HousePrecheckCheck an address

16 Shaftesbury AveRosedale-Moore Park, Toronto · City records before you offer

Residential · R (d0.6) (x910)13.2 × 38.2 m502 m²on Charlesworth Lanecorner, also on Shaftesbury Ave

2 things to check before you offer, including 4 building permits open, the oldest since 2020
N10 m
13.2 m frontage38.2 m deep

Everything here comes from public records: City of Toronto open data, TRCA and Statistics Canada, 15 sets in all. Each item leads to the record it comes from. Our sources

This house at a glance

Each score from 0 to 10: 0 needs attention, 10 all clear. Build potential is how much more you could add.

About 16 Shaftesbury Ave

16 Shaftesbury Ave is on a 13.2 m by 38.2 m lot on Charlesworth Lane in Rosedale-Moore Park. The zoning is R. A site-specific exception, 900.2.10(910), changes some of the usual rules for this address. The lot also fronts Shaftesbury Ave. The City lists the property on its Heritage Register. Listing does not stop changes inside, but the City must get 60 days' notice before any demolition.

The City has 9 records on this lot since 2009. That is more than at 99% of Toronto houses. In 2022, a building permit was filed: "Fire standpipe design". Status: inspection. In 2021, a building permit was filed: "Proposed watermain relocation and other site servicing work related to permit 21-117938 bld". Status: permit issued. In 2021, a building permit was filed: "Proposal to install 2 elevators from street level to platform level and associated spaces, installation of new main entrance addition to the summerhill station". Status: inspection. 4 open permits mean the City has not closed the files. Ask the seller whether the work was finished and passed its final inspection.

Within 300 m, 10 development applications are open (the tallest up to 49 storeys). Summerhill station is a 1-minute walk, and the lot is in its Major Transit Station Area.

Summary

What the City's records show on this house

  • 4 building permits open, the oldest since 2020ModerateFree check
  • Heritage property: listedModerate
  • Site-specific exception 900.2.10(910)Moderate
  • No permit for a second unit on fileLowFree check
  • The back yard may be too tight for a garden suiteLowFree check
  • 10 development applications open within 300 mLowFree check
  • Yonge-St. Clair Secondary PlanLow
  • 1 Committee of Adjustment file on this lotLowFree check

Left unchecked, any of these can mean unexpected costs, trouble after closing, or plans you can't carry out. Found before you offer, they give you room to negotiate. The full report explains what each one means for this house and what to do next.

What the rules allow here: Multiplex up to 6 units

Unlock the full report

15 sets of public records, already checked for you. Searching each one yourself and working out what it means for you takes time. We have done that work: what matters about this house and lot, in plain English, in a few minutes.

What to find out first

2 things to check before you offer.

What to find out before an offer, the steps to take, what each costs and how long it takesUnlock

Check

Open City files

How much in the City's records needs answers before an offer

  • 4 building permits open, the oldest since 2020
  • No open orders or by-law investigations
  • No work or applications in progress

What this part means for this house, in plain EnglishUnlock

  1. 4 building permits open, the oldest since 2020

    ModerateCheck before you offer

    What the record shows, what it means for you and what to doUnlock

  2. No permit for a second unit on file

    LowCheck if it applies

    What the record shows, what it means for you and what to doUnlock

  3. 1 Committee of Adjustment file on this lot

    LowFor later, once you own it

    What the record shows, what it means for you and what to doUnlock

City files on this lot

9 records on file, more than at 99% of Toronto houses (median 0 records).

DateRecordAs the City filed itIn plain wordsStatus
2022-01-05Building permit
21 232520
Fire standpipe designInspection
2021-04-21Building permit
21 117975
Proposed Watermain relocation and other Site Servicing work related to permit 21-117938 BLD.Permit Issued
2021-04-20Building permit
21 117938
Proposal to install 2 elevators from street level to platform level and associated spaces, installation of new main entrance addition to the Summerhill Station.Inspection
2020-10-23Building permit
20 191506
Install a new support bracket on the north portal wall to support the existing precast concrete elevated structure over the TTC tunnel. The existing support angle has deteriorated due to corrosion and will remain in place and be supplemented with a new support bracket.Permit Issued
2020-02-26Minor variance
A0934/19TEY
To alter the existing Subway Station (TTC's Summerhill Station) by constructing east and west side additions for the installation of elevators which will provide service from the street level to the subway platform level.Approved
2018-12-03Zoning review
18 263554 ZZC
No description on fileClosed
2018-01-31Building permit
17 279958
Proposal for interior alterations to existing transit station. Scope of work includes replacing legacy turnstiles with Presto faregates - Summerhill TTC Subway StationClosed
2017-02-15Building permit
16 215740
Revision to layout - Placement of a platform and railing assembly on top of an existing roof of TTC's Summerhill Subway StationClosed
2009-04-09Building permit
09 122247
Proposal to install and alter fire alarm system (2 floors) for Summerhill Subway Station.Closed
Minor

Restrictions

How much heritage, nature and site-specific rules limit changes to the house

  • Heritage property: listed
  • Site-specific exception 900.2.10(910)

What this part means for this house, in plain EnglishUnlock

  1. Heritage property: listed

    ModerateCheck before you offer

    What the record shows, what it means for you and what to doUnlock

  2. Site-specific exception 900.2.10(910)

    ModerateCheck if it applies

    What the record shows, what it means for you and what to doUnlock

  3. Yonge-St. Clair Secondary Plan

    LowFor later, once you own it

    What the record shows, what it means for you and what to doUnlock

If you want to change or build

What the site-specific rules mean for an addition, a garage or a rebuild.

Site-specific exception 900.2.10(910)

What the exception changes for this address, rule by ruleUnlock

Not on this lot

Flood and erosion rules

How much of the lot lies in the areas TRCA regulates for flooding and erosion

  • Outside the areas TRCA regulates

From TRCA's regulated areas only. Basement flooding, sewer back-up and the TRCA flood plain are not in this score yet; ask the seller and your insurer about water in the basement.

What this part means for this house, in plain EnglishUnlock

Some

Build potential

How much more the rules allow on this lot, beyond what is on record

  • Multiplex up to 6 units: likely fits
  • Garden suite: needs a closer look
  • Secondary suite: likely fits

What this part means for this house, in plain EnglishUnlock

  1. The back yard may be too tight for a garden suite

    LowCheck if it applies

    What the record shows, what it means for you and what to doUnlock

  2. Multiplex up to 6 units

    LowFor later, once you own it

    What the record shows, what it means for you and what to doUnlock

The lot and what the rules allow

N10 m
13.2 m frontage38.2 m deepon Charlesworth Lane
Zone
R (d0.6) (x910)
Height limit
12 m
Corner lot
Yes, also on Shaftesbury Ave
Public lane
None
New house permit
None since 2000
House footprint
248 m²
Back yard
15.2 m
Buildings on the lot
1

House and yards from the City's 3D Massing; a survey gives exact figures.

What you can build

Why, measured on this lot, and the most you could buildUnlock

Busy

Building nearby

How much neighbours are building and applying to change within 300 m

  • 10 development applications open within 300 m, up to 49 storeys
  • In the Summerhill station area
  • 4 suite and multiplex permits within 300 m in 10 years

What this part means for this house, in plain EnglishUnlock

  1. 10 development applications open within 300 m

    LowCheck if it applies

    What the record shows, what it means for you and what to doUnlock

What the City allowed next door

Within 500 m, last 10 years: a guide if you plan to build or apply for something similar.

What neighbours have built and changed around you, and how the City decidedUnlock

Crime above median

Area safety

Police-reported crime in the neighbourhood against the Toronto median

  • Lower than the Toronto median in 1 of 6 categories
  • Break and enter: 2.6 times the Toronto median
  • Assault: 1.7 times the Toronto median

Neighbourhood rates per 100,000 people from the Toronto Police Service, not this street.

What this part means for this house, in plain EnglishUnlock

Rosedale-Moore Park neighbourhood

About the area, not this house.

2021 Census, against the median Toronto neighbourhood

Median household income (2020)$122,000median $84,500
Households that own their home58%median 54%
Population (2021)20,080median 16,813
Homes built in 1960 or before46%median 29%
Homes needing major repairs6%median 7%

Getting around and schools

  • Summerhill StationNearest station1 min walk
  • Summerhill Station - Southbound PlatformNearest TTC stop1 min walk
  • Yonge StNearest cycling route1 min walk
  • The York School - Mdl and Sr CampusSchool5 min walk
  • Cottingham Jr Public SchoolSchool7 min walk
  • The Linden SchoolSchool8 min walk
  • De Lasalle College SchoolSchool10 min walk

Police-reported crime, 2025, per 100,000 people

  • Assaultcity median 636.31080.4
  • Robberycity median 69.586.8
  • Auto theftcity median 192.6199.6
  • Theft over $5,000city median 46.165.1
  • Break and entercity median 172.8455.6
  • Theft from vehiclescity median 188.1182.2

More about Rosedale-Moore Park

Ready emails

Copy and send as they are.

2 questions for the seller and your lawyer, written outUnlock

What we checked, and what the City's records don't cover

We checked 48 sets of City of Toronto, TRCA and Statistics Canada open data for this address, last updated Nov 28, 2026. Our records don't cover flooding history, ownership and mortgages, or the condition of the house: ask the seller and your insurer about water in the basement, your lawyer about title, and book a home inspection.

See every source and when we loaded it · Pre-offer checklist

Something here not right?

Screening tool based on City of Toronto and TRCA open data. Not a zoning review or legal opinion. Site-specific exceptions, amendments not yet in the open data, minor variances and other by-laws can change the answer. Confirm with a Preliminary Project Review or Zoning Certificate from Toronto Building before buying or designing.

Scores calibrated on Toronto house lots on 2026-10-19; prices and sources checked on 2026-10-06. Contains information licensed under the Open Government Licence – Toronto. TRCA regulation limits © Toronto and Region Conservation Authority.

Full pre-offer report · 16 Shaftesbury Ave

2 things to check at 16 Shaftesbury Ave before you offer

  • 4 building permits open, the oldest since 2020Moderate
  • Heritage property: listedModerate
  • Site-specific exception 900.2.10(910)Moderate
  • No permit for a second unit on fileLow
  • and 4 more

The report explains what each one can cost you on this house and what to ask the seller or the City before you offer.

$29 CAD one time · opens right away

See a sample report

Full refund within 30 days if the report left out or misstated a City record on the lot. Refund policy

Also in the report

  • A PDF to forward to your agent and lawyer
  • What you can build on this lot, measured on it
  • Every line linked to the City record it comes from
  • 15 sets of public records, already searched and read for you
  • A clear list of the 8 steps to take before you offer, so nothing slips
  • What each of the 8 findings can cost you or stop you doing, in plain English
  • A two-minute summary of this house, and what to find out first before you offer
  • What the City allowed your neighbours, a guide if you plan to build or apply for something similar
  • We watch this address for 90 days. If anything changes in the City's records, we email you the same day
  • A short summary of each part: City files, restrictions, flood and erosion, build potential, building nearby, area safety

By paying you agree to the terms of use and the refund policy. Payment by Stripe. The report opens right after payment, and we email you a link to it; your account is made from the email you pay with. A screening of public records, not a legal opinion or a home inspection.

Flag an error

What is not right?

The problem

The records come from the City's open data; we check each flag against them. Your email is used only to answer this.