HousePrecheckCheck an address

146 Yonge StYonge-Bay Corridor, Toronto · City records before you offer

Commercial residential · CR 12.0 (c8.0; r11.7) SS1 (x1590)8.4 × 31.1 m257 m²on Yonge St

1 thing to check before you offer, including work or applications in progress
N10 m
8.4 m frontage31.1 m deep

Everything here comes from public records: City of Toronto open data, TRCA and Statistics Canada, 15 sets in all. Each item leads to the record it comes from. Our sources

This house at a glance

Each score from 0 to 10: 0 needs attention, 10 all clear. Build potential is how much more you could add.

About 146 Yonge St

146 Yonge St is on a 8.4 m by 31.1 m lot on Yonge St in Yonge-Bay Corridor. The zoning is CR. A site-specific exception, 900.11.10(1590), changes some of the usual rules for this address.

The City has 12 records on this lot since 2002. That is more than at 99% of Toronto houses. In 2026, a building permit was filed: "Proposed interior alteration to convert the existing office space to a physiotherapy and rehabilitation clinic". Status: inspection. In 2024, a building permit was filed: "Proposed interior alterations to the basement and ground floor, new partition walls, ceilings, doors, plumbing, hvac system, and modification of existing…". Status: closed. In 2021, a building permit was filed: "Revision 04 - revise title/name to basement washroom, second and third floor to new, layout configuration of the fourth floorproposed interior alterations to 3…". Status: closed. An open permit means the City has not closed the file. Ask the seller whether the work was finished and passed its final inspection.

Within 300 m, 11 development applications are open (the tallest up to 80 storeys). Within 300 m, the Committee of Adjustment decided 12 minor variance applications in the last 10 years and approved 100%. Queen station is a 2-minute walk, and the lot is in its Major Transit Station Area.

Summary

What the City's records show on this house

  • Work or applications in progressModerateFree check
  • Site-specific exception 900.11.10(1590)Moderate
  • 11 development applications open within 300 mLowFree check
  • Priority retail street: Yonge StreetLow
  • Site and Area Specific Policy 224Low
  • Downtown Plan Secondary PlanLow
  • 1 Committee of Adjustment file on this lotLowFree check

Left unchecked, any of these can mean unexpected costs, trouble after closing, or plans you can't carry out. Found before you offer, they give you room to negotiate. The full report explains what each one means for this house and what to do next.

Unlock the full report

15 sets of public records, already checked for you. Searching each one yourself and working out what it means for you takes time. We have done that work: what matters about this house and lot, in plain English, in a few minutes.

What to find out first

1 thing to check before you offer.

What to find out before an offer, the steps to take, what each costs and how long it takesUnlock

A few questions

Open City files

How much in the City's records needs answers before an offer

  • Work or applications in progress
  • No open orders or by-law investigations
  • No permits left open for years

What this part means for this house, in plain EnglishUnlock

  1. Work or applications in progress

    ModerateCheck before you offer

    What the record shows, what it means for you and what to doUnlock

  2. 1 Committee of Adjustment file on this lot

    LowFor later, once you own it

    What the record shows, what it means for you and what to doUnlock

City files on this lot

12 records on file, more than at 99% of Toronto houses (median 0 records).

