HousePrecheckCheck an address

169 Shaw StTrinity-Bellwoods, Toronto · City records before you offer

Residential · R (d1.0) (x806)≈ 8.6 × 36.7 m243 m²on Shaw Stbacks onto Ln E Shaw S Lobb

2 things to check before you offer, including 3 building permits open, the oldest since 2001
N10 m
≈ 8.6 m frontage≈ 36.7 m deepirregular lot, estimated

Everything here comes from public records: City of Toronto open data, TRCA and Statistics Canada, 15 sets in all. Each item leads to the record it comes from. Our sources

This house at a glance

Each score from 0 to 10: 0 needs attention, 10 all clear. Build potential is how much more you could add.

About 169 Shaw St

169 Shaw St is on a 8.6 m by 36.7 m lot on Shaw St in Trinity-Bellwoods. The zoning is R. A site-specific exception, 900.2.10(806), changes some of the usual rules for this address.

The City has 18 records on this lot since 2001. That is more than at 99% of Toronto houses. In 2023, a Committee of Adjustment application was filed: "To construct a new two-storey ancillary building (containing an extension of the existing residential care facility), and a new one-storey ancillary building…". Status: closed. In 2019, a building permit was filed: "Construct interior alterations due to damages". Status: closed. In 2018, a building permit was filed: "Proposal to install new sprinklers througout the existing group home". Status: inspection. 3 open permits mean the City has not closed the files. Ask the seller whether the work was finished and passed its final inspection.

No development applications are open within 300 m. The nearest TTC stop is Queen St West at Shaw St, a 3-minute walk.

Summary

What the City's records show on this house

  • 3 building permits open, the oldest since 2001ModerateFree check
  • Work or applications in progressModerateFree check
  • Site-specific exception 900.2.10(806)Moderate
  • Multi-tenant (rooming) house licence: InactiveLow
  • No permit for a second unit on fileLowFree check
  • 5 Committee of Adjustment files on this lotLowFree check

Left unchecked, any of these can mean unexpected costs, trouble after closing, or plans you can't carry out. Found before you offer, they give you room to negotiate. The full report explains what each one means for this house and what to do next.

What the rules allow here: Multiplex up to 6 units · Garden suite · Laneway suite

Unlock the full report

15 sets of public records, already checked for you. Searching each one yourself and working out what it means for you takes time. We have done that work: what matters about this house and lot, in plain English, in a few minutes.

What to find out first

2 things to check before you offer.

What to find out before an offer, the steps to take, what each costs and how long it takesUnlock

Check carefully

Open City files

How much in the City's records needs answers before an offer

  • 3 building permits open, the oldest since 2001
  • Work or applications in progress
  • Multi-tenant (rooming) house licence: Inactive

What this part means for this house, in plain EnglishUnlock

  1. 3 building permits open, the oldest since 2001

    ModerateCheck before you offer

    What the record shows, what it means for you and what to doUnlock

  2. Work or applications in progress

    ModerateCheck before you offer

    What the record shows, what it means for you and what to doUnlock

  3. Multi-tenant (rooming) house licence: Inactive

    LowCheck if it applies

    What the record shows, what it means for you and what to doUnlock

  4. No permit for a second unit on file

    LowCheck if it applies

    What the record shows, what it means for you and what to doUnlock

  5. 5 Committee of Adjustment files on this lot

    LowFor later, once you own it

    What the record shows, what it means for you and what to doUnlock

City files on this lot

18 records on file, more than at 99% of Toronto houses (median 0 records).

