HousePrecheckCheck an address

151 Merton StToronto · zoning, lot size and permit records

Commercial residential · CR 2.0 (c2.0; r2.0) SS2 (x2495)38.3 × 38.8 m1,468 m²on Merton St

Not a single house

A condominium parcel

The City's property boundaries show this parcel as a condominium: the homes on it are units of a condominium corporation, which owns the land and common elements. Build options for a house do not apply; the corporation's status certificate is the document to read before an offer.

Looking at a house nearby? What this means for you

  • A condominium on 0.1 haIts owners share the land and decide together on changes; expect more cars and visitors than a house.
  • Permits or applications open on this parcelStill open in the City's records: 16 241007 (Install new backflow prevention device, 2016, status Inspection); 06 164785 (Remove nonloadbearing wall between kitchen and living/dining room; renovate kitchen, 2006, status Inspection). Larger work can mean noise and trucks next door; read what each one is for.
  • 13 development applications open within 300 m, up to 46 storeysNew buildings may go up around here in the next years. More change nearby than at 99% of Toronto houses.
  • Major Transit Station Area: DavisvilleThe City plans more homes around the station: good for transit, and more building over time.

Want to check this condo before you buy?

We are building checks for condominiums. Leave your email and we will tell you when it is ready.

N20 m
38.3 m frontage38.8 m deep

Before you offer

From the City's records on this lot. Each item says what it means for a purchase and how to confirm it.

  • 2 building permits open, the oldest since 2006

    Needs a closer look

    Still open in the City's records: 16 241007 (Install new backflow prevention device, 2016, status Inspection); 06 164785 (Remove nonloadbearing wall between kitchen and living/dining room; renovate kitchen, 2006, status Inspection).

    What it means. An open permit can mean work that was never finished or never passed final inspection. After closing, finishing it or closing the file can fall to you.

    How to confirm. Ask the seller for the final inspection records. A Property Information Report from Toronto Building lists open permits, inspections and outstanding orders ($214.79, about five business days). Details

    City of Toronto, Building Permits (active, cleared since 2017, cleared 2000-2016)
  • 13 development applications open within 300 m

    Good to know

    13 rezoning, site plan, subdivision or condominium applications within 300 m, submitted in the last 10 years, are not closed yet, including buildings of up to 46 storeys. They are listed under Around this lot.

    What it means. New buildings nearby can change views, sunlight, traffic and construction noise for years.

    How to confirm. Each application, its drawings and its status are in the Application Information Centre. Details

    City of Toronto, Development Applications

Not in these records

  • Flooding history. Past basement flooding and insurance claims on this house are not published. Ask the seller directly and ask your insurer before you firm up the offer.
  • Ownership, mortgages and easements. Title is not open data. Your lawyer searches title after the offer; ask for the survey and any easements before.

History of this lot

5 records on file: more than at 93% of Toronto houses (median 0).

  • Building permit22 130890Closed

    WIndow replacement and guard replacement at terraces to existing

    May 17, 2022 · 151 MERTON ST
  • Building permit16 241007Inspection

    Install new backflow prevention device

    Oct 28, 2016 · 151 MERTON ST
  • Building permit06 164785Inspection

    Remove nonloadbearing wall between kitchen and living/dining room; renovate kitchen

    Aug 14, 2006 · 151 MERTON ST
  • Zoning review92 026208 LTOClosed
    Nov 18, 1992 · 151 MERTON ST
  • Zoning review91 026534 LTOClosed
    May 29, 1991 · 151 MERTON ST

Check before you build

  • Site-specific exception 900.11.10(2495)

    Needs a closer look

    1 site-specific rule and 1 older by-law that still prevails apply to this lot. They can override the standard rules on this page.

    Zoning By-law 569-2013, Chapter 900
Exception 900.11.10(2495)Applies

These parts of the exception apply to this lot's address.

  1. Rule A

    In a Commercial Residential zone, where the maximum lawfully permitted height exceeds the width of the right-of-way of the street it abuts then: (i) the angular plane requirements of regulations 40.10.40.70(2)(E) and 40.10.40.70(2)(G) do not apply; (ii) the rear yard setback requirements of regulation 40.10.40.70(2)(B) do not apply; and (iii) if the rear main wall of a building does not contain windows or openings: (a) the building must be set back at least 3.0 metres from any rear lot line that abuts a lot in the Residential Zone category; and (b) no building setback is required from any other zone category.

