HousePrecheckCheck an address

15 Barberry PlBayview Village, Toronto · City records before you offer

Residential apartment · RA (f30.0; a1375) (x116)≈ 23.6 × 73.4 m1,253 m²on Barberry Plcorner, also on Thomas Clark Way

1 thing to check before you offer, including work or applications in progress
N20 m
≈ 23.6 m frontage≈ 73.4 m deepirregular lot, estimated

Everything here comes from public records: City of Toronto open data, TRCA and Statistics Canada, 15 sets in all. Each item leads to the record it comes from. Our sources

This house at a glance

Each score from 0 to 10: 0 needs attention, 10 all clear. Build potential is how much more you could add.

About 15 Barberry Pl

15 Barberry Pl is on a 23.6 m by 73.4 m lot on Barberry Pl in Bayview Village. The zoning is RA. A site-specific exception, 900.7.10(116), changes some of the usual rules for this address. The lot also fronts Thomas Clark Way.

The City has 15 records on this lot since 2001. That is more than at 99% of Toronto houses. In 2024, a building permit was filed: "Proposal for addition of new three elevator and 3 season room and interior alterations in levels 1-8". Status: under review. In 2023, a building permit was filed: "Remove new non load bearing partition wall, add new pocket door to existing washroom". Status: closed. In 2023, a Committee of Adjustment application was filed: "Proposal to construct an exterior elevation addition, roof terrace renovations, and interior alterations t the existing building, to convert 16 assisted living…". Status: closed. Nothing on file is open right now.

Within 300 m, 5 development applications are open (the tallest up to 56 storeys). Within 300 m, the Committee of Adjustment decided 4 minor variance applications in the last 10 years and approved 100%. Bayview station is a 5-minute walk, and the lot is in its Major Transit Station Area.

Summary

What the City's records show on this house

  • Work or applications in progressModerateFree check
  • Site-specific exception 900.7.10(116)Moderate
  • 5 development applications open within 300 mLowFree check
  • Minimum lot area 1375 m²Low
  • 4 City trees in front of this lotLowFree check
  • Sheppard East Subway Corridor Secondary PlanLow
  • 5 Committee of Adjustment files on this lotLowFree check

Left unchecked, any of these can mean unexpected costs, trouble after closing, or plans you can't carry out. Found before you offer, they give you room to negotiate. The full report explains what each one means for this house and what to do next.

Unlock the full report

15 sets of public records, already checked for you. Searching each one yourself and working out what it means for you takes time. We have done that work: what matters about this house and lot, in plain English, in a few minutes.

What to find out first

1 thing to check before you offer.

What to find out before an offer, the steps to take, what each costs and how long it takesUnlock

A few questions

Open City files

How much in the City's records needs answers before an offer

  • Work or applications in progress
  • No open orders or by-law investigations
  • No permits left open for years

What this part means for this house, in plain EnglishUnlock

  1. Work or applications in progress

    ModerateCheck before you offer

    What the record shows, what it means for you and what to doUnlock

  2. 5 Committee of Adjustment files on this lot

    LowFor later, once you own it

    What the record shows, what it means for you and what to doUnlock

City files on this lot

15 records on file, more than at 99% of Toronto houses (median 0 records).

DateRecordAs the City filed itIn plain wordsStatus
2026-05-11By-law investigation
26 158214 WST 00 IR
WasteClosed
2024-10-01Building permit
24 220606
Proposal for addition of new three elevator and 3 season room and interior alterations in levels 1-8Under Review
2023-12-07Building permit
23 223832
Remove new non load bearing partition wall, add new pocket door to existing washroom.Closed
2023-10-12Minor variance
A0786/22NY
Proposal to construct an exterior elevation addition, roof terrace renovations, and interior alterations t the existing building, to convert 16 Assisted Living Suites to 21 Memory Care Suites, add an elevator, covert a portion of the existing third floor terrace into a three season room, and adjust parking ratios. Please note, the application was deferred on February 16, 2023, to allow the applicant to address Transportation concerns.Approved
2023-08-01Minor variance
SYS 5312158
No description on filePending
2022-06-27Zoning review
22 168297 ZAP
No description on fileClosed
2021-05-18Building permit
20 152211
Proposal to construct a new storage room in the underground parkingClosed
2021-04-01Minor variance
A0072/21NY
To construct a new storage room in the underground parkingApproved
2020-11-24Building permit
20 212672
add door closures controlled by fire alarmClosed
2008-01-16Minor variance
A0815/07NY
To permit residents of the existing seniors' condominium attached to retirement home building to use a common dining facility.Approved
2003-10-14Zoning review
03 185334 LTO
No description on fileClosed
2003-09-19Zoning review
03 176475 LTO
No description on fileClosed
2002-12-17Consent (lot split)
B061/02NY
This is an application under Section 50, 53 and 54 of the Planning Act for the Consent of the Secretary-Treasurer to the granting of easements and rights-of-way.Approved
2001-10-03Building permit
01 180252
DEMOLISHING OF A SINGLE FAMILY DWELLINGClosed
2001-01-17Zoning review
01 103683 000
No description on fileClosed
Clear

Restrictions

How much heritage, nature and site-specific rules limit changes to the house

  • Site-specific exception 900.7.10(116)
  • No heritage listing or designation

What this part means for this house, in plain EnglishUnlock

  1. Site-specific exception 900.7.10(116)

    ModerateCheck if it applies

    What the record shows, what it means for you and what to doUnlock

  2. 4 City trees in front of this lot

    LowFor later, once you own it

    What the record shows, what it means for you and what to doUnlock

  3. Sheppard East Subway Corridor Secondary Plan

    LowFor later, once you own it

    What the record shows, what it means for you and what to doUnlock

If you want to change or build

What the site-specific rules mean for an addition, a garage or a rebuild.