DateRecordAs the City filed itIn plain wordsStatus
2026-03-24Building permit
26 130028
PROPOSED INTERIOR ALTERATION TO CONVERT THE EXISTING OFFICE SPACE TO A PHYSIOTHERAPY AND REHABILITATION CLINIC.Inspection
2025-05-15By-law investigation
25 160085 WST 00 IR
WasteClosed
2024-03-21Building permit
24 123360
Proposed interior alterations to the basement and ground floor, new partition walls, ceilings, doors, plumbing, HVAC system, and modification of existing sprinkler layout.Closed
2021-09-23Building permit
18 218598
REVISION 04 - revise title/name to basement washroom, second and third floor to new, layout configuration of the fourth floorProposed interior alterations to 3 floors of existing non-residential building (base building).Closed
2021-09-08Building permit
21 154887
To erect and display one projecting sign.***THE LONDON BESPOKE CLUB***Closed
2021-04-20Building permit
21 128790
To erect and display one illuminated wall sign and one illuminated projecting signs.***CITY CANNABIS CO.***Closed
2021-01-19Building permit
20 234946
Proposal for interior tenant fit up on the second floor for a group E menswear and good boutique. Scope includes new partition walls minor hvac and plumbing modifications.Closed
2020-06-25Building permit
20 156940
Proposal for minor modifications to existing space to accommodate new retail store at ground floor and retail storage at basement level.Closed
2018-01-17Building permit
18 106023
Construct interior alterations to refinish walls (280m2)Cancelled
2015-07-22Minor variance
A0516/15TEY
To convert third floor office space into two residential dwelling units; thereby, creating a building containing office, commercial, retail and residential space.Approved
2015-03-02Zoning review
15 122627 ZPR
No description on fileClosed
2002-05-17Zoning review
02 137085 LTO
No description on fileClosed
Minor

Restrictions

How much heritage, nature and site-specific rules limit changes to the house

  • Site-specific exception 900.11.10(1590)
  • Priority retail street: Yonge Street
  • No heritage listing or designation

What this part means for this house, in plain EnglishUnlock

  1. Site-specific exception 900.11.10(1590)

    ModerateCheck if it applies

    What the record shows, what it means for you and what to doUnlock

  2. Priority retail street: Yonge Street

    LowFor later, once you own it

    What the record shows, what it means for you and what to doUnlock

  3. Site and Area Specific Policy 224

    LowFor later, once you own it

    What the record shows, what it means for you and what to doUnlock

  4. Downtown Plan Secondary Plan

    LowFor later, once you own it

    What the record shows, what it means for you and what to doUnlock

If you want to change or build

What the site-specific rules mean for an addition, a garage or a rebuild.

Site-specific exception 900.11.10(1590)

What the exception changes for this address, rule by ruleUnlock

Not on this lot

Flood and erosion rules

How much of the lot lies in the areas TRCA regulates for flooding and erosion

  • Outside the areas TRCA regulates

From TRCA's regulated areas only. Basement flooding, sewer back-up and the TRCA flood plain are not in this score yet; ask the seller and your insurer about water in the basement.

What this part means for this house, in plain EnglishUnlock

Little left to add

Build potential

How much more the rules allow on this lot, beyond what is on record

What this part means for this house, in plain EnglishUnlock

The lot and what the rules allow

N10 m
8.4 m frontage31.1 m deepon Yonge St
Zone
CR 12.0 (c8.0; r11.7) SS1 (x1590)
Height limit
76 m
Corner lot
No
Public lane
None
House footprint
250 m²
Back yard
0.7 m
Buildings on the lot
2

House and yards from the City's 3D Massing; a survey gives exact figures.

What you can build

    Why, measured on this lot, and the most you could buildUnlock

    Busy

    Building nearby

    How much neighbours are building and applying to change within 300 m

    • 11 development applications open within 300 m, up to 80 storeys
    • In the Dundas station area
    • 12 minor variance decisions within 300 m, 100% approved

    What this part means for this house, in plain EnglishUnlock

    1. 11 development applications open within 300 m

      LowCheck if it applies

      What the record shows, what it means for you and what to doUnlock

    What the City allowed next door

    Within 500 m, last 10 years: a guide if you plan to build or apply for something similar.

    What neighbours have built and changed around you, and how the City decidedUnlock

    Crime well above median

    Area safety

    Police-reported crime in the neighbourhood against the Toronto median

    • Lower than the Toronto median in 1 of 8 categories
    • Assault: 5.3 times the Toronto median
    • Theft over $5,000: 4.6 times the Toronto median
    • Robbery: 4.3 times the Toronto median
    • Break and enter: 3.2 times the Toronto median
    • Homicide: 2.3 times the Toronto median
    • Theft from vehicles: 2.1 times the Toronto median

    Neighbourhood rates per 100,000 people from the Toronto Police Service, not this street.

