Everything here comes from public records: City of Toronto open data, TRCA and Statistics Canada, 15 sets in all. Each item leads to the record it comes from. Our sources
This house at a glance
Each score from 0 to 10: 0 needs attention, 10 all clear. Build potential is how much more you could add.
About 166 Cottingham St
166 Cottingham St is on a 8.8 m by 32.1 m lot on Cottingham St in Yonge-St.Clair. The zoning is R. A site-specific exception, 900.2.10(745), changes some of the usual rules for this address.
The City has 10 records on this lot since 2005. That is more than at 99% of Toronto houses. In 2020, a building permit was filed: "Proposed basement underpinning and interior alterations to existing semi-detached dwelling". Status: closed. In 2012, a building permit was filed: "Proposed reconstruction of existing front porch. existing single family dwelling". Status: closed. In 2012, a building permit was filed: "Proposal to install 1 backwater valve on the sanitary line of existing sfd-semi dwelling". Status: inspection. 2 open permits mean the City has not closed the files. Ask the seller whether the work was finished and passed its final inspection.
No development applications are open within 300 m. Summerhill station is a 9-minute walk, and the lot is in its Major Transit Station Area.
Summary
What the City's records show on this house
- 2 building permits open, the oldest since 2012ModerateFree check
- Site-specific exception 900.2.10(745)Moderate
- No permit for a second unit on fileLowFree check
- 1 City tree in front of this lotLowFree check
- Yonge-St. Clair Secondary PlanLow
- 1 Committee of Adjustment file on this lotLowFree check
Left unchecked, any of these can mean unexpected costs, trouble after closing, or plans you can't carry out. Found before you offer, they give you room to negotiate. The full report explains what each one means for this house and what to do next.
What the rules allow here: Multiplex up to 6 units
15 sets of public records, already checked for you. Searching each one yourself and working out what it means for you takes time. We have done that work: what matters about this house and lot, in plain English, in a few minutes.
What to find out first
1 thing to check before you offer.
What to find out before an offer, the steps to take, what each costs and how long it takesUnlock
Open City files
How much in the City's records needs answers before an offer
- 2 building permits open, the oldest since 2012
- No open orders or by-law investigations
- No work or applications in progress
What this part means for this house, in plain EnglishUnlock
2 building permits open, the oldest since 2012
ModerateCheck before you offerSee the open permit check for this house
What the record shows, what it means for you and what to doUnlock
No permit for a second unit on file
LowCheck if it appliesSee the basement apartment check for this house
What the record shows, what it means for you and what to doUnlock
1 Committee of Adjustment file on this lot
LowFor later, once you own itSee the next door check for this house
What the record shows, what it means for you and what to doUnlock
What this means: Toronto zoning by addressWhat this means: Building permits before buyingWhat this means: Committee of Adjustment
City files on this lot
10 records on file, more than at 99% of Toronto houses (median 0 records).
| Date | Record | As the City filed it | In plain words | Status |
|---|---|---|---|---|
| 2020-01-16 | Building permit19 258596 | Proposed basement underpinning and interior alterations to existing semi-detached dwelling. | Closed | |
| 2012-04-04 | Building permit12 143207 | Proposed reconstruction of existing front porch. Existing single family dwelling. | Closed | |
| 2012-02-24 | Building permit12 127491 | Proposal to install 1 backwater valve on the sanitary line of existing SFD-semi dwelling. | Inspection | |
| 2012-02-24 | Building permit12 119285 | Proposed replacement of two bay windows at front and enlarging existing window on the side. | Inspection | |
| 2008-02-07 | Zoning review08 109652 ZPR | No description on file | Closed | |
| 2007-11-20 | Building permit07 269110 | Revision to exisitng building permit - revision to window openings on rear of existing dwelling . Interior alterations at the ground floor and second floor | Closed | |
| 2006-08-02 | Building permit06 162913 | To construct a deck at the rear | Closed | |
| 2006-03-08 | Building permit06 113372 | To construct a one storey addition at the rear and interior alterations | Closed | |
| 2006-02-08 | Minor varianceA0988/05TEY | The applicant is seeking relief from the provisions of Zoning By-law No. 438-86, as amended, to maintain as constructed an one storey addition to a one storey sunroom at the rear of a two and a half storey semi-detached house. The addition extends north approximately 0.86 metres and 0.37 metres west from the sunroom. | Approved | |
| 2005-12-12 | Zoning review05 209014 ZPR | No description on file | Closed |
Restrictions
How much heritage, nature and site-specific rules limit changes to the house
- Site-specific exception 900.2.10(745)
- No heritage listing or designation
What this part means for this house, in plain EnglishUnlock
Site-specific exception 900.2.10(745)
ModerateCheck if it appliesWhat the record shows, what it means for you and what to doUnlock
1 City tree in front of this lot
LowFor later, once you own itSee the tree permit check for this house
What the record shows, what it means for you and what to doUnlock
Yonge-St. Clair Secondary Plan
LowFor later, once you own itWhat the record shows, what it means for you and what to doUnlock
If you want to change or build
What the site-specific rules mean for an addition, a garage or a rebuild.
Site-specific exception 900.2.10(745)
What the exception changes for this address, rule by ruleUnlock
Flood and erosion rules
How much of the lot lies in the areas TRCA regulates for flooding and erosion
- Outside the areas TRCA regulates
From TRCA's regulated areas only. Basement flooding, sewer back-up and the TRCA flood plain are not in this score yet; ask the seller and your insurer about water in the basement.
What this part means for this house, in plain EnglishUnlock
Build potential
How much more the rules allow on this lot, beyond what is on record
- Multiplex up to 6 units: likely fits
- Secondary suite: likely fits
- No public lane, so no laneway suite
What this part means for this house, in plain EnglishUnlock
Multiplex up to 6 units
LowFor later, once you own itWhat the record shows, what it means for you and what to doUnlock
The lot and what the rules allow
- Zone
- R (d1.0) (x745)
- Height limit
- 12 m
- Corner lot
- No
- Public lane
- None
- New house permit
- None since 2000
- House footprint
- 131 m²
- Back yard
- 5.9 m
- Buildings on the lot
- 1
House and yards from the City's 3D Massing; a survey gives exact figures.
What you can build
Why, measured on this lot, and the most you could buildUnlock
Building nearby
How much neighbours are building and applying to change within 300 m
- 5 development applications within 300 m in 10 years, none open
- In the Summerhill station area
- 9 suite and multiplex permits within 300 m in 10 years
What this part means for this house, in plain EnglishUnlock
What the City allowed next door
Within 500 m, last 10 years: a guide if you plan to build or apply for something similar.
What neighbours have built and changed around you, and how the City decidedUnlock
Area safety
Police-reported crime in the neighbourhood against the Toronto median
- Lower than the Toronto median in 5 of 6 categories
- Break and enter: 2.2 times the Toronto median
Neighbourhood rates per 100,000 people from the Toronto Police Service, not this street.
What this part means for this house, in plain EnglishUnlock
Yonge-St.Clair neighbourhood
About the area, not this house.
2021 Census, against the median Toronto neighbourhood
Getting around and schools
- Summerhill StationNearest station9 min walk
- Avenue Rd at Cottingham StNearest TTC stop1 min walk
- Poplar Plains RdNearest cycling route6 min walk
- Cottingham Jr Public SchoolSchool3 min walk
- De Lasalle College SchoolSchool4 min walk
- The Mabin SchoolSchool7 min walk
- Brown Jr Public SchoolSchool10 min walk
Police-reported crime, 2025, per 100,000 people
- Assaultcity median 636.3270.8
- Robberycity median 69.525.8
- Auto theftcity median 192.664.5
- Theft over $5,000city median 46.132.2
- Break and entercity median 172.8374
- Theft from vehiclescity median 188.1116.1
Ready emails
Copy and send as they are.
2 questions for the seller and your lawyer, written outUnlock
What we checked, and what the City's records don't cover
We checked 48 sets of City of Toronto, TRCA and Statistics Canada open data for this address, last updated Nov 27, 2026. Our records don't cover flooding history, ownership and mortgages, or the condition of the house: ask the seller and your insurer about water in the basement, your lawyer about title, and book a home inspection.
See every source and when we loaded it · Pre-offer checklist