Everything here comes from public records: City of Toronto open data, TRCA and Statistics Canada, 15 sets in all. Each item leads to the record it comes from. Our sources
This house at a glance
Each score from 0 to 10: 0 needs attention, 10 all clear. Build potential is how much more you could add.
About 170 Roehampton Ave
170 Roehampton Ave is on a 51.4 m by 61.2 m lot on Roehampton Ave in North Toronto. The zoning is R. A site-specific exception, 900.2.10(912), changes some of the usual rules for this address. The lot also fronts Redpath Ave.
The City has 18 records on this lot since 2002. That is more than at 99% of Toronto houses. In 2026, a building permit was filed: "Proposal to install two maglocks - doors p100b and p00b at the level p1". Status: permit issued. In 2026, a Committee of Adjustment application was filed: "To alter the development standards for the 50-storey mixed-use building (approved under site-specific zoning by-law 1133-2023) by permitting a non-residential…". Status: closed. In 2026, a building permit was filed: "Alternative solution application - for b.p. application 24 230010 bld 00 nb - standpipe system -omission of some fhcs in floor areas,and addition of fire hose…". Status: approved. 2 open permits mean the City has not closed the files. Ask the seller whether the work was finished and passed its final inspection.
Within 300 m, 29 development applications are open (the tallest up to 70 storeys). Within 300 m, the Committee of Adjustment decided 14 minor variance applications in the last 10 years and approved 100%. Mount Pleasant station is a 5-minute walk, and the lot is in its Major Transit Station Area.
Summary
What the City's records show on this house
- Work or applications in progressModerateFree check
- Cultural Heritage Evaluation Report requiredModerate
- Site-specific exception 900.2.10(912)Moderate
- 2 by-law investigations closed in the last two yearsLow
- No permit for a second unit on fileLowFree check
- The back yard may be too tight for a garden suiteLowFree check
- House demolished in 2024, no new house permit on fileLow
- 29 development applications open within 300 mLowFree check
- 6 City trees in front of this lotLowFree check
- Yonge-Eglinton Secondary PlanLow
- 1 Committee of Adjustment file on this lotLowFree check
Left unchecked, any of these can mean unexpected costs, trouble after closing, or plans you can't carry out. Found before you offer, they give you room to negotiate. The full report explains what each one means for this house and what to do next.
What the rules allow here: Multiplex up to 6 units
15 sets of public records, already checked for you. Searching each one yourself and working out what it means for you takes time. We have done that work: what matters about this house and lot, in plain English, in a few minutes.
What to find out first
2 things to check before you offer.
What to find out before an offer, the steps to take, what each costs and how long it takesUnlock
Open City files
How much in the City's records needs answers before an offer
- Work or applications in progress
- 2 by-law investigations closed in the last two years
- No open orders or by-law investigations
What this part means for this house, in plain EnglishUnlock
Work or applications in progress
ModerateCheck before you offerSee the open permit check for this house
What the record shows, what it means for you and what to doUnlock
2 by-law investigations closed in the last two years
LowCheck if it appliesWhat the record shows, what it means for you and what to doUnlock
No permit for a second unit on file
LowCheck if it appliesSee the basement apartment check for this house
What the record shows, what it means for you and what to doUnlock
1 Committee of Adjustment file on this lot
LowFor later, once you own itSee the next door check for this house
What the record shows, what it means for you and what to doUnlock
What this means: Toronto zoning by addressWhat this means: Building permits before buyingWhat this means: Committee of Adjustment
City files on this lot
18 records on file, more than at 99% of Toronto houses (median 0 records).
| Date | Record | As the City filed it | In plain words | Status |
|---|---|---|---|---|
| 2026-10-14 | Building permit26 253333 | Proposal to install two Maglocks - doors P100b and P00b at the level P1. | Permit Issued | |
| 2026-04-01 | Minor varianceA0122/26TEY | To alter the development standards for the 50-storey mixed-use building (approved under Site-Specific Zoning By-law 1133-2023) by permitting a non-residential use (eating establishment/take-out eating establishment with an outdoor patio abutting Redpath Avenue) at-grade and increasing the total number of small vehicle parking spaces to 8 parking spaces. This building will contain 599 residential dwelling units including 15 rental replacement units. | Approved | |
| 2026-03-16 | Building permit26 130051 | Alternative Solution Application - For B.P. Application 24 230010 BLD 00 NB - Standpipe System -Omission of some FHCs in floor areas,and addition of Fire Hose connections inside exit stair shafts. | Approved | |
| 2026-02-27 | By-law investigation26 122625 PRS 00 IR | Property Standards | Closed | |
| 2025-10-18 | By-law investigation25 241753 PRS 00 IR | Property Standards | Closed | |
| 2025-01-29 | Building permit25 230010 | Deferred Fees from folder 24 230010 (RSN-5532149) ZoningProcess RSN 75965431 | Open | |
| 2024-11-28 | Zoning review22 166544 PSP | No description on file | Closed | |
| 2024-10-31 | Building permit24 230010 | Part Permit - Construction of new 50-storey Purpose-Built Rental (PBR) Residential Building, with 599 dwelling units, 8-storey podium and 2-level underground parking garage. | Superseded | |