DateRecordAs the City filed itIn plain wordsStatus
2023-11-29Minor variance
A0862/23TEY
To construct a new two-storey ancillary building (containing an extension of the existing residential care facility), and a new one-storey ancillary building (storage shed) in the rear yard of the existing three-storey residential care facility. The two detached garages in the rear yard will be demolished.Approved
2023-04-28Zoning review
23 139102 ZAP
No description on fileClosed
2019-02-26Building permit
19 110863
Construct interior alterations due to damagesClosed
2018-03-12Building permit
18 118155
Proposal to install new sprinklers througout the existing group home.Inspection
2013-08-14Minor variance
A0323/13TEY
To convert the existing detached rear garage into a programming space for the residential care facility located in the main building.Approved
2012-11-08Zoning review
12 276081 ZZC
No description on fileCancelled
2012-11-08Zoning review
12 276075 000
No description on fileCancelled
2009-09-10Building permit
09 156396
Proposed 2 decks (repair) in front yard of existing group homeClosed
2002-11-21Building permit
02 187302
Make interior alterations to third floor portion of the building to increase occupancy from 20 to 21 persons. see C of A decision.Closed
2002-10-23Minor variance
A0501/02TEY
The applicant is seeking permission to increase the occupancy number of the existing Residential Care Facility from 20 to 21 persons.Approved
2002-09-27Building permit
02 162209
install fixtures on 3rd floor: 2 wc, 2 wb, 2 btClosed - Dormant
2002-05-29Minor variance
A0242/02TEY
This application also includes No. 171 and 171 1/2 Shaw Street. Construct a rear addition at the third floor level (approximately 5.03 by 14.32 metres) of the existing Residential Care Facility, in order to increase the occupancy from 17 to 20 persons. Also, construct a fire escape having dimension sof 0.91 by 5.02 metres on the south elevation of the building.Approved
2002-04-03Building permit
02 123384
underpin portion of basement.Under Review
2002-03-06Zoning review
02 116272 ZPR
No description on fileClosed
2002-01-08Building permit
01 205230
Install fire alarm system: see BP 01-180762(not issued yet) also includes 171, & 171A Shaw St. Attention: L. CumberbatchInspection
2001-12-27Building permit
01 180762
Make alterations to row housing (row of 3) for residential care facility and construct one storey and basement addition at rear. see c. of a. decision <<HOLD>>HOLD FOR TORONTO FIRE SERVICES APPROVAL RE: LOCATION OF BALCONIESInspection
2001-06-19Minor variance
A340/01TO
This application also includes Nos. 171 and 171 1/2 Shaw Street. The proposal is to construct a ground floor rear addition, between the buildings municipally known as Nos. 171 and 171 1/2 Shaw Street, in conjunction with the use of the buildings as a residential care facility. The addition will measure 2.59 by 4.47 metres.Approved
2001-03-09Zoning review
01 117015 000
No description on fileClosed
Clear

Restrictions

How much heritage, nature and site-specific rules limit changes to the house

  • Site-specific exception 900.2.10(806)
  • No heritage listing or designation

What this part means for this house, in plain EnglishUnlock

  1. Site-specific exception 900.2.10(806)

    ModerateCheck if it applies

    What the record shows, what it means for you and what to doUnlock

If you want to change or build

What the site-specific rules mean for an addition, a garage or a rebuild.

Site-specific exception 900.2.10(806)

What the exception changes for this address, rule by ruleUnlock

Not on this lot

Flood and erosion rules

How much of the lot lies in the areas TRCA regulates for flooding and erosion

  • Outside the areas TRCA regulates

From TRCA's regulated areas only. Basement flooding, sewer back-up and the TRCA flood plain are not in this score yet; ask the seller and your insurer about water in the basement.

What this part means for this house, in plain EnglishUnlock

Good

Build potential

How much more the rules allow on this lot, beyond what is on record

  • Multiplex up to 6 units: likely fits
  • Garden suite: likely fits
  • Laneway suite: likely fits

What this part means for this house, in plain EnglishUnlock

  1. Multiplex up to 6 units

    LowFor later, once you own it

    What the record shows, what it means for you and what to doUnlock

  2. Garden suite

    LowFor later, once you own it

    What the record shows, what it means for you and what to doUnlock

  3. Laneway suite

    LowFor later, once you own it

    What the record shows, what it means for you and what to doUnlock

The lot and what the rules allow

N10 m
≈ 8.6 m frontage≈ 36.7 m deepon Shaw St
Zone
R (d1.0) (x806)
Height limit
11 m
Corner lot
No
Public lane
Ln E Shaw S Lobb, 8.5 m along it
New house permit
None since 2000
House footprint
83 m²
Back yard
19.5 m
Buildings on the lot
1

House and yards from the City's 3D Massing; a survey gives exact figures.

What you can build

Why, measured on this lot, and the most you could buildUnlock

Some

Building nearby

How much neighbours are building and applying to change within 300 m

  • 0 development applications within 300 m in 10 years, none open
  • In the King-Liberty station area
  • 22 suite and multiplex permits within 300 m in 10 years

What this part means for this house, in plain EnglishUnlock

What the City allowed next door

Within 500 m, last 10 years: a guide if you plan to build or apply for something similar.

