HousePrecheckCheck an address

155 George StMoss Park, Toronto · City records before you offer

Commercial residential · CR 4.5 (c2.0; r4.0) SS2 (x333)11.2 × 21.8 m237 m²on George Stcorner, also on Britain Stbacks onto Bootlegger Lane

3 things to check before you offer, including building permit open since 2023
N5 m
11.2 m frontage21.8 m deep

Everything here comes from public records: City of Toronto open data, TRCA and Statistics Canada, 15 sets in all. Each item leads to the record it comes from. Our sources

This house at a glance

Each score from 0 to 10: 0 needs attention, 10 all clear. Build potential is how much more you could add.

About 155 George St

155 George St is on a 11.2 m by 21.8 m lot on George St in Moss Park. The zoning is CR. A site-specific exception, 900.11.10(333), changes some of the usual rules for this address. The lot also fronts Britain St. The City lists the property on its Heritage Register. Listing does not stop changes inside, but the City must get 60 days' notice before any demolition.

The City has 16 records on this lot since 1999. That is more than at 99% of Toronto houses. In 2025, a building permit was filed: "Proposal for rooftop photovoltaic solar panels installation". Status: permit issued. In 2023, a building permit was filed: "Proposal for a party wall permit related to 8 britain st(22 214476 bld 00 ba)". Status: permit issued. In 2022, a building permit was filed: "Proposal to construct a roof top deck at a commerical residential building". Status: closed. 2 open permits mean the City has not closed the files. Ask the seller whether the work was finished and passed its final inspection.

Within 300 m, 14 development applications are open (the tallest up to 65 storeys). Queen station is a 10-minute walk, and the lot is in its Major Transit Station Area.

Summary

What the City's records show on this house

  • Building permit open since 2023ModerateFree check
  • Work or applications in progressModerateFree check
  • Heritage property: listedModerate
  • Site-specific exception 900.11.10(333)Moderate
  • 14 development applications open within 300 mLowFree check
  • King-Parliament Secondary PlanLow
  • 3 Committee of Adjustment files on this lotLowFree check

Left unchecked, any of these can mean unexpected costs, trouble after closing, or plans you can't carry out. Found before you offer, they give you room to negotiate. The full report explains what each one means for this house and what to do next.

Unlock the full report

15 sets of public records, already checked for you. Searching each one yourself and working out what it means for you takes time. We have done that work: what matters about this house and lot, in plain English, in a few minutes.

What to find out first

3 things to check before you offer.

What to find out before an offer, the steps to take, what each costs and how long it takesUnlock

Check carefully

Open City files

How much in the City's records needs answers before an offer

  • Building permit open since 2023
  • Work or applications in progress
  • No open orders or by-law investigations

What this part means for this house, in plain EnglishUnlock

  1. Building permit open since 2023

    ModerateCheck before you offer

    What the record shows, what it means for you and what to doUnlock

  2. Work or applications in progress

    ModerateCheck before you offer

    What the record shows, what it means for you and what to doUnlock

  3. 3 Committee of Adjustment files on this lot

    LowFor later, once you own it

    What the record shows, what it means for you and what to doUnlock

City files on this lot

16 records on file, more than at 99% of Toronto houses (median 0 records).

DateRecordAs the City filed itIn plain wordsStatus
2026-09-10By-law investigation
26 235139 WST 00 IR
WasteClosed
2025-02-28Building permit
25 111924
Proposal for rooftop photovoltaic solar panels installation.Permit Issued
2023-07-06Building permit
23 157290
Proposal for a party wall permit related to 8 BRITAIN ST(22 214476 BLD 00 BA)Permit Issued
2023-03-13Building permit
23 108443
Proposal to insert stair from basement to existing door at main level on north side of the building.Cancelled
2022-08-02Building permit
22 168397
Proposal to construct a roof top deck at a commerical residential building.Closed
2006-08-09Consent (lot split)
B0085/06TEY
This site is located at the northeast corner of George Street and Britain Street and contains two buildings; one fronting onto George Street and the other fronting onto Britain Street. The buildings are mixed use in nature, containing commercial and residential uses. The applicant is seeking the consent of the Committee of Adjustment in order to sever the buildings along the demising wall, so that each building will occupy its own respective lot; identified as Parts 1 and 2 on a sketch plan of severance prepared by R. G. McKibbon Limited, Ontario Land Surveyors. This application also involves reciprocal easements, identified as Parts 3, 4, 10, 12, 15 and 18 on the aforementioned sketch. This severance will comply with the provisions of Zoning By-law 438-86, as amended.Approved
2005-06-22Consent (lot split)
B0047/05TEY
This site is located at the northeast corner of George Street and Britain Street and contains two buildings; one fronting onto George Street and the other fronting onto Britain Street. The buildings are mixed use in nature, containing commercial and residential uses. The applicant is seeking the consent of the Committee of Adjustment in order to sever the buildings along the demising wall, so that each building will occupy its own respective lot; identified as Parts 1 and 2 on a sketch plan of severance prepared by R. G. McKibbon Limited, Ontario Land Surveyors. This application also involves reciprocal easements, identified as Parts 3, 4, 10, 12, 15 and 18 on the aforementioned sketch. This severance will comply with the provisions of Zoning By-law 438-86, as amended.Approved
2005-02-02Zoning review
05 106136 ZPR
No description on fileClosed
2003-02-14Building permit
02 154562
alter plans approved under bp 02-154562, by making deleting 2 dwelling units in basement and changing use of basement to office - changes bubbledClosed
2002-05-29Minor variance
A0232/02TEY
The applicant is seeking relief from the provisions of the Zoning By-law in order to make interior alterations to, and construct a two-storey addition (occupying an area of 399 square metres) at the front of, an existing building containing an artist's studio and 2 dwelling units. The proposed building, with interior alterations and the two-storey front addition, will have a total of 11 dwelling units.Approved
2002-04-18Building permit
02 122970
demolish all interior non-load bearing partitons on 1st floor front portion and basement front portion, fomer retail store. ceiling to remain.Closed
2002-04-15Zoning review
02 126804 ZPR
No description on fileClosed
2002-03-13Building permit
99 018097
CONSTRUCT 4TH FLOOR ADDITION OVER PORTION OF BUILDING. SEE BP# 422028 FEE$ 396.00Closed
2000-06-08Building permit
00 159865
AS BUILT PLANS IN RELATION TO PERMIT# 422028EXISITNG-ARTISTS /PHOTO STUDIOS AND DWELLING BUILDING- 2 UNITSPROPOSED- SAMECancelled
1999-06-17Building permit
99 017274
INSTALL HVAC -HIGH-EFFICIENCY GAS FURNACE AND DUCTWORK INTO 2 DWELLING UNITS LOCATED ON 2ND & 3RD FLOORS. COST INCLUDED IN BP 422028(990) (W24)/SPClosed
1999-03-08Building permit
99 012932
MAKE INTERIOR ALTERATIONS, CONSTRUCT 3RD FLOOR LEVEL INSIDE EXISTING BUILDING AT REAR, CONSTRUCT ROOFTOP STRUCTURE. FEE $1515.00Closed
Minor

Restrictions

How much heritage, nature and site-specific rules limit changes to the house

  • Heritage property: listed
  • Site-specific exception 900.11.10(333)

What this part means for this house, in plain EnglishUnlock

  1. Heritage property: listed

    ModerateCheck before you offer

    What the record shows, what it means for you and what to doUnlock

  2. Site-specific exception 900.11.10(333)

    ModerateCheck if it applies

    What the record shows, what it means for you and what to doUnlock

  3. King-Parliament Secondary Plan

    LowFor later, once you own it

    What the record shows, what it means for you and what to doUnlock

If you want to change or build

What the site-specific rules mean for an addition, a garage or a rebuild.

Site-specific exception 900.11.10(333)

What the exception changes for this address, rule by ruleUnlock

Not on this lot

Flood and erosion rules

How much of the lot lies in the areas TRCA regulates for flooding and erosion

  • Outside the areas TRCA regulates

From TRCA's regulated areas only. Basement flooding, sewer back-up and the TRCA flood plain are not in this score yet; ask the seller and your insurer about water in the basement.

What this part means for this house, in plain EnglishUnlock

Little left to add

Build potential

How much more the rules allow on this lot, beyond what is on record

What this part means for this house, in plain EnglishUnlock

The lot and what the rules allow

N10 m
11.2 m frontage21.8 m deepon George St
Zone
CR 4.5 (c2.0; r4.0) SS2 (x333)
Height limit
25 m
Corner lot
Yes, also on Britain St
Public lane
Bootlegger Lane, 30.4 m along it
House footprint
228 m²
Back yard
0 m
Buildings on the lot
1

House and yards from the City's 3D Massing; a survey gives exact figures.

What you can build

    Why, measured on this lot, and the most you could buildUnlock

    Busy

    Building nearby

    How much neighbours are building and applying to change within 300 m

    • 14 development applications open within 300 m, up to 65 storeys
    • In the Corktown station area
    • 6 suite and multiplex permits within 300 m in 10 years

    What this part means for this house, in plain EnglishUnlock

    1. 14 development applications open within 300 m

      LowCheck if it applies

      What the record shows, what it means for you and what to doUnlock

    What the City allowed next door

    Within 500 m, last 10 years: a guide if you plan to build or apply for something similar.

    What neighbours have built and changed around you, and how the City decidedUnlock

    Crime above median

    Area safety

    Police-reported crime in the neighbourhood against the Toronto median

    • Lower than the Toronto median in 3 of 8 categories
    • Assault: 3.5 times the Toronto median
    • Robbery: 2.4 times the Toronto median
    • Break and enter: 2.0 times the Toronto median

    Neighbourhood rates per 100,000 people from the Toronto Police Service, not this street.

    What this part means for this house, in plain EnglishUnlock

    Moss Park neighbourhood

    About the area, not this house.

    2021 Census, against the median Toronto neighbourhood

    Median household income (2020)$65,000median $84,500
    Households that own their home35%median 54%
    Population (2021)21,490median 16,813
    Homes built in 1960 or before17%median 29%
    Homes needing major repairs8%median 7%

    Getting around and schools

    • Queen StationNearest station10 min walk
    • Queen St East at Jarvis StNearest TTC stop2 min walk
    • Richmond St ENearest cycling route2 min walk
    • George Brown College - St James CampusSchool5 min walk
    • Ecole Elementaire Gabrielle RoySchool5 min walk
    • Keystone International SchoolsSchool8 min walk
    • St Michael's Choir School - ElementarySchool9 min walk

    Police-reported crime, 2025, per 100,000 people

    • Assaultcity median 636.32226.8
    • Robberycity median 69.5166.6
    • Homicidecity median 5.33.4
    • Shootingscity median 10.53.4
    • Auto theftcity median 192.681.6
    • Theft over $5,000city median 46.164.6
    • Break and entercity median 172.8350.2
    • Theft from vehiclescity median 188.1275.4

    More about Moss Park

    Ready emails

    Copy and send as they are.

    4 questions for the seller and your lawyer, written outUnlock

    What we checked, and what the City's records don't cover

    We checked 48 sets of City of Toronto, TRCA and Statistics Canada open data for this address, last updated Nov 27, 2026. Our records don't cover flooding history, ownership and mortgages, or the condition of the house: ask the seller and your insurer about water in the basement, your lawyer about title, and book a home inspection.

    See every source and when we loaded it · Pre-offer checklist

    Something here not right?

    Screening tool based on City of Toronto and TRCA open data. Not a zoning review or legal opinion. Site-specific exceptions, amendments not yet in the open data, minor variances and other by-laws can change the answer. Confirm with a Preliminary Project Review or Zoning Certificate from Toronto Building before buying or designing.

    Scores calibrated on Toronto house lots on 2026-10-19; prices and sources checked on 2026-10-06. Contains information licensed under the Open Government Licence – Toronto. TRCA regulation limits © Toronto and Region Conservation Authority.

    Full pre-offer report · 155 George St

    3 things to check at 155 George St before you offer

    • Building permit open since 2023Moderate
    • Work or applications in progressModerate
    • Heritage property: listedModerate
    • Site-specific exception 900.11.10(333)Moderate
    • and 3 more

    The report explains what each one can cost you on this house and what to ask the seller or the City before you offer.

    $29 CAD one time · opens right away

    See a sample report

    Full refund within 30 days if the report left out or misstated a City record on the lot. Refund policy

    Also in the report

    • A PDF to forward to your agent and lawyer
    • What you can build on this lot, measured on it
    • Every line linked to the City record it comes from
    • 15 sets of public records, already searched and read for you
    • A clear list of the 8 steps to take before you offer, so nothing slips
    • What each of the 7 findings can cost you or stop you doing, in plain English
    • A two-minute summary of this house, and what to find out first before you offer
    • What the City allowed your neighbours, a guide if you plan to build or apply for something similar
    • We watch this address for 90 days. If anything changes in the City's records, we email you the same day
    • A short summary of each part: City files, restrictions, flood and erosion, build potential, building nearby, area safety

    By paying you agree to the terms of use and the refund policy. Payment by Stripe. The report opens right after payment, and we email you a link to it; your account is made from the email you pay with. A screening of public records, not a legal opinion or a home inspection.

    Flag an error

    What is not right?

    The problem

    The records come from the City's open data; we check each flag against them. Your email is used only to answer this.