    What this part means for this house, in plain EnglishUnlock

    Yonge-Bay Corridor neighbourhood

    About the area, not this house.

    2021 Census, against the median Toronto neighbourhood

    Median household income (2020)$68,500median $84,500
    Households that own their home32%median 54%
    Population (2021)12,645median 16,813
    Homes built in 1960 or before2%median 29%
    Homes needing major repairs2%median 7%

    Getting around and schools

    • Queen StationNearest station2 min walk
    • Yonge St at Richmond St EastNearest TTC stop1 min walk
    • Temperance StNearest cycling route1 min walk
    • Victoria Street LincSchool2 min walk
    • Keystone International SchoolsSchool4 min walk
    • St Michael's Choir School - Gymnasium BldgSchool7 min walk
    • St Michael's Choir School - Choral BldgSchool7 min walk

    Police-reported crime, 2025, per 100,000 people

    • Assaultcity median 636.33361.1
    • Robberycity median 69.5300.1
    • Homicidecity median 5.312
    • Shootingscity median 10.512
    • Auto theftcity median 192.6162.1
    • Theft over $5,000city median 46.1210.1
    • Break and entercity median 172.8552.2
    • Theft from vehiclescity median 188.1402.1

    More about Yonge-Bay Corridor

    Ready emails

    Copy and send as they are.

    2 questions for the seller and your lawyer, written outUnlock

    What we checked, and what the City's records don't cover

    We checked 48 sets of City of Toronto, TRCA and Statistics Canada open data for this address, last updated Nov 27, 2026. Our records don't cover flooding history, ownership and mortgages, or the condition of the house: ask the seller and your insurer about water in the basement, your lawyer about title, and book a home inspection.

    See every source and when we loaded it · Pre-offer checklist

    Something here not right?

    Screening tool based on City of Toronto and TRCA open data. Not a zoning review or legal opinion. Site-specific exceptions, amendments not yet in the open data, minor variances and other by-laws can change the answer. Confirm with a Preliminary Project Review or Zoning Certificate from Toronto Building before buying or designing.

    Scores calibrated on Toronto house lots on 2026-10-19; prices and sources checked on 2026-10-06. Contains information licensed under the Open Government Licence – Toronto. TRCA regulation limits © Toronto and Region Conservation Authority.

    Full pre-offer report · 146 Yonge St

    1 thing to check at 146 Yonge St before you offer

    • Work or applications in progressModerate
    • Site-specific exception 900.11.10(1590)Moderate
    • 11 development applications open within 300 mLow
    • Priority retail street: Yonge StreetLow
    • and 3 more

    The report explains what each one can cost you on this house and what to ask the seller or the City before you offer.

    $29 CAD one time · opens right away

    See a sample report

    Full refund within 30 days if the report left out or misstated a City record on the lot. Refund policy

    Also in the report

    • A PDF to forward to your agent and lawyer
    • What you can build on this lot, measured on it
    • Every line linked to the City record it comes from
    • 15 sets of public records, already searched and read for you
    • A clear list of the 3 steps to take before you offer, so nothing slips
    • What each of the 7 findings can cost you or stop you doing, in plain English
    • A two-minute summary of this house, and what to find out first before you offer
    • What the City allowed your neighbours, a guide if you plan to build or apply for something similar
    • We watch this address for 90 days. If anything changes in the City's records, we email you the same day
    • A short summary of each part: City files, restrictions, flood and erosion, build potential, building nearby, area safety

    By paying you agree to the terms of use and the refund policy. Payment by Stripe. The report opens right after payment, and we email you a link to it; your account is made from the email you pay with. A screening of public records, not a legal opinion or a home inspection.

    Flag an error

    What is not right?

    The problem

    The records come from the City's open data; we check each flag against them. Your email is used only to answer this.