part means for this house, in plain EnglishUnlock

    Mount Pleasant East neighbourhood

    About the area, not this house.

    2021 Census, against the median Toronto neighbourhood

    Median household income (2020)$110,000median $84,500
    Households that own their home55%median 54%
    Population (2021)16,370median 16,813
    Homes built in 1960 or before52%median 29%
    Homes needing major repairs5%median 7%

    Getting around and schools

    • Leaside StationNearest station3 min walk
    • Bayview Ave at Soudan AveNearest TTC stop1 min walk
    • Broadway AveNearest cycling route8 min walk
    • Leaside High SchoolSchool7 min walk
    • Polaris Learning Centre SchoolSchool7 min walk
    • Maurice Cody Jr Public SchoolSchool8 min walk
    • Children's Garden Junior SchoolSchool8 min walk

    Police-reported crime, 2025, per 100,000 people

    • Assaultcity median 636.3336.5
    • Robberycity median 69.510.2
    • Auto theftcity median 192.6224.4
    • Theft over $5,000city median 46.145.9
    • Break and entercity median 172.8204
    • Theft from vehiclescity median 188.1107.1

    More about Mount Pleasant East

    Ready emails

    Copy and send as they are.

    2 questions for the seller and your lawyer, written outUnlock

    What we checked, and what the City's records don't cover

    We checked 48 sets of City of Toronto, TRCA and Statistics Canada open data for this address, last updated Nov 27, 2026. Our records don't cover flooding history, ownership and mortgages, or the condition of the house: ask the seller and your insurer about water in the basement, your lawyer about title, and book a home inspection.

    See every source and when we loaded it · Pre-offer checklist

    Something here not right?

    Screening tool based on City of Toronto and TRCA open data. Not a zoning review or legal opinion. Site-specific exceptions, amendments not yet in the open data, minor variances and other by-laws can change the answer. Confirm with a Preliminary Project Review or Zoning Certificate from Toronto Building before buying or designing.

    Scores calibrated on Toronto house lots on 2026-10-19; prices and sources checked on 2026-10-06. Contains information licensed under the Open Government Licence – Toronto. TRCA regulation limits © Toronto and Region Conservation Authority.

    Full pre-offer report · 1710 Bayview Ave

    1 thing to check at 1710 Bayview Ave before you offer

    • Building permit open since 2023Moderate
    • Site-specific exception 900.11.10(613)Moderate
    • 10 development applications open within 300 mLow
    • Yonge-Eglinton Secondary PlanLow
    • and 1 more

    The report explains what each one can cost you on this house and what to ask the seller or the City before you offer.

    $29 CAD one time · opens right away

    See a sample report

    Full refund within 30 days if the report left out or misstated a City record on the lot. Refund policy

    Also in the report

    • A PDF to forward to your agent and lawyer
    • What you can build on this lot, measured on it
    • Every line linked to the City record it comes from
    • 15 sets of public records, already searched and read for you
    • A clear list of the 6 steps to take before you offer, so nothing slips
    • What each of the 5 findings can cost you or stop you doing, in plain English
    • A two-minute summary of this house, and what to find out first before you offer
    • What the City allowed your neighbours, a guide if you plan to build or apply for something similar
    • We watch this address for 90 days. If anything changes in the City's records, we email you the same day
    • A short summary of each part: City files, restrictions, flood and erosion, build potential, building nearby, area safety

    By paying you agree to the terms of use and the refund policy. Payment by Stripe. The report opens right after payment, and we email you a link to it; your account is made from the email you pay with. A screening of public records, not a legal opinion or a home inspection.

    Flag an error

    What is not right?

    The problem

    The records come from the City's open data; we check each flag against them. Your email is used only to answer this.