| 2024-08-01 | Building permit24 175148 | Demolition of existing 7-Storey Residential Building with 53 existing dwelling units and 1 Underground Parking Level to allow for construction of new 50-Storey Residential Building with 2.5 Underground Parking Levels | Closed | |
| 2022-07-05 | Zoning review22 166545 POZ | No description on file | Closed | |
| 2022-06-22 | Development application22 166545 STE 12 OZ | Rezoning Application for a 49-storey residential building having 597 dwelling units and a residential gross floor area of 38,134 square metres | Closed | |
| 2022-06-22 | Development application22 166544 STE 12 SA | Site Plan Application for a 50-storey residential building having 598 dwelling units (including 15 replacement rental dwelling units). | Closed | |
| 2017-06-05 | Building permit17 155454 | Interior alterations to unit 103 | Cancelled | |
| 2016-11-10 | Building permit16 236168 | Existing balcony and slab repairs and replacement of the existing guardrails. | Closed | |
| 2011-07-07 | Building permit11 201332 | Proposal to install 1 backflow prevention device in an existing residential condo. | Closed | |
| 2004-04-14 | Building permit04 119419 | Existing parking garage roof slab repairs.site plans to follow. | Closed | |
| 2002-05-06 | Zoning review02 133202 ZPU | No description on file | Closed | |
| 2002-02-04 | Zoning review02 107743 ZPU | No description on file | Closed |
Restrictions
How much heritage, nature and site-specific rules limit changes to the house
- Cultural Heritage Evaluation Report required
- Site-specific exception 900.2.10(912)
What this part means for this house, in plain EnglishUnlock
Cultural Heritage Evaluation Report required
ModerateCheck before you offerWhat the record shows, what it means for you and what to doUnlock
Site-specific exception 900.2.10(912)
ModerateCheck if it appliesWhat the record shows, what it means for you and what to doUnlock
6 City trees in front of this lot
LowFor later, once you own itSee the tree permit check for this house
What the record shows, what it means for you and what to doUnlock
Yonge-Eglinton Secondary Plan
LowFor later, once you own itWhat the record shows, what it means for you and what to doUnlock
What this means: Toronto Heritage Register
If you want to change or build
What the site-specific rules mean for an addition, a garage or a rebuild.
Site-specific exception 900.2.10(912)
What the exception changes for this address, rule by ruleUnlock
Flood and erosion rules
How much of the lot lies in the areas TRCA regulates for flooding and erosion
- Outside the areas TRCA regulates
From TRCA's regulated areas only. Basement flooding, sewer back-up and the TRCA flood plain are not in this score yet; ask the seller and your insurer about water in the basement.
What this part means for this house, in plain EnglishUnlock
Build potential
How much more the rules allow on this lot, beyond what is on record
- Multiplex up to 6 units: likely fits
- Garden suite: needs a closer look
- Secondary suite: likely fits
What this part means for this house, in plain EnglishUnlock
The back yard may be too tight for a garden suite
LowCheck if it appliesSee the garden suite check for this house
What the record shows, what it means for you and what to doUnlock
Multiplex up to 6 units
LowFor later, once you own itWhat the record shows, what it means for you and what to doUnlock
The lot and what the rules allow
- Zone
- R (d2.0) (x912)
- Height limit
- 38 m
- Corner lot
- Yes, also on Redpath Ave
- Public lane
- None
- New house permit
- None since 2000
House and yards from the City's 3D Massing; a survey gives exact figures.
What you can build
Why, measured on this lot, and the most you could buildUnlock
Building nearby
How much neighbours are building and applying to change within 300 m
- 29 development applications open within 300 m, up to 70 storeys
- In the Eglinton station area
- 14 minor variance decisions within 300 m, 100% approved
What this part means for this house, in plain EnglishUnlock
29 development applications open within 300 m
LowCheck if it appliesSee the next door check for this house
What the record shows, what it means for you and what to doUnlock
What the City allowed next door
Within 500 m, last 10 years: a guide if you plan to build or apply for something similar.
What neighbours have built and changed around you, and how the City decidedUnlock
Area safety
Police-reported crime in the neighbourhood against the Toronto median
- Lower than the Toronto median in 5 of 6 categories
Neighbourhood rates per 100,000 people from the Toronto Police Service, not this street.
What this part means for this house, in plain EnglishUnlock
North Toronto neighbourhood
About the area, not this house.
2021 Census, against the median Toronto neighbourhood
Getting around and schools
- Mount Pleasant StationNearest station5 min walk
- Eglinton Ave East at Redpath AveNearest TTC stop3 min walk
- Broadway AveNearest cycling route2 min walk
- Willowdale High SchoolSchool2 min walk
- CareerquestSchool3 min walk
- North Toronto Collegiate InstituteSchool4 min walk
- Eglinton Linc and Esl CentreSchool4 min walk
Police-reported crime, 2025, per 100,000 people
- Assaultcity median 636.3626.8
- Robberycity median 69.553.4
- Auto theftcity median 192.668
- Theft over $5,000city median 46.124.3
- Break and entercity median 172.8174.9
- Theft from vehiclescity median 188.163.2
Ready emails
Copy and send as they are.
3 questions for the seller and your lawyer, written outUnlock
What we checked, and what the City's records don't cover
We checked 48 sets of City of Toronto, TRCA and Statistics Canada open data for this address, last updated Nov 27, 2026. Our records don't cover flooding history, ownership and mortgages, or the condition of the house: ask the seller and your insurer about water in the basement, your lawyer about title, and book a home inspection.
See every source and when we loaded it · Pre-offer checklist