  2. Older by-law A

    Section 12(2) 270(a) of former City of Toronto By-law 438-86

7 parts for other addresses
  • B On 35 Merton St., former City of Toronto by-law 96-0053
  • C On the even numbered addresses of 64-84 Merton St., former City of Toronto by-laws 97-0523 and 97-0551
  • D On 71 Merton St., former City of Toronto by-law 496-77
  • E On 100 Merton St., former City of Toronto by-law 94-0579
  • F On the lands municipally known as 137 to 147 Merton St. in 1992, Section 12(1) 308 of former City of Toronto By-law 438-86
  • G On 119 Merton St., former City of Toronto by-laws 96-0055 and 97-0594
  • H On 195 Merton St., and 253 Merton St. City of Toronto by-law 358-00.
By-law 569-2013, Chapter 900

Lot facts

Area
1,468 m²
Frontage
38.3 m
Depth
38.8 m
Street
Merton St
Corner lot
No
Public lane
None
Max height
21 m
Max lot coverage
—
  • Major Transit Station Area: Davisville. The lot is inside the Davisville Major Transit Station Area approved by the Province (Site and Area Specific Policy 722). Source
  • Yonge-Eglinton Secondary Plan. A Secondary Plan sets more detailed land use, height and density policies for this area. Source
  • Zone CR 2.0 (c2.0; r2.0) SS2 (x2495) (Commercial Residential). Chapter 40, section 40.10 of the by-law. Source
  • 6 City trees in front of this lot. The City's street tree inventory lists 6 trees at this address: maple, norway (27 cm), maple, norway (26 cm), maple, norway (23 cm). Diameter is the trunk at breast height. Source

Around this lot

Minor variances approved
100%6 of 6 decisions
Garden suite permits
0
Laneway suite permits
0
Multiplex permits
0
Development applications
22

Within 300 m, last 10 years. 0 suite and multiplex permits: no more than at most Toronto houses (median 3). 6 variance decisions: no more than at most Toronto houses (median 19).

Recent variance decisions in the same zone

  • Minor varianceApproved

    To alter the existing 12-storey apartment building (Building A) by enclosing the double-height opening within Unit 417 (located on the fourth and fifth levels) for additional habitable space.

    119 MERTON ST · Nov 19, 2025 · 92 m away
  • Minor varianceApproved

    To alter the development standards (as approved under Site Specific Zoning By-law 39-2025(OLT)), for a new 31-storey residential building, by increasing the building height from 102.9 m to 104.6 m. This is currently being reviewed under Site Plan Control (File 20 21 234919 STE 12 SA). There will be a total of 273 residential dwelling units.

    289 BALLIOL ST · Jul 23, 2025 · 377 m away
  • Minor varianceApproved

    To alter the mezzanine levels within two adjacent dwelling units (units 1210 and 1216).

    119 MERTON ST · May 31, 2023 · 92 m away
  • Minor varianceApproved

    To legalize and to maintain the shed that has been constructed between the two-storey building and the detached garage, without the benefit of a building permit.

    1913 YONGE ST · Jun 8, 2022 · 455 m away
  • Minor varianceApproved

    To alter the existing two-storey office building by constructing a third-storey addition.

    170 MERTON ST · Nov 4, 2015 · 66 m away

Latest activity nearby

  • Building permit

    Installation of two mag-locks and associated equipment on exit doors serving the basement.

    268 MERTON ST · Nov 10, 2026 · 292 m away
  • Zoning review

    Closed

    119 MERTON ST · Nov 3, 2026 · 92 m away
  • Zoning review

    Notice Sent

    275 MERTON ST · Oct 27, 2026 · 295 m away
  • Building permit

    Proposal to erect a temporary air supported structure on an existing tennis court area. Tent to be in place from October 13, 2026 to April 13, 2027

    185 BALLIOL ST · Oct 13, 2026 · 159 m away
  • Building permit

    Targeted waterproofing renewal at the parking garage roof slab, including localized concrete repairs.

    221 BALLIOL ST · Sep 11, 2026 · 226 m away
  • Building permit

    standpipe risers located within the contiguous scissor stairs

    140 MERTON ST · Aug 28, 2026 · 81 m away
  • Building permit

    Proposed adding Back flow preventer (BFP) to sprinkler line

    35 MERTON ST · Aug 17, 2026 · 299 m away
  • Building permit

    Replace the failed caulking, failed tuck pointing and damaged bricks for facade restoration

    77 DAVISVILLE AVE · Aug 4, 2026 · 268 m away
  • Building permit

    Proposal for balcony repairs

    221 BALLIOL ST · Aug 4, 2026 · 226 m away
  • Building permit

    Part Permit - The Indigenous organization, the Missanabie Cree First Nation, will be developing the site at 140 Merton Street, dedicating the project to housing options for Indigenous elders and other seniors.It will provide 294 new rental homes, of which approximately 98 will be affordable. The building will also include ceremonial space, a smudging room and indoor and outdoor amenities for residents.

