HousePrecheckCheck an address

165 Balliol StToronto · zoning, lot size and permit records

Residential · R (d0.6) (x913)30.4 × 59.2 m1,784 m²on Balliol St

Not a single house

A rental apartment building

The City's RentSafeTO program evaluates this building as a rental apartment building (three storeys and ten units or more). Build options for a house do not apply.

Looking at a house nearby? What this means for you

  • 4 storeys, 48 rental units, built 1968More people, cars and deliveries than a street of houses alone. A tall building also shades the lots to its north.
  • 12 development applications open within 300 m, up to 46 storeysNew buildings may go up around here in the next years. More change nearby than at 100% of Toronto houses.
  • City upkeep score: 93 out of 100RentSafeTO rates common areas, building systems and records. A low score can show from the street.
  • Major Transit Station Area: DavisvilleThe City plans more homes around the station: good for transit, and more building over time.

Want to check this building before you buy?

We are building checks for apartment buildings. Leave your email and we will tell you when it is ready.

N20 m
30.4 m frontage59.2 m deep

Before you offer

From the City's records on this lot. Each item says what it means for a purchase and how to confirm it.

  • 4 by-law investigations closed in the last two years

    Good to know

    Closed files (Order Issued Property Standards, Property Standards): 26 249563 PRS 00 IR (Property Standards, 2026); 26 248766 PRS 00 IR (Property Standards, 2026); 25 265584 PRS 00 IV (Order Issued Property Standards: Height of the guard for the exit stairs are less than..., 2025); and 1 more.

    What it means. Someone raised an issue here and the City closed the file. Ask the seller what it was about.

    City of Toronto, Toronto Building orders and Municipal Licensing and Standards investigations
  • 12 development applications open within 300 m

    Good to know

    12 rezoning, site plan, subdivision or condominium applications within 300 m, submitted in the last 10 years, are not closed yet, including buildings of up to 46 storeys. They are listed under Around this lot.

    What it means. New buildings nearby can change views, sunlight, traffic and construction noise for years.

    How to confirm. Each application, its drawings and its status are in the Application Information Centre. Details

    City of Toronto, Development Applications
  • Rental building evaluation: 93 out of 100

    Good to know

    The City's RentSafeTO program evaluated this rental building in 2025 (4 storeys, 48 units, built 1968).

    What it means. The score covers common areas, building systems and records. Read the evaluation details for the items that scored low.

    How to confirm. The City's RentSafeTO page has the evaluation results and any open orders for the building. Details

    City of Toronto, RentSafeTO Apartment Building Evaluations

Not in these records

  • Flooding history. Past basement flooding and insurance claims on this house are not published. Ask the seller directly and ask your insurer before you firm up the offer.
  • Ownership, mortgages and easements. Title is not open data. Your lawyer searches title after the offer; ask for the survey and any easements before.

History of this lot

5 records on file: more than at 93% of Toronto houses (median 0).

  • By-law investigation26 249563 PRS 00 IRClosed

    Property Standards

    Oct 5, 2026 · 165 BALLIOL ST
  • By-law investigation26 248766 PRS 00 IRClosed

    Property Standards

    Oct 3, 2026 · 165 BALLIOL ST
  • By-law investigation25 265584 PRS 00 IVClosed

    Order Issued Property Standards: Height of the guard for the exit stairs are less than 1,070 millimetres around landings.; Height of the guard for the exit stairs are less than 920 millimetres measured vertically to the top of the guard from a line drawn through the outside edges of; Required guard does not prevent the passage of a sphere having a diameter more than 100 millimetres.; Required handrails on stairs or ramps are less than 865mm or more than 965mm high; The guard is designed that a member, attachment or opening located between 140 millimetres and 900 millimetres above the level being protected facilitates climb

    Dec 9, 2025 · 165 BALLIOL ST
  • By-law investigation25 264205 PRS 00 IRClosed

    Property Standards

    Dec 9, 2025 · 165 BALLIOL ST
  • Building permit04 173428Closed

    Waterproof balconies, replace railings and repair balconies. Existing and proposed: Aparment Building.

    Sep 22, 2004 · 165 BALLIOL ST

Check before you build

  • Site-specific exception 900.2.10(913)

    Needs a closer look

    A Chapter 900 exception applies here, but its text was not found in the City's consolidation of the by-law. Read it before relying on the rest of this page.

    Zoning By-law 569-2013, Chapter 900
Exception 900.2.10(913)Check

The exception text was not found in the City's consolidation.

