HousePrecheckCheck an address

1416 Victoria Park AveVictoria Village, Toronto · City records before you offer

23.6 × 27.3 m641 m²on Victoria Park Avecorner, also on Sunrise Ave

2 things to check before you offer, including work or applications in progress
N10 m
23.6 m frontage27.3 m deep

Everything here comes from public records: City of Toronto open data, TRCA and Statistics Canada, 15 sets in all. Each item leads to the record it comes from. Our sources

This house at a glance

Each score from 0 to 10: 0 needs attention, 10 all clear. Build potential is how much more you could add.

About 1416 Victoria Park Ave

1416 Victoria Park Ave is on a 23.6 m by 27.3 m lot on Victoria Park Ave in Victoria Village. This lot is not covered by Toronto's city-wide zoning by-law 569-2013, so a by-law of the former city or borough most likely still applies. Toronto Building can confirm which one. The lot also fronts Sunrise Ave.

The City has 14 records on this lot since 2003. That is more than at 99% of Toronto houses. In 2025, a development application was filed: "A zoning bylaw amendment application that proposes the development of a 10-storey mixed-use building providing residential and commercial use at grade. the…". Status: under review. In 2004, a building permit was filed: "Interior alterations including new overhead doors for new service station". Status: closed. In 2026, a zoning review was filed. Status: not started. Nothing on file is open right now.

Within 300 m, 9 development applications are open (the tallest up to 50 storeys). Within 300 m, the Committee of Adjustment decided 2 minor variance applications in the last 10 years and approved 100%. O'Connor station is a 9-minute walk.

Summary

What the City's records show on this house

  • Work or applications in progressModerateFree check
  • Zoning not in By-law 569-2013Moderate
  • 9 development applications open within 300 mLowFree check

Left unchecked, any of these can mean unexpected costs, trouble after closing, or plans you can't carry out. Found before you offer, they give you room to negotiate. The full report explains what each one means for this house and what to do next.

Unlock the full report

15 sets of public records, already checked for you. Searching each one yourself and working out what it means for you takes time. We have done that work: what matters about this house and lot, in plain English, in a few minutes.

What to find out first

2 things to check before you offer.

What to find out before an offer, the steps to take, what each costs and how long it takesUnlock

A few questions

Open City files

How much in the City's records needs answers before an offer

  • Work or applications in progress
  • No open orders or by-law investigations
  • No permits left open for years

What this part means for this house, in plain EnglishUnlock

  1. Work or applications in progress

    ModerateCheck before you offer

    What the record shows, what it means for you and what to doUnlock

City files on this lot

14 records on file, more than at 99% of Toronto houses (median 0 records).

DateRecordAs the City filed itIn plain wordsStatus
2026-10-20Zoning review
25 180696 PRZ
No description on fileNot Started
2025-06-20Development application
25 180696 NNY 16 OZ
A Zoning Bylaