Everything here comes from public records: City of Toronto open data, TRCA and Statistics Canada, 15 sets in all. Each item leads to the record it comes from. Our sources

This house at a glance

Each score from 0 to 10: 0 needs attention, 10 all clear. Build potential is how much more you could add.

About 15 Glen Morris St

15 Glen Morris St is on a 7.8 m by 32.5 m lot on Glen Morris St in University. This lot is not covered by Toronto's city-wide zoning by-law 569-2013, so a by-law of the former city or borough most likely still applies. Toronto Building can confirm which one. The property is designated under Part IV of the Ontario Heritage Act, so changes to its heritage features need a City heritage permit.

The City has 18 records on this lot since 2002. That is more than at 99% of Toronto houses. In 2026, a Committee of Adjustment application was filed: "To alter the development standards for the eight-storey residential apartment building (approved under site specific zoning by-laws 879-2009(omb) and…". Status: postponed. In 2021, a building permit was filed: "Proposal to demolish existing rear detached garage due to unsafe condition". Status: closed. In 2017, a building permit was filed: "Replace 3 existing wood columns supporting the exterior porch roof with 3 new wood columns in the same locations". Status: inspection. An open permit means the City has not closed the file. Ask the seller whether the work was finished and passed its final inspection.

No development applications are open within 300 m. Within 300 m, the Committee of Adjustment decided 22 minor variance applications in the last 10 years and approved 91%. St George station is a 8-minute walk.

Summary

What the City's records show on this house

  • Building permit open since 2017ModerateFree check
  • Heritage property: designated (Part IV)Moderate
  • Work or applications in progressModerateFree check
  • Zoning not in By-law 569-2013Moderate
  • 7 by-law investigations closed in the last two yearsLow
  • 3 City trees in front of this lotLowFree check

Left unchecked, any of these can mean unexpected costs, trouble after closing, or plans you can't carry out. Found before you offer, they give you room to negotiate. The full report explains what each one means for this house and what to do next.

Unlock the full report

15 sets of public records, already checked for you. Searching each one yourself and working out what it means for you takes time. We have done that work: what matters about this house and lot, in plain English, in a few minutes.

What to find out first

4 things to check before you offer.

What to find out before an offer, the steps to take, what each costs and how long it takesUnlock

Check carefully

Open City files

How much in the City's records needs answers before an offer

  • Building permit open since 2017
  • Work or applications in progress
  • 7 by-law investigations closed in the last two years

What this part means for this house, in plain EnglishUnlock

  1. Building permit open since 2017

    ModerateCheck before you offer

    What the record shows, what it means for you and what to doUnlock

  2. Work or applications in progress

    ModerateCheck before you offer

    What the record shows, what it means for you and what to doUnlock

  3. 7 by-law investigations closed in the last two years

    LowCheck if it applies

    What the record shows, what it means for you and what to doUnlock

City files on this lot

18 records on file, more than at 99% of Toronto houses (median 0 records).

DateRecordAs the City filed itIn plain wordsStatus
2026-10-21Minor variance
A0747/26TEY
To alter the development standards for the eight-storey residential apartment building (approved under Site Specific Zoning By-Laws 879-2009(OMB) and 880-2009(OMB)), increasing the height (from 25.5 m to 26.1 m), and reducing the rear projection (at the rear of the building at levels three to eight). A Site Plan Control application (File Number 20 20 162492 STE 11 SA) is currently under review. There will be a total of 16 residential dwelling units within the apartment building on this lot.Pending
2026-08-10Zoning review
26 216984 ZAP
No description on fileNotice Sent
2026-07-09By-law investigation
26 198775 PRS 00 IR
Property StandardsClosed
2026-07-09By-law investigation
26 198768 LGW 00 IR
Long Grass and WeedsClosed
2026-04-21By-law investigation
26 147478 PRS 00 IR
Property StandardsClosed
2026-04-18By-law investigation
26 146157 PRS 00 IR
Property StandardsClosed
2025-12-21By-law investigation
25 268654 PRS 00 IR
Property StandardsClosed
2025-11-14By-law investigation
25 254312 PRS 00 IR
Property StandardsClosed
2025-10-25By-law investigation
25 244930 PRS 00 IR
Property StandardsClosed
2025-03-20By-law investigation
25 132465 PRS 00 IR
Property StandardsClosed
2022-04-06Zoning review
22 131448 ZAP
No description on fileNotice Sent
2021-12-20Building permit
21 250279
Construct 8 storey residential building with basement, 17 unitsCancelled
2021-10-13Building permit
21 209369
Proposal to demolish existing rear detached garage due to unsafe condition.Closed
2020-07-09Zoning review
20 162492 PSP
No description on fileClosed
2020-04-08Zoning review
20 130649 ZPR
No description on fileClosed
2017-12-21Building permit
17 203102
Replace 3 existing wood columns supporting the exterior porch roof with 3 new wood columns in the same locations.Inspection
2005-06-01Zoning review
05 137839 PSP
No description on fileClosed
2002-08-27Zoning review
02 167812 PRZ
No description on fileClosed
Some

Restrictions

How much heritage, nature and site-specific rules limit changes to the house

  • Heritage property: designated (Part IV)
  • Zoning not in By-law 569-2013

What this part means for this house, in plain EnglishUnlock

  1. Heritage property: designated (Part IV)

    ModerateCheck before you offer

    What the record shows, what it means for you and what to doUnlock

  2. Zoning not in By-law 569-2013

    ModerateCheck before you offer

    What the record shows, what it means for you and what to doUnlock

  3. 3 City trees in front of this lot

    LowFor later, once you own it

    What the record shows, what it means for you and what to doUnlock

Not on this lot

Flood and erosion rules

How much of the lot lies in the areas TRCA regulates for flooding and erosion

  • Outside the areas TRCA regulates

From TRCA's regulated areas only. Basement flooding, sewer back-up and the TRCA flood plain are not in this score yet; ask the seller and your insurer about water in the basement.

What this part means for this house, in plain EnglishUnlock

Little left to add

Build potential

How much more the rules allow on this lot, beyond what is on record

What this part means for this house, in plain EnglishUnlock

The lot and what the rules allow

N20 m
7.8 m frontage32.5 m deepon Glen Morris St
Zone
—
Height limit
—
Corner lot
No
Public lane
Ln E Spadina N Harbord, 47.1 m along it
House footprint
107 m²
Back yard
14.9 m
Buildings on the lot
1

House and yards from the City's 3D Massing; a survey gives exact figures.

What you can build

    Why, measured on this lot, and the most you could buildUnlock

    Some

    Building nearby

    How much neighbours are building and applying to change within 300 m

    • 9 development applications within 300 m in 10 years, none open
    • 9 suite and multiplex permits within 300 m in 10 years
    • 22 minor variance decisions within 300 m, 91% approved

    What this part means for this house, in plain EnglishUnlock

    What the City allowed next door

    Within 500 m, last 10 years: a guide if you plan to build or apply for something similar.

    What neighbours have built and changed around you, and how the City decidedUnlock

    Crime well above median

    Area safety

    Police-reported crime in the neighbourhood against the Toronto median

    • Lower than the Toronto median in 1 of 7 categories
    • Break and enter: 4.2 times the Toronto median
    • Assault: 2.7 times the Toronto median
    • Theft over $5,000: 2.6 times the Toronto median
    • Homicide: 2.3 times the Toronto median
    • Robbery: 1.9 times the Toronto median
    • Theft from vehicles: 1.9 times the Toronto median

    Neighbourhood rates per 100,000 people from the Toronto Police Service, not this street.

    What this part means for this house, in plain EnglishUnlock

    University neighbourhood

    About the area, not this house.

    2021 Census, against the median Toronto neighbourhood

    Median household income (2020)$80,000median $84,500
    Households that own their home39%median 54%
    Population (2021)6,435median 16,813
    Homes built in 1960 or before59%median 29%
    Homes needing major repairs11%median 7%

    Getting around and schools

    • St George StationNearest station8 min walk
    • Spadina Ave at Harbord St North SideNearest TTC stop1 min walk
    • Harbord StNearest cycling route1 min walk
    • Rotman School of Management - U of T, Bldg 134School5 min walk
    • University of Toronto SchoolsSchool5 min walk
    • Paul Penna Downtown Jewish Day School & Miles Nadal Jewish Community CentreSchool6 min walk
    • School of Continuing Studies - U of T, Bldg 103School6 min walk

    Police-reported crime, 2025, per 100,000 people

    • Assaultcity median 636.31740.5
    • Robberycity median 69.5133.9
    • Homicidecity median 5.312.2
    • Auto theftcity median 192.6182.6
    • Theft over $5,000city median 46.1121.7
    • Break and entercity median 172.8730.3
    • Theft from vehiclescity median 188.1353

    More about University

    Ready emails

    Copy and send as they are.

    6 questions for the seller and your lawyer, written outUnlock

    What we checked, and what the City's records don't cover

    We checked 48 sets of City of Toronto, TRCA and Statistics Canada open data for this address, last updated Nov 27, 2026. Our records don't cover flooding history, ownership and mortgages, or the condition of the house: ask the seller and your insurer about water in the basement, your lawyer about title, and book a home inspection.

    See every source and when we loaded it · Pre-offer checklist

    Something here not right?

    Screening tool based on City of Toronto and TRCA open data. Not a zoning review or legal opinion. Site-specific exceptions, amendments not yet in the open data, minor variances and other by-laws can change the answer. Confirm with a Preliminary Project Review or Zoning Certificate from Toronto Building before buying or designing.

    Scores calibrated on Toronto house lots on 2026-10-19; prices and sources checked on 2026-10-06. Contains information licensed under the Open Government Licence – Toronto. TRCA regulation limits © Toronto and Region Conservation Authority.

    Full pre-offer report · 15 Glen Morris St

    4 things to check at 15 Glen Morris St before you offer

    • Building permit open since 2017Moderate
    • Heritage property: designated (Part IV)Moderate
    • Work or applications in progressModerate
    • Zoning not in By-law 569-2013Moderate
    • and 2 more

    The report explains what each one can cost you on this house and what to ask the seller or the City before you offer.

    $29 CAD one time · opens right away

    See a sample report

    Full refund within 30 days if the report left out or misstated a City record on the lot. Refund policy

    Also in the report

    • A PDF to forward to your agent and lawyer
    • What you can build on this lot, measured on it
    • Every line linked to the City record it comes from
    • 15 sets of public records, already searched and read for you
    • A clear list of the 10 steps to take before you offer, so nothing slips
    • What each of the 6 findings can cost you or stop you doing, in plain English
    • A two-minute summary of this house, and what to find out first before you offer
    • What the City allowed your neighbours, a guide if you plan to build or apply for something similar
    • We watch this address for 90 days. If anything changes in the City's records, we email you the same day
    • A short summary of each part: City files, restrictions, flood and erosion, build potential, building nearby, area safety

    By paying you agree to the terms of use and the refund policy. Payment by Stripe. The report opens right after payment, and we email you a link to it; your account is made from the email you pay with. A screening of public records, not a legal opinion or a home inspection.

    Flag an error

    What is not right?

    The problem

    The records come from the City's open data; we check each flag against them. Your email is used only to answer this.