Lot facts

Area
1,784 m²
Frontage
30.4 m
Depth
59.2 m
Street
Balliol St
Corner lot
No
Public lane
None
House footprint
920 m²roof up to 19.9 m
Back yard
8.3 mhouse to rear lot line
Side yards
3.5 m and 3.7 mhouse to side lot lines
Buildings on the lot
2house, garage, sheds
Max height
38 m
Max lot coverage
—

House and yards are measured from the City's 3D Massing footprints, which are for illustration; a survey gives the exact figures.

  • Major Transit Station Area: Davisville. The lot is inside the Davisville Major Transit Station Area approved by the Province (Site and Area Specific Policy 722). Source
  • Yonge-Eglinton Secondary Plan. A Secondary Plan sets more detailed land use, height and density policies for this area. Source
  • Zone R (d0.6) (x913) (Residential). Chapter 10, section 10.10 of the by-law. Source
  • 5 City trees in front of this lot. The City's street tree inventory lists 5 trees at this address: maple, norway (43 cm), catalpa, northern (40 cm), maple, norway emerald queen (34 cm). Diameter is the trunk at breast height. Source

Around this lot

Minor variances approved
100%11 of 11 decisions
Garden suite permits
2
Laneway suite permits
0
Multiplex permits
6
Development applications
24

Within 300 m, last 10 years. 8 suite and multiplex permits: more than at 70% of Toronto houses (median 3). 11 variance decisions: no more than at most Toronto houses (median 19).

Recent variance decisions in the same zone

  • Minor varianceApproved

    To alter the existing two-storey detached dwelling (houseplex) by constructing a front basement walkout, and a front yard parking pad. Also, to convert the existing front integral garage into habitable space (one residential dwelling unit). There will be a total of four residential dwelling units on this lot (one unit within the basement level, two units on the ground level, and one unit on the second level).

    105 BELSIZE DR · Jul 8, 2026 · 342 m away
  • Minor varianceRefused

    To construct a new two-storey detached dwelling with a front integral garage, a covered front porch with stairs, and a rear basement walkout. The existing rear one-storey ancillary building (detached garage) will be demolished. There will be a total of two residential dwelling units on this lot (one unit within the basement level and one unit to occupy the first and second levels).

    11 OSWALD CRES · Apr 9, 2025 · 496 m away
  • Minor varianceRefused

    To construct a new two-storey detached dwelling with a front covered integral garage, a covered front porch with stairs, and a rear basement walkout. There will be a total of two residential dwelling units on this lot (one unit within the basement level and one unit to occupy the first and second levels).

    11 OSWALD CRES · Apr 9, 2025 · 496 m away
  • Minor varianceApproved

    To alter the existing two-and-one-half-storey detached dwelling by constructing front and rear three-storey additions (a portion of the rear addition will be above the existing two-storey), a rear basement walkout, and rear ground and second floor decks with stairs. There will be a total of three residential dwelling units (triplex) (one dwelling unit within the basement, one dwelling unit on the first level, and one dwelling unit to occupy the second and third levels) on this lot.

    103 BELSIZE DR · Dec 4, 2024 · 341 m away
  • Minor varianceApproved

    To alter the existing two-and-one-half-storey detached dwelling by constructing a rear third storey addition.

    12 WILFRID AVE · Jun 5, 2024 · 426 m away

Latest activity nearby

  • Consent (lot split)Pending

    To obtain consent to sever the property into two stratified lots and to create new easements/rights-of-way. Also, to maintain existing easements/rights-of-way.

    265 BALLIOL ST · Dec 2, 2026 · 295 m away
  • Building permit

    Installation of two mag-locks and associated equipment on exit doors serving the basement.

    268 MERTON ST · Nov 10, 2026 · 269 m away
  • Zoning review

    Closed

    119 MERTON ST · Nov 3, 2026 · 176 m away
  • Zoning review

    Notice Sent

    275 MERTON ST · Oct 27, 2026 · 296 m away
  • Building permit

    Proposal to erect a temporary air supported structure on an existing tennis court area. Tent to be in place from October 13, 2026 to April 13, 2027

    185 BALLIOL ST · Oct 13, 2026 · 41 m away
  • Building permit

    Targeted waterproofing renewal at the parking garage roof slab, including localized concrete repairs.

    221 BALLIOL ST · Sep 11, 2026 · 163 m away
  • Building permit

    Proposed concrete repairs at balcony slabs, shear walls, columns, end walls, roof parapet, exposed building floor slab edges, and entrance canopy; Replacement of balcony guards; Targeted masonry repairs and installation of an elastomeric coating/paint for the exterior walls; General replacement of exterior joint sealants (excluding window and balcony door perimeter joints).

