Everything here comes from public records: City of Toronto open data, TRCA and Statistics Canada, 15 sets in all. Each item leads to the record it comes from. Our sources
This house at a glance
Each score from 0 to 10: 0 needs attention, 10 all clear. Build potential is how much more you could add.
About 15 Ross St
15 Ross St is on a 10.7 m by 34.4 m lot on Ross St in Kensington-Chinatown. The zoning is R. A site-specific exception, 900.2.10(835), changes some of the usual rules for this address.
The City has 6 records on this lot since 1998. That is more than at 95% of Toronto houses. In 2019, a building permit was filed: "Revised scope of work - interior alterations to an existing residential building with 3-dwelling units, and addition of a basement walkout and door on the 2nd…". Status: under review. In 2009, a building permit was filed: "Proposal to repair and replace framing members at the rear of the property on all floors. the construction is to include the repair of foundation walls…". Status: closed. In 1998, a building permit was filed: "Install 1 l.t. on 2nd floor; 1 l.t., 1 h.w.t.. see bp# 418774". Status: closed. There are 2 open orders or by-law investigations on file. Ask the seller what is outstanding and whether it will be fixed before closing.
Within 300 m, 2 development applications are open (the tallest up to 31 storeys). Queen's Park station is a 8-minute walk, and the lot is in its Major Transit Station Area.
Summary
What the City's records show on this house
- 2 open orders or by-law investigationsSerious
- Work or applications in progressModerateFree check
- Records mention multiplexModerateFree check
- Site-specific exception 900.2.10(835)Moderate
- Registered short-term rentalModerate
- 1 by-law investigation closed in the last two yearsLow
- 2 development applications open within 300 mLowFree check
- 1 City tree in front of this lotLowFree check
- Downtown Plan Secondary PlanLow
Left unchecked, any of these can mean unexpected costs, trouble after closing, or plans you can't carry out. Found before you offer, they give you room to negotiate. The full report explains what each one means for this house and what to do next.
15 sets of public records, already checked for you. Searching each one yourself and working out what it means for you takes time. We have done that work: what matters about this house and lot, in plain English, in a few minutes.
What to find out first
3 things to check before you offer, 1 of them serious.
What to find out before an offer, the steps to take, what each costs and how long it takesUnlock
Open City files
How much in the City's records needs answers before an offer
- 2 open orders or by-law investigations
- Work or applications in progress
- Records mention multiplex
What this part means for this house, in plain EnglishUnlock
2 open orders or by-law investigations
SeriousCheck before you offerWhat the record shows, what it means for you and what to doUnlock
Work or applications in progress
ModerateCheck before you offerSee the open permit check for this house
What the record shows, what it means for you and what to doUnlock
Records mention multiplex
ModerateCheck before you offerSee the basement apartment check for this house
What the record shows, what it means for you and what to doUnlock
Registered short-term rental
ModerateCheck if it appliesWhat the record shows, what it means for you and what to doUnlock
1 by-law investigation closed in the last two years
LowCheck if it appliesWhat the record shows, what it means for you and what to doUnlock
What this means: Toronto zoning by addressWhat this means: Building permits before buying
City files on this lot
6 records on file, more than at 95% of Toronto houses (median 0 records).
| Date | Record | As the City filed it | In plain words | Status |
|---|---|---|---|---|
| 2026-09-15 | By-law investigation26 237942 ZON 00 IR | Zoning | Rescheduled | |
| 2025-03-24 | By-law investigation25 133584 ZON 00 IR | Zoning | Closed | |
| 2020-06-05 | Building order20 153501 WNP 00 VI | Order Issued No Permit: On the south side of building a portion of Fire Escape has been added to existing Fire Escape at 2nd floor level in preparation to install an exit door for a second exit. Also, hole is being dug on same side to install a second exit for a basement unit wi | Order Issued | |
| 2019-05-28 | Building permit19 161084 | Revised SCOPE of WORK - Interior Alterations to an Existing Residential Building with 3-Dwelling Units, and addition of a basement walkout and door on the 2nd level. (May_2020). | Under Review | |
| 2009-04-03 | Building permit09 105366 | Proposal to repair and replace framing members at the rear of the property on all floors. The construction is to include the repair of foundation walls, replacement of floor joists and the repair of the roof at the rear portion of the building, the work proposed is focused on the rear area as shown on the drawings. | Closed | |
| 1998-12-15 | Building permit98 024853 | INSTALL 1 L.T. ON 2ND FLOOR; 1 L.T., 1 H.W.T.. SEE BP# 418774 | Closed |
Restrictions
How much heritage, nature and site-specific rules limit changes to the house
- Site-specific exception 900.2.10(835)
- No heritage listing or designation
What this part means for this house, in plain EnglishUnlock
Site-specific exception 900.2.10(835)
ModerateCheck if it appliesWhat the record shows, what it means for you and what to doUnlock
1 City tree in front of this lot
LowFor later, once you own itSee the tree permit check for this house
What the record shows, what it means for you and what to doUnlock
Downtown Plan Secondary Plan
LowFor later, once you own itWhat the record shows, what it means for you and what to doUnlock
If you want to change or build
What the site-specific rules mean for an addition, a garage or a rebuild.