What neighbours have built and changed around you, and how the City decidedUnlock

Crime near median

Area safety

Police-reported crime in the neighbourhood against the Toronto median

  • Lower than the Toronto median in 3 of 7 categories
  • Break and enter: 2.0 times the Toronto median
  • Theft over $5,000: 1.5 times the Toronto median

Neighbourhood rates per 100,000 people from the Toronto Police Service, not this street.

What this part means for this house, in plain EnglishUnlock

Trinity-Bellwoods neighbourhood

About the area, not this house.

2021 Census, against the median Toronto neighbourhood

Median household income (2020)$92,000median $84,500
Households that own their home56%median 54%
Population (2021)15,415median 16,813
Homes built in 1960 or before68%median 29%
Homes needing major repairs8%median 7%

Getting around and schools

  • Exhibition GO StationNearest station20 min walk
  • Queen St West at Shaw StNearest TTC stop3 min walk
  • Shaw StNearest cycling route1 min walk
  • Givins Shaw Jr Public SchoolSchool2 min walk
  • Discovering Minds Montessori SchoolSchool7 min walk
  • Charles G Fraser Jr Public SchoolSchool10 min walk
  • Ecole Elementaire Pierre Elliott TrudeauSchool11 min walk

Police-reported crime, 2025, per 100,000 people

  • Assaultcity median 636.3946.7
  • Robberycity median 69.558.4
  • Shootingscity median 10.55.8
  • Auto theftcity median 192.676
  • Theft over $5,000city median 46.170.1
  • Break and entercity median 172.8350.6
  • Theft from vehiclescity median 188.1280.5

More about Trinity-Bellwoods

Ready emails

Copy and send as they are.

5 questions for the seller and your lawyer, written outUnlock

What we checked, and what the City's records don't cover

We checked 48 sets of City of Toronto, TRCA and Statistics Canada open data for this address, last updated Nov 27, 2026. Our records don't cover flooding history, ownership and mortgages, or the condition of the house: ask the seller and your insurer about water in the basement, your lawyer about title, and book a home inspection.

See every source and when we loaded it · Pre-offer checklist

Something here not right?

Screening tool based on City of Toronto and TRCA open data. Not a zoning review or legal opinion. Site-specific exceptions, amendments not yet in the open data, minor variances and other by-laws can change the answer. Confirm with a Preliminary Project Review or Zoning Certificate from Toronto Building before buying or designing.

Scores calibrated on Toronto house lots on 2026-10-19; prices and sources checked on 2026-10-06. Contains information licensed under the Open Government Licence – Toronto. TRCA regulation limits © Toronto and Region Conservation Authority.

Full pre-offer report · 169 Shaw St

2 things to check at 169 Shaw St before you offer

  • 3 building permits open, the oldest since 2001Moderate
  • Work or applications in progressModerate
  • Site-specific exception 900.2.10(806)Moderate
  • Multi-tenant (rooming) house licence: InactiveLow
  • and 2 more

The report explains what each one can cost you on this house and what to ask the seller or the City before you offer.

$29 CAD one time · opens right away

See a sample report

Full refund within 30 days if the report left out or misstated a City record on the lot. Refund policy

Also in the report

  • A PDF to forward to your agent and lawyer
  • What you can build on this lot, measured on it
  • Every line linked to the City record it comes from
  • 15 sets of public records, already searched and read for you
  • A clear list of the 7 steps to take before you offer, so nothing slips
  • What each of the 6 findings can cost you or stop you doing, in plain English
  • A two-minute summary of this house, and what to find out first before you offer
  • What the City allowed your neighbours, a guide if you plan to build or apply for something similar
  • We watch this address for 90 days. If anything changes in the City's records, we email you the same day
  • A short summary of each part: City files, restrictions, flood and erosion, build potential, building nearby, area safety

By paying you agree to the terms of use and the refund policy. Payment by Stripe. The report opens right after payment, and we email you a link to it; your account is made from the email you pay with. A screening of public records, not a legal opinion or a home inspection.

Flag an error

What is not right?

The problem

The records come from the City's open data; we check each flag against them. Your email is used only to answer this.