Site-specific exception 900.7.10(116)

What the exception changes for this address, rule by ruleUnlock

Not on this lot

Flood and erosion rules

How much of the lot lies in the areas TRCA regulates for flooding and erosion

  • Outside the areas TRCA regulates

From TRCA's regulated areas only. Basement flooding, sewer back-up and the TRCA flood plain are not in this score yet; ask the seller and your insurer about water in the basement.

What this part means for this house, in plain EnglishUnlock

Little left to add

Build potential

How much more the rules allow on this lot, beyond what is on record

What this part means for this house, in plain EnglishUnlock

  1. Minimum lot area 1375 m²

    LowFor later, once you own it

    What the record shows, what it means for you and what to doUnlock

The lot and what the rules allow

N20 m
≈ 23.6 m frontage≈ 73.4 m deepon Barberry Pl
Zone
RA (f30.0; a1375) (x116)
Height limit
—
Lot coverage limit
35%
Corner lot
Yes, also on Thomas Clark Way
Public lane
None
House footprint
812 m²
Back yard
1.8 m
Buildings on the lot
1

House and yards from the City's 3D Massing; a survey gives exact figures.

What you can build

    Why, measured on this lot, and the most you could buildUnlock

    Busy

    Building nearby

    How much neighbours are building and applying to change within 300 m

    • 5 development applications open within 300 m, up to 56 storeys
    • In the Bayview station area
    • 4 minor variance decisions within 300 m, 100% approved

    What this part means for this house, in plain EnglishUnlock

    1. 5 development applications open within 300 m

      LowCheck if it applies

      What the record shows, what it means for you and what to doUnlock

    What the City allowed next door

    Within 500 m, last 10 years: a guide if you plan to build or apply for something similar.

    What neighbours have built and changed around you, and how the City decidedUnlock

    Crime below median

    Area safety

    Police-reported crime in the neighbourhood against the Toronto median

    • Lower than the Toronto median in 4 of 6 categories

    Neighbourhood rates per 100,000 people from the Toronto Police Service, not this street.

    What this part means for this house, in plain EnglishUnlock

    Bayview Village neighbourhood

    About the area, not this house.

    2021 Census, against the median Toronto neighbourhood

    Median household income (2020)$83,000median $84,500
    Households that own their home60%median 54%
    Population (2021)22,330median 16,813
    Homes built in 1960 or before10%median 29%
    Homes needing major repairs6%median 7%

    Getting around and schools

    • Bayview StationNearest station5 min walk
    • Sheppard Ave East at Barberry PlNearest TTC stop2 min walk
    • Sheppard Ave ENearest cycling route8 min walk
    • St George AcademySchool2 min walk
    • North York LincSchool8 min walk
    • St Gabriel Catholic Elementary SchoolSchool10 min walk
    • Elkhorn Public SchoolSchool10 min walk

    Police-reported crime, 2025, per 100,000 people

    • Assaultcity median 636.3439.5
    • Robberycity median 69.556.6
    • Auto theftcity median 192.6139.8
    • Theft over $5,000city median 46.149.9
    • Break and entercity median 172.8176.4
    • Theft from vehiclescity median 188.1169.8

    More about Bayview Village

    Ready emails

    Copy and send as they are.

    2 questions for the seller and your lawyer, written outUnlock

    What we checked, and what the City's records don't cover

    We checked 48 sets of City of Toronto, TRCA and Statistics Canada open data for this address, last updated Nov 28, 2026. Our records don't cover flooding history, ownership and mortgages, or the condition of the house: ask the seller and your insurer about water in the basement, your lawyer about title, and book a home inspection.

    See every source and when we loaded it · Pre-offer checklist

    Something here not right?

    Screening tool based on City of Toronto and TRCA open data. Not a zoning review or legal opinion. Site-specific exceptions, amendments not yet in the open data, minor variances and other by-laws can change the answer. Confirm with a Preliminary Project Review or Zoning Certificate from Toronto Building before buying or designing.

    Scores calibrated on Toronto house lots on 2026-10-19; prices and sources checked on 2026-10-06. Contains information licensed under the Open Government Licence – Toronto. TRCA regulation limits © Toronto and Region Conservation Authority.

    Full pre-offer report · 15 Barberry Pl

    1 thing to check at 15 Barberry Pl before you offer

    • Work or applications in progressModerate
    • Site-specific exception 900.7.10(116)Moderate
    • 5 development applications open within 300 mLow
    • Minimum lot area 1375 m²Low
    • and 3 more

    The report explains what each one can cost you on this house and what to ask the seller or the City before you offer.

    $29 CAD one time · opens right away

    See a sample report

    Full refund within 30 days if the report left out or misstated a City record on the lot. Refund policy

    Also in the report

    • A PDF to forward to your agent and lawyer
    • What you can build on this lot, measured on it
    • Every line linked to the City record it comes from
    • 15 sets of public records, already searched and read for you
    • A clear list of the 3 steps to take before you offer, so nothing slips
    • What each of the 7 findings can cost you or stop you doing, in plain English
    • A two-minute summary of this house, and what to find out first before you offer
    • What the City allowed your neighbours, a guide if you plan to build or apply for something similar
    • We watch this address for 90 days. If anything changes in the City's records, we email you the same day
    • A short summary of each part: City files, restrictions, flood and erosion, build potential, building nearby, area safety

    By paying you agree to the terms of use and the refund policy. Payment by Stripe. The report opens right after payment, and we email you a link to it; your account is made from the email you pay with. A screening of public records, not a legal opinion or a home inspection.

    Flag an error

    What is not right?

    The problem

    The records come from the City's open data; we check each flag against them. Your email is used only to answer this.