Everything here comes from public records: City of Toronto open data, TRCA and Statistics Canada, 15 sets in all. Each item leads to the record it comes from. Our sources
This house at a glance
Each score from 0 to 10: 0 needs attention, 10 all clear. Build potential is how much more you could add.
About 142 Roxborough St W
142 Roxborough St W is on a 11.2 m by 45.8 m lot on Roxborough St W in Annex. The zoning is R.
The City has 6 records on this lot since 2018. That is more than at 95% of Toronto houses. In 2023, a Committee of Adjustment application was filed: "To construct a new two-storey ancillary building (for three parking spaces and one laneway suite), with a front second storey balcony. this building will be…". Status: closed. In 2021, a building permit was filed: "Revision # 02 - omission of first and second floor rear balcony additions and landscaping minor, interior layout revision, exterior cladding and window size…". Status: revision issued. In 2018, a building permit was filed: "Revision to basement layout to add a 2nd unit to existing sfd-detached.building also reduced in size - ts". Status: revision issued. 2 open permits mean the City has not closed the files. Ask the seller whether the work was finished and passed its final inspection. There is 1 open order or by-law investigation on file. Ask the seller what is outstanding and whether it will be fixed before closing.
Within 300 m, 3 development applications are open (the tallest up to 38 storeys). Rosedale station is a 10-minute walk, and the lot is in its Major Transit Station Area.
Summary
What the City's records show on this house
- 1 open by-law investigationModerate
- 2 building permits open, the oldest since 2018ModerateFree check
- Records mention laneway suite, second unitModerateFree check
- 3 development applications open within 300 mLowFree check
- 1 City tree in front of this lotLowFree check
- Site and Area Specific Policy 211Low
- Downtown Plan Secondary PlanLow
- 1 Committee of Adjustment file on this lotLowFree check
Left unchecked, any of these can mean unexpected costs, trouble after closing, or plans you can't carry out. Found before you offer, they give you room to negotiate. The full report explains what each one means for this house and what to do next.
What the rules allow here: Multiplex up to 6 units · Garden suite · Laneway suite
15 sets of public records, already checked for you. Searching each one yourself and working out what it means for you takes time. We have done that work: what matters about this house and lot, in plain English, in a few minutes.
What to find out first
3 things to check before you offer.
What to find out before an offer, the steps to take, what each costs and how long it takesUnlock
Open City files
How much in the City's records needs answers before an offer
- 1 open by-law investigation
- 2 building permits open, the oldest since 2018
- Records mention laneway suite, second unit
What this part means for this house, in plain EnglishUnlock
1 open by-law investigation
ModerateCheck before you offerWhat the record shows, what it means for you and what to doUnlock
2 building permits open, the oldest since 2018
ModerateCheck before you offerSee the open permit check for this house
What the record shows, what it means for you and what to doUnlock
Records mention laneway suite, second unit
ModerateCheck before you offerSee the basement apartment check for this house
What the record shows, what it means for you and what to doUnlock
1 Committee of Adjustment file on this lot
LowFor later, once you own itSee the next door check for this house
What the record shows, what it means for you and what to doUnlock
What this means: Toronto zoning by addressWhat this means: Building permits before buyingWhat this means: Committee of Adjustment
City files on this lot
6 records on file, more than at 95% of Toronto houses (median 0 records).
| Date | Record | As the City filed it | In plain words | Status |
|---|---|---|---|---|
| 2026-11-17 | By-law investigation26 271239 RMH 00 IR | Rooming House | Rescheduled | |
| 2023-08-30 | Minor varianceA0596/23TEY | To construct a new two-storey ancillary building (for three parking spaces and one laneway suite), with a front second storey balcony. This building will be located in the rear yard, abutting the laneway. | Refused | |
| 2023-05-02 | Zoning review23 140389 ZAP | No description on file | Closed | |
| 2021-09-17 | Building permit19 114101 | Revision # 02 - omission of first and second floor rear balcony additions and landscaping minor, interior layout revision, exterior cladding and window size, roof details and structural roof framing. - For 1st and 2nd floor rear balcony additions and landscape changes.Proposal to construct 3-storey rear addition to existing 2-unit detached. Scope also includes 3rd floor deck. | Revision Issued | |
| 2018-12-20 | Building permit18 185923 | Revision to basement layout to add a 2nd unit to existing sfd-detached.Building also reduced in size - TS | Revision Issued | |
| 2018-08-28 | Zoning review18 216717 ZZC | No description on file | Cancelled |
Restrictions
How much heritage, nature and site-specific rules limit changes to the house
- No heritage listing or designation
- No site-specific zoning exception
What this part means for this house, in plain EnglishUnlock
1 City tree in front of this lot
LowFor later, once you own itSee the tree permit check for this house
What the record shows, what it means for you and what to doUnlock
Site and Area Specific Policy 211
LowFor later, once you own itWhat the record shows, what it means for you and what to doUnlock
Downtown Plan Secondary Plan
LowFor later, once you own itWhat the record shows, what it means for you and what to doUnlock
Flood and erosion rules
How much of the lot lies in the areas TRCA regulates for flooding and erosion
- Outside the areas TRCA regulates
From TRCA's regulated areas only. Basement flooding, sewer back-up and the TRCA flood plain are not in this score yet; ask the seller and your insurer about water in the basement.