    140 MERTON ST · Jul 22, 2026 · 81 m away

Neighbourhood: South Eglinton-Davisville

About the area around the lot, not the lot itself.

Nearest station
Davisville Station8 min walk
Nearest TTC stop
Davisville Ave at Pailton Cres4 min walk
Nearest cycling route
Kay Gardiner Beltline TrlMulti-Use Trail, 1 min walk
Nearest traffic count
5,774 vehicles in 8 hPailton Cres / Merton St, 210 m away, Dec 18, 2006
Serious collisions within 500 m
42021–2026, killed or seriously injured: 1 fatal, 2 with pedestrians, 0 with cyclists
Parks
Kay Gardner Beltline Park1 min walk
June Rowlands Park6 min walk
Mount Pleasant Parkette8 min walk

Schools within 1 km

  • DAVISVILLE & SPECTRUM SCHOOL English Public 6 min walk
  • GREENWOOD COLLEGE SCHOOL Private 9 min walk
  • TORONTO PREP SCHOOL Private 9 min walk
  • THE YORK SCHOOL - JR CAMPUS Private 10 min walk
  • THE STUDY ACADEMY SCHOOL Private 11 min walk
  • MANOR MONTESSORI - DE SAVERY SITE Private 11 min walk

Being near a school does not mean the lot is in its catchment; check with the board.

2021 Census

FigureSouth Eglinton-DavisvilleMedian neighbourhood
Median household income (2020)$80,000$84,500
Households that own their home30%54%
Population (2021)22,73516,813
Homes built in 1960 or before11%29%
Homes needing major repairs3%7%

Statistics Canada 2021 Census, 25% sample, by City of Toronto neighbourhood.

Police-reported crime, 2025

Per 100,000 peopleSouth Eglinton-DavisvilleCity median
Assault436636.3
Robbery24.269.5
Auto theft58.8192.6
Theft over $5,00020.846.1
Break and enter128172.8
Theft from vehicles100.3188.1

Neighbourhood totals from the Toronto Police Service. Rates are per resident, so areas with many visitors and few residents read high.

Something here not right?

