HousePrecheckCheck an address

164 Eglinton Ave ENorth Toronto, Toronto · City records before you offer

Commercial residential · CR 5.0 (c3.0; r3.0) SS2 (x2497)14.2 × 34.3 m486 m²on Eglinton Ave E

2 things to check before you offer, including 2 building permits open, the oldest since 2015
N20 m
14.2 m frontage34.3 m deep

Everything here comes from public records: City of Toronto open data, TRCA and Statistics Canada, 15 sets in all. Each item leads to the record it comes from. Our sources

This house at a glance

Each score from 0 to 10: 0 needs attention, 10 all clear. Build potential is how much more you could add.

About 164 Eglinton Ave E

164 Eglinton Ave E is on a 14.2 m by 34.3 m lot on Eglinton Ave E in North Toronto. The zoning is CR. A site-specific exception, 900.11.10(2497), changes some of the usual rules for this address.

The City has 20 records on this lot since 1988. That is more than at 99% of Toronto houses. In 2025, a development application was filed: "Lift the h". Status: closed. In 2022, a development application was filed: "Site plan application to permit a 61-storey multi-tower mixed use building with a maximum gross floor area of 90,000 square metres, 201 parking spaces, 1,329…". Status: under review. In 2021, a development application was filed: "Draft plan of subdivision for the creation of 5 lots". Status: under review. 2 open permits mean the City has not closed the files. Ask the seller whether the work was finished and passed its final inspection.

Within 300 m, 30 development applications are open (the tallest up to 70 storeys). Within 300 m, the Committee of Adjustment decided 10 minor variance applications in the last 10 years and approved 100%. Mount Pleasant station is a 4-minute walk, and the lot is in its Major Transit Station Area.

Summary

What the City's records show on this house

  • 2 building permits open, the oldest since 2015ModerateFree check
  • Work or applications in progressModerateFree check
  • Site-specific exception 900.11.10(2497)Moderate
  • 30 development applications open within 300 mLowFree check
  • 1 City tree in front of this lotLowFree check
  • Yonge-Eglinton Secondary PlanLow

Left unchecked, any of these can mean unexpected costs, trouble after closing, or plans you can't carry out. Found before you offer, they give you room to negotiate. The full report explains what each one means for this house and what to do next.

Unlock the full report

15 sets of public records, already checked for you. Searching each one yourself and working out what it means for you takes time. We have done that work: what matters about this house and lot, in plain English, in a few minutes.

What to find out first

2 things to check before you offer.

What to find out before an offer, the steps to take, what each costs and how long it takesUnlock

Check carefully

Open City files

How much in the City's records needs answers before an offer

  • 2 building permits open, the oldest since 2015
  • Work or applications in progress
  • No open orders or by-law investigations

What this part means for this house, in plain EnglishUnlock

  1. 2 building permits open, the oldest since 2015

    ModerateCheck before you offer

    What the record shows, what it means for you and what to doUnlock

  2. Work or applications in progress

    ModerateCheck before you offer

    What the record shows, what it means for you and what to doUnlock

City files on this lot

20 records on file, more than at 99% of Toronto houses (median 0 records).