Site-specific exception 900.2.10(835)
What the exception changes for this address, rule by ruleUnlock
Flood and erosion rules
How much of the lot lies in the areas TRCA regulates for flooding and erosion
- Outside the areas TRCA regulates
From TRCA's regulated areas only. Basement flooding, sewer back-up and the TRCA flood plain are not in this score yet; ask the seller and your insurer about water in the basement.
What this part means for this house, in plain EnglishUnlock
Build potential
How much more the rules allow on this lot, beyond what is on record
- On record: multiplex
- No public lane, so no laneway suite
What this part means for this house, in plain EnglishUnlock
The lot and what the rules allow
- Zone
- R (f4.5; d1.0) (x835)
- Height limit
- 13 m
- Corner lot
- No
- Public lane
- None
- New house permit
- None since 2000
- House footprint
- 204 m²
- Back yard
- 6.5 m
- Buildings on the lot
- 1
House and yards from the City's 3D Massing; a survey gives exact figures.
What you can build
Why, measured on this lot, and the most you could buildUnlock
Building nearby
How much neighbours are building and applying to change within 300 m
- 2 development applications open within 300 m, up to 31 storeys
- In the Queens Park station area
- 29 suite and multiplex permits within 300 m in 10 years
What this part means for this house, in plain EnglishUnlock
2 development applications open within 300 m
LowCheck if it appliesSee the next door check for this house
What the record shows, what it means for you and what to doUnlock
What this means: Committee of Adjustment
What the City allowed next door
Within 500 m, last 10 years: a guide if you plan to build or apply for something similar.
What neighbours have built and changed around you, and how the City decidedUnlock
Area safety
Police-reported crime in the neighbourhood against the Toronto median
- Lower than the Toronto median in 1 of 7 categories
- Theft over $5,000: 4.8 times the Toronto median
- Theft from vehicles: 4.5 times the Toronto median
- Assault: 3.2 times the Toronto median
- Robbery: 2.8 times the Toronto median
- Break and enter: 2.6 times the Toronto median
- Shootings: 2.1 times the Toronto median
Neighbourhood rates per 100,000 people from the Toronto Police Service, not this street.
What this part means for this house, in plain EnglishUnlock
Kensington-Chinatown neighbourhood
About the area, not this house.
2021 Census, against the median Toronto neighbourhood
Getting around and schools
- Queen's Park StationNearest station8 min walk
- College St at Beverley StNearest TTC stop2 min walk
- Beverley StNearest cycling route1 min walk
- Braemar College Private Secondary SchoolSchool2 min walk
- Beverley & Subway Academy TwoSchool3 min walk
- Ronald McDonald HouseSchool4 min walk
- Cornerstone Preparatory School - Main CampusSchool5 min walk
Police-reported crime, 2025, per 100,000 people
- Assaultcity median 636.32017.5
- Robberycity median 69.5193
- Shootingscity median 10.521.9
- Auto theftcity median 192.6118.4
- Theft over $5,000city median 46.1219.3
- Break and entercity median 172.8443
- Theft from vehiclescity median 188.1850.8
Ready emails
Copy and send as they are.
7 questions for the seller and your lawyer, written outUnlock
What we checked, and what the City's records don't cover
We checked 48 sets of City of Toronto, TRCA and Statistics Canada open data for this address, last updated Nov 27, 2026. Our records don't cover flooding history, ownership and mortgages, or the condition of the house: ask the seller and your insurer about water in the basement, your lawyer about title, and book a home inspection.
See every source and when we loaded it · Pre-offer checklist