What this part means for this house, in plain EnglishUnlock
Build potential
How much more the rules allow on this lot, beyond what is on record
- On record: second unit
- Multiplex up to 6 units: allowed
- Garden suite: likely fits
What this part means for this house, in plain EnglishUnlock
Multiplex up to 6 units
LowFor later, once you own itWhat the record shows, what it means for you and what to doUnlock
Garden suite
LowFor later, once you own itSee the garden suite check for this house
What the record shows, what it means for you and what to doUnlock
Laneway suite
LowFor later, once you own itWhat the record shows, what it means for you and what to doUnlock
The lot and what the rules allow
- Zone
- R (f7.5; d0.6)
- Height limit
- 13 m
- Corner lot
- No
- Public lane
- Ln S Macpherson W Molson, 11.2 m along it
- New house permit
- None since 2000
- House footprint
- 141 m²
- Back yard
- 24.4 m
- Buildings on the lot
- 1
House and yards from the City's 3D Massing; a survey gives exact figures.
What you can build
Why, measured on this lot, and the most you could buildUnlock
Building nearby
How much neighbours are building and applying to change within 300 m
- 3 development applications open within 300 m, up to 38 storeys
- In the Rosedale station area
- 18 suite and multiplex permits within 300 m in 10 years
What this part means for this house, in plain EnglishUnlock
3 development applications open within 300 m
LowCheck if it appliesSee the next door check for this house
What the record shows, what it means for you and what to doUnlock
What the City allowed next door
Within 500 m, last 10 years: a guide if you plan to build or apply for something similar.
What neighbours have built and changed around you, and how the City decidedUnlock
Area safety
Police-reported crime in the neighbourhood against the Toronto median
- Lower than the Toronto median in 3 of 8 categories
- Theft over $5,000: 2.5 times the Toronto median
- Break and enter: 2.2 times the Toronto median
- Assault: 1.7 times the Toronto median
Neighbourhood rates per 100,000 people from the Toronto Police Service, not this street.
What this part means for this house, in plain EnglishUnlock
Annex neighbourhood
About the area, not this house.
2021 Census, against the median Toronto neighbourhood
Getting around and schools
- Rosedale StationNearest station10 min walk
- Avenue Rd at Dupont StNearest TTC stop1 min walk
- Ramsden Park TrlNearest cycling route2 min walk
- Cottingham Jr Public SchoolSchool6 min walk
- De Lasalle College SchoolSchool9 min walk
- The Mabin SchoolSchool10 min walk
- Jesse Ketchum Jr & Sr Public SchoolSchool10 min walk
Police-reported crime, 2025, per 100,000 people
- Assaultcity median 636.31080.9
- Robberycity median 69.580.5
- Homicidecity median 5.35.2
- Shootingscity median 10.55.2
- Auto theftcity median 192.6116.9
- Theft over $5,000city median 46.1114.3
- Break and entercity median 172.8387.1
- Theft from vehiclescity median 188.1220.9
Ready emails
Copy and send as they are.
6 questions for the seller and your lawyer, written outUnlock
What we checked, and what the City's records don't cover
We checked 48 sets of City of Toronto, TRCA and Statistics Canada open data for this address, last updated Nov 27, 2026. Our records don't cover flooding history, ownership and mortgages, or the condition of the house: ask the seller and your insurer about water in the basement, your lawyer about title, and book a home inspection.
See every source and when we loaded it · Pre-offer checklist