    265 BALLIOL ST · Aug 31, 2026 · 295 m away
  • Building permit

    standpipe risers located within the contiguous scissor stairs

    140 MERTON ST · Aug 28, 2026 · 66 m away
  • Consent (lot split)Approved

    To obtain consent to sever the property into two residential lots and to maintain existing easements/rights-of-way.

    186-188 MILLWOOD RD · Aug 19, 2026 · 283 m away
  • Building permit

    Replace the failed caulking, failed tuck pointing and damaged bricks for facade restoration

    77 DAVISVILLE AVE · Aug 4, 2026 · 203 m away

Neighbourhood: South Eglinton-Davisville

About the area around the lot, not the lot itself.

Nearest station
Davisville Station7 min walk
Nearest TTC stop
Davisville Ave at Pailton Cres2 min walk
Nearest cycling route
Kay Gardiner Beltline TrlMulti-Use Trail, 3 min walk
Nearest traffic count
11,149 vehicles in 14 hDavisville Ave / Pailton Cres, 160 m away, Feb 12, 2026
Serious collisions within 500 m
52021–2026, killed or seriously injured: 2 fatal, 3 with pedestrians, 0 with cyclists
Parks
Kay Gardner Beltline Park2 min walk
June Rowlands Park4 min walk
Glebe Manor Square6 min walk

Schools within 1 km

  • DAVISVILLE & SPECTRUM SCHOOL English Public 5 min walk
  • GREENWOOD COLLEGE SCHOOL Private 8 min walk
  • TORONTO PREP SCHOOL Private 8 min walk
  • THE STUDY ACADEMY SCHOOL Private 9 min walk
  • MANOR MONTESSORI - DE SAVERY SITE Private 9 min walk
  • THE STUDY ACADEMY Private 10 min walk

Being near a school does not mean the lot is in its catchment; check with the board.

2021 Census

FigureSouth Eglinton-DavisvilleMedian neighbourhood
Median household income (2020)$80,000$84,500
Households that own their home30%54%
Population (2021)22,73516,813
Homes built in 1960 or before11%29%
Homes needing major repairs3%7%

Statistics Canada 2021 Census, 25% sample, by City of Toronto neighbourhood.

Police-reported crime, 2025

Per 100,000 peopleSouth Eglinton-DavisvilleCity median
Assault436636.3
Robbery24.269.5
Auto theft58.8192.6
Theft over $5,00020.846.1
Break and enter128172.8
Theft from vehicles100.3188.1

Neighbourhood totals from the Toronto Police Service. Rates are per resident, so areas with many visitors and few residents read high.

Something here not right?