Sources

  • Building permits on this lot since 2000: Permits issued or applied for since about 2000, with status.
  • Committee of Adjustment files since 2001: Minor variances and consents (lot splits) on this lot and nearby, with decisions.
  • Development applications: Rezoning, site plan, subdivision and condominium applications.
  • Preliminary zoning reviews: Zoning reviews requested before a permit or variance application.
  • Zoning and overlays: Zoning By-law 569-2013 zone, height, coverage, policy area, parking, rooming house, priority retail street and downtown setback overlays.
  • Lot boundary, street and lane: Lot polygon, its addresses, the street it fronts, corner and public lane contact, with frontage and depth measured from the boundary; City of Toronto land in City use, which is not a home.
  • House and yards: Footprint and roof height of the house and other buildings, and the yard behind the house, from the City's 3D Massing (updated yearly, illustrative).
  • City trees in front of the lot: City-owned trees on the street allowance at this address, with species and trunk diameter. Private trees on the lot are not in open data.
  • Heritage: Heritage Register (listed and designated properties), Official Plan Amendment 720 properties and properties removed from the Register under the 2022 two-year limit.
  • TRCA regulated area: Valleys, floodplains, shorelines and wetlands regulated by the Toronto and Region Conservation Authority.
  • Ravines and natural features: Ravine and Natural Feature Protection area (Chapter 658, map last published 2019), Natural Heritage System and Environmentally Significant Areas.
  • Official Plan policies: Site and Area Specific Policies, Secondary Plans and Major Transit Station Areas covering the lot.
  • Rooming houses, short-term rentals and rental buildings: Multi-tenant house licences, short-term rental registrations and RentSafeTO evaluations at this address.
  • Neighbourhood context: Neighbourhood, 2021 Census figures, police-reported crime rates, schools, parks, TTC stops, cycling routes, serious collisions and traffic counts nearby. Area context only, not a finding about the lot.
  • Orders and by-law investigations: Outstanding Toronto Building orders, and by-law investigations open now or closed in the last two years. Fire and Public Health orders and older closed files are not published.
  • Address points: loaded Nov 29, 2026, published Nov 27, 2026
  • Toronto Building orders: loaded Nov 28, 2026, published Nov 27, 2026
  • Neighbourhood Profiles, 2021 Census: loaded Oct 14, 2026, published Oct 6, 2023
  • Street centrelines: loaded Nov 29, 2026, published Nov 27, 2026
  • City-owned land: loaded Nov 29, 2026, published Nov 23, 2026
  • Committee of Adjustment open applications: loaded Nov 29, 2026, published Nov 28, 2026
  • Committee of Adjustment decisions: loaded Nov 29, 2026, published Nov 28, 2026
  • Committee of Adjustment decisions 2001-2016: loaded Oct 14, 2026, published Feb 20, 2026
  • Collisions with people killed or seriously injured (Toronto Police Service): loaded Nov 29, 2026, published Nov 28, 2026
  • Neighbourhood crime rates (Toronto Police Service): loaded Oct 14, 2026, published Feb 20, 2026
  • Cycling network: loaded Nov 22, 2026, published Nov 16, 2026
  • Development applications: loaded Nov 29, 2026, published Nov 29, 2026
  • Environmentally Significant Areas: loaded Oct 14, 2026, published Mar 16, 2026
  • Green spaces: loaded Nov 29, 2026, published Nov 24, 2026
  • Heritage register: loaded Oct 14, 2026, published Sep 1, 2026
  • Former heritage listings: loaded Oct 14, 2026, published Jul 3, 2025
  • Official Plan Amendment 720 heritage list: loaded Nov 29, 2026, published Nov 23, 2026
  • 3D Massing building footprints: loaded Oct 14, 2026, published Dec 2, 2025
  • By-law investigation addresses: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigation deficiencies: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigations: loaded Nov 29, 2026, published Nov 28, 2026
  • Major Transit Station Areas: loaded Oct 14, 2026, published Feb 3, 2026
  • Natural Heritage System: loaded Oct 14, 2026, published Mar 16, 2026
  • Neighbourhoods: loaded Oct 14, 2026, published Feb 20, 2026
  • Property boundaries: loaded Nov 27, 2026, published Nov 27, 2026
  • Active building permits: loaded Nov 29, 2026, published Nov 28, 2026
  • Cleared building permits: loaded Nov 29, 2026, published Nov 28, 2026
  • Cleared building permits 2000-2016: loaded Oct 14, 2026, published Jul 8, 2025
  • Preliminary zoning reviews: loaded Nov 29, 2026, published Nov 28, 2026
  • Ravine and natural feature protection: loaded Oct 14, 2026, published Jul 23, 2019
  • RentSafeTO evaluations: loaded Nov 29, 2026, published Nov 28, 2026
  • Multi-tenant house licences: loaded Nov 29, 2026, published Nov 28, 2026
  • Site and Area Specific Policies: loaded Oct 14, 2026, published Mar 16, 2026
  • School locations: loaded Oct 14, 2026, published May 27, 2026
  • Secondary Plans: loaded Oct 14, 2026, published Mar 16, 2026
  • Street trees: loaded Nov 29, 2026, published Nov 23, 2026
  • Short-term rental registrations: loaded Nov 29, 2026, published Nov 28, 2026
  • Traffic counts at intersections: loaded Nov 29, 2026, published Nov 28, 2026
  • TRCA regulation limit: loaded Oct 14, 2026, published Apr 29, 2026
  • TTC stops (GTFS): loaded Nov 8, 2026, published Nov 5, 2026
  • Zoning by-law: loaded Nov 29, 2026, published Nov 23, 2026
  • Lot coverage overlay: loaded Nov 29, 2026, published Nov 23, 2026
  • Height overlay: loaded Nov 29, 2026, published Nov 23, 2026
  • Parking zone overlay: loaded Nov 29, 2026, published Nov 23, 2026
  • Policy area overlay: loaded Nov 29, 2026, published Nov 23, 2026
  • Priority retail streets: loaded Nov 29, 2026, published Nov 23, 2026
  • Rooming house overlay: loaded Nov 29, 2026, published Nov 23, 2026
  • Zoning setbacks: loaded Nov 29, 2026, published Nov 23, 2026

Contains information licensed under the Open Government Licence – Toronto. TRCA regulation limit © TRCA.

Screening tool based on City of Toronto and TRCA open data. Not a zoning review or legal opinion. Site-specific exceptions, amendments not yet in the open data, minor variances and other by-laws can change the answer. Confirm with a Preliminary Project Review or Zoning Certificate from Toronto Building before buying or designing.

Flag an error

What is not right?

The problem

The records come from the City's open data; we check each flag against them. Your email is used only to answer this.