DateRecordAs the City filed itIn plain wordsStatus
2025-06-11Development application
25 175704 STE 12 OZ
Lift the HClosed
2024-04-22Building permit
24 139151
1 wall sign + 1 projecting sign**Bindaz Biryani**Cancelled
2022-04-11Development application
22 132905 STE 12 SA
Site Plan application to permit a 61-storey multi-tower mixed use building with a maximum gross floor area of 90,000 square metres, 201 parking spaces, 1,329 bicycle parking spaces, and a north-south midblock connection.Under Review
2021-09-16Development application
21 213552 STE 12 SB
Draft Plan of Subdivision for the creation of 5 lots.Under Review
2021-07-14Development application
21 184231 STE 12 OZ
Official Plan and Zoning By-law Amendment application to permit a 61-storey multi-tower mixed use building with1,329 residential units. Official Plan Amendment requested for relief from office replacement policies of the Yonge-Eglinton Secondary Plan.Council Approved
2020-05-11Building permit
19 139329
Interior alterations to unit 508Permit Issued
2016-11-14Building permit
16 240143
Proposal to install a backflow prevention device in an existing office building.Closed
2015-09-30Building permit
15 225180
Interior Alterations on the 4th floorInspection
2010-11-19Building permit
10 287735
permit for interior alterations to existing office space - floor 2 - Canacon ConstructionClosed
2010-03-08Building permit
10 113050
Revision to existing permit: See highlighted area. interior alterations to existing office space - floor 2Closed
2000-07-05Building permit
00 166367
install partitions on 2nd floor, new tenant office space--investment challenge com.--Closed
2000-01-20Building permit
00 120234
Interior alterations for office purposes, erect partitions on the 3rd fl. Tenant - Investment Challenge . Com.Closed
1999-04-26Zoning review
99 022277 LTO
No description on fileClosed
1999-02-17Building permit
99 013018
INSTALL PLUMBING FIXTURES ON 4TH FLOOR OFFICE: 1 KITCHEN SINK, 1 DISHWASHER REFER TO APPLICATION NUMBER: 422112Closed
1999-02-17Building permit
99 013016
INSTALL PARTITIONS ON 4TH FLOOR OFFICE. TENANT: INVESTMENT CHALLENGE /LMClosed
1998-05-08Zoning review
98 026106 LTO
No description on fileClosed
1996-01-29Building permit
95 023535
INSTALL NEW FIXTURES 1ST: 3 WB, 1 VENTED TRAP 5TH: 1 KS, 1 WB, 1 WC. COST INCL: 380562 BPClosed
1995-05-03Building permit
94 024361
MAKE INTERIOR ALTERATIONS ON 2ND FLOOR.Closed
1991-12-09Zoning review
91 027142 LTO
No description on fileClosed
1988-03-02Zoning review
88 030178 LTO
No description on fileClosed
Clear

Restrictions

How much heritage, nature and site-specific rules limit changes to the house

  • Site-specific exception 900.11.10(2497)
  • No heritage listing or designation

What this part means for this house, in plain EnglishUnlock

  1. Site-specific exception 900.11.10(2497)

    ModerateCheck if it applies

    What the record shows, what it means for you and what to doUnlock

  2. 1 City tree in front of this lot

    LowFor later, once you own it

    What the record shows, what it means for you and what to doUnlock

  3. Yonge-Eglinton Secondary Plan

    LowFor later, once you own it

    What the record shows, what it means for you and what to doUnlock

If you want to change or build

What the site-specific rules mean for an addition, a garage or a rebuild.

Site-specific exception 900.11.10(2497)

What the exception changes for this address, rule by ruleUnlock

Not on this lot

Flood and erosion rules

How much of the lot lies in the areas TRCA regulates for flooding and erosion

  • Outside the areas TRCA regulates

From TRCA's regulated areas only. Basement flooding, sewer back-up and the TRCA flood plain are not in this score yet; ask the seller and your insurer about water in the basement.

What this part means for this house, in plain EnglishUnlock

Little left to add

Build potential

How much more the rules allow on this lot, beyond what is on record

What this part means for this house, in plain EnglishUnlock

The lot and what the rules allow

N20 m
14.2 m frontage34.3 m deepon Eglinton Ave E
Zone
CR 5.0 (c3.0; r3.0) SS2 (x2497)
Height limit
48 m
Corner lot
No
Public lane
None
House footprint
419 m²
Back yard
2.4 m
Buildings on the lot
3

House and yards from the City's 3D Massing; a survey gives exact figures.

What you can build

    Why, measured on this lot, and the most you could buildUnlock

    Busy

    Building nearby

    How much neighbours are building and applying to change within 300 m

    • 30 development applications open within 300 m, up to 70 storeys
    • In the Eglinton station area
    • 10 minor variance decisions within 300 m, 100% approved

    What this part means for this house, in plain EnglishUnlock

    1. 30 development applications open within 300 m

      LowCheck if it applies

      What the record shows, what it means for you and what to doUnlock

    What the City allowed next door

    Within 500 m, last 10 years: a guide if you plan to build or apply for something similar.

    What neighbours have built and changed around you, and how the City decidedUnlock

    Crime well below median

    Area safety

    Police-reported crime in the neighbourhood against the Toronto median

    • Lower than the Toronto median in 5 of 6 categories

    Neighbourhood rates per 100,000 people from the Toronto Police Service, not this street.

    What this part means for this house, in plain EnglishUnlock

    North Toronto neighbourhood

    About the area, not this house.

    2021 Census, against the median Toronto neighbourhood

    Median household income (2020)$70,000median $84,500
    Households that own their home19%median 54%
    Population (2021)15,885median 16,813
    Homes built in 1960 or before9%median 29%
    Homes needing major repairs4%median 7%

    Getting around and schools

    • Mount Pleasant StationNearest station4 min walk
    • Eglinton Ave East at Redpath AveNearest TTC stop1 min walk
    • Broadway AveNearest cycling route5 min walk
    • Willowdale High SchoolSchool1 min walk
    • CareerquestSchool1 min walk
    • Eglinton Linc and Esl CentreSchool3 min walk
    • Eglinton Jr Public SchoolSchool3 min walk

    Police-reported crime, 2025, per 100,000 people

    • Assaultcity median 636.3626.8
    • Robberycity median 69.553.4
    • Auto theftcity median 192.668
    • Theft over $5,000city median 46.124.3
    • Break and entercity median 172.8174.9
    • Theft from vehiclescity median 188.163.2

    More about North Toronto

    Ready emails

    Copy and send as they are.

    4 questions for the seller and your lawyer, written outUnlock

    What we checked, and what the City's records don't cover

    We checked 48 sets of City of Toronto, TRCA and Statistics Canada open data for this address, last updated Nov 27, 2026. Our records don't cover flooding history, ownership and mortgages, or the condition of the house: ask the seller and your insurer about water in the basement, your lawyer about title, and book a home inspection.

    See every source and when we loaded it · Pre-offer checklist

    Something here not right?

    Screening tool based on City of Toronto and TRCA open data. Not a zoning review or legal opinion. Site-specific exceptions, amendments not yet in the open data, minor variances and other by-laws can change the answer. Confirm with a Preliminary Project Review or Zoning Certificate from Toronto Building before buying or designing.

    Scores calibrated on Toronto house lots on 2026-10-19; prices and sources checked on 2026-10-06. Contains information licensed under the Open Government Licence – Toronto. TRCA regulation limits © Toronto and Region Conservation Authority.

    Full pre-offer report · 164 Eglinton Ave E

    2 things to check at 164 Eglinton Ave E before you offer

    • 2 building permits open, the oldest since 2015Moderate
    • Work or applications in progressModerate
    • Site-specific exception 900.11.10(2497)Moderate
    • 30 development applications open within 300 mLow
    • and 2 more

    The report explains what each one can cost you on this house and what to ask the seller or the City before you offer.

    $29 CAD one time · opens right away

    See a sample report

    Full refund within 30 days if the report left out or misstated a City record on the lot. Refund policy

    Also in the report

    • A PDF to forward to your agent and lawyer
    • What you can build on this lot, measured on it
    • Every line linked to the City record it comes from
    • 15 sets of public records, already searched and read for you
    • A clear list of the 7 steps to take before you offer, so nothing slips
    • What each of the 6 findings can cost you or stop you doing, in plain English
    • A two-minute summary of this house, and what to find out first before you offer
    • What the City allowed your neighbours, a guide if you plan to build or apply for something similar
    • We watch this address for 90 days. If anything changes in the City's records, we email you the same day
    • A short summary of each part: City files, restrictions, flood and erosion, build potential, building nearby, area safety

    By paying you agree to the terms of use and the refund policy. Payment by Stripe. The report opens right after payment, and we email you a link to it; your account is made from the email you pay with. A screening of public records, not a legal opinion or a home inspection.

    Flag an error

    What is not right?

    The problem

    The records come from the City's open data; we check each flag against them. Your email is used only to answer this.