Sources

  • Building permits on this lot since 2000: Permits issued or applied for since about 2000, with status.
  • Committee of Adjustment files since 2001: Minor variances and consents (lot splits) on this lot and nearby, with decisions.
  • Development applications: Rezoning, site plan, subdivision and condominium applications.
  • Preliminary zoning reviews: Zoning reviews requested before a permit or variance application.
  • Zoning and overlays: Zoning By-law 569-2013 zone, height, coverage, policy area, parking, rooming house, priority retail street and downtown setback overlays.
  • Lot boundary, street and lane: Lot polygon, its addresses, the street it fronts, corner and public lane contact, with frontage and depth measured from the boundary; City of Toronto land in City use, which is not a home.
  • House and yards: Footprint and roof height of the house and other buildings, and the yard behind the house, from the City's 3D Massing (updated yearly, illustrative).
  • City trees in front of the lot: City-owned trees on the street allowance at this address, with species and trunk diameter. Private trees on the lot are not in open data.
  • Heritage: Heritage Register (listed and designated properties), Official Plan Amendment 720 properties and properties removed from the Register under the 2022 two-year limit.
  • TRCA regulated area: Valleys, floodplains, shorelines and wetlands regulated by the Toronto and Region Conservation Authority.
  • Ravines and natural features: Ravine and Natural Feature Protection area (Chapter 658, map last published 2019), Natural Heritage System and Environmentally Significant Areas.
  • Official Plan policies: Site and Area Specific Policies, Secondary Plans and Major Transit Station Areas covering the lot.
  • Rooming houses, short-term rentals and rental buildings: Multi-tenant house licences, short-term rental registrations and RentSafeTO evaluations at this address.
  • Neighbourhood context: Neighbourhood, 2021 Census figures, police-reported crime rates, schools, parks, TTC stops, cycling routes, serious collisions and traffic counts nearby. Area context only, not a finding about the lot.
  • Orders and by-law investigations: Outstanding Toronto Building orders, and by-law investigations open now or closed in the last two years. Fire and Public Health orders and older closed files are not published.
  • Address points: loaded Nov 29, 2026, published Nov 27, 2026
  • Toronto Building orders: loaded Nov 28, 2026, published Nov 27, 2026
  • Neighbourhood Profiles, 2021 Census: loaded Oct 14, 2026, published Oct 6, 2023
  • Street centrelines: loaded Nov 29, 2026, published Nov 27, 2026
  • City-owned land: loaded Nov 29, 2026, published Nov 23, 2026
  • Committee of Adjustment open applications: loaded Nov 29, 2026, published Nov 28, 2026
  • Committee of Adjustment decisions: loaded Nov 29, 2026, published Nov 28, 2026
  • Committee of Adjustment decisions 2001-2016: loaded Oct 14, 2026, published Feb 20, 2026
  • Collisions with people killed or seriously injured (Toronto Police Service): loaded Nov 29, 2026, published Nov 28, 2026
  • Neighbourhood crime rates (Toronto Police Service): loaded Oct 14, 2026, published Feb 20, 2026
  • Cycling network: loaded Nov 22, 2026, published Nov 16, 2026
  • Development applications: loaded Nov 29, 2026, published Nov 29, 2026
  • Environmentally Significant Areas: loaded Oct 14, 2026, published Mar 16, 2026
  • Green spaces: loaded Nov 29, 2026, published Nov 24, 2026
  • Heritage register: loaded Oct 14, 2026, published Sep 1, 2026
  • Former heritage listings: loaded Oct 14, 2026, published Jul 3, 2025
  • Official Plan Amendment 720 heritage list: loaded Nov 29, 2026, published Nov 23, 2026
  • 3D Massing building footprints: loaded Oct 14, 2026, published Dec 2, 2025
  • By-law investigation addresses: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigation deficiencies: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigations: loaded Nov 29, 2026, published Nov 28, 2026
  • Major Transit Station Areas: loaded Oct 14, 2026, published Feb 3, 2026
  • Natural Heritage System: loaded Oct 14, 2026, published Mar 16, 2026
  • Neighbourhoods: loaded Oct 14, 2026, published Feb 20, 2026
  • Property boundaries: loaded Nov 27, 2026, published Nov 27, 2026
  • Active building permits: loaded Nov 29, 2026, published Nov 28, 2026
  • Cleared building permits: loaded Nov 29, 2026, published Nov 28, 2026
  • Cleared building permits 2000-2016: loaded Oct 14, 2026, published Jul 8, 2025
  • Preliminary zoning reviews: loaded Nov 29, 2026, published Nov 28, 2026
  • Ravine and natural feature protection: loaded Oct 14, 2026, published Jul 23, 2019
  • RentSafeTO evaluations: loaded Nov 29, 2026, published Nov 28, 2026
  • Multi-tenant house licences: loaded Nov 29, 2026, published Nov 28, 2026
  • Site and Area Specific Policies: loaded Oct 14, 2026, published Mar 16, 2026
  • School locations: loaded Oct 14, 2026, published May 27, 2026
  • Secondary Plans: loaded Oct 14, 2026, published Mar 16, 2026
  • Street trees: loaded Nov 29, 2026, published Nov 23, 2026
  • Short-term rental registrations: loaded Nov 29, 2026, published Nov 28, 2026
  • Traffic counts at intersections: loaded Nov 29, 2026, published Nov 28, 2026
  • TRCA regulation limit: loaded Oct 14, 2026, published Apr 29, 2026
  • TTC stops (GTFS): loaded Nov 8, 2026, published Nov 5, 2026
  • Zoning by-law: loaded Nov 29, 2026, published Nov 23, 2026
  • Lot coverage overlay: loaded Nov 29, 2026, published Nov 23, 2026
  • Height overlay: loaded Nov 29, 2026, published Nov 23, 2026
  • Parking zone overlay: loaded Nov 29, 2026, published Nov 23, 2026
  • Policy area overlay: loaded Nov 29, 2026, published Nov 23, 2026
  • Priority retail streets: loaded Nov 29, 2026, published Nov 23, 2026
  • Rooming house overlay: loaded Nov 29, 2026, published Nov 23, 2026
  • Zoning setbacks: loaded Nov 29, 2026, published Nov 23, 2026

Contains information licensed under the Open Government Licence – Toronto. TRCA regulation limit © TRCA.

Screening tool based on City of Toronto and TRCA open data. Not a zoning review or legal opinion. Site-specific exceptions, amendments not yet in the open data, minor variances and other by-laws can change the answer. Confirm with a Preliminary Project Review or Zoning Certificate from Toronto Building before buying or designing.

Flag an error

What is not right?

The problem

The records come from the City's open data; we check each flag against them. Your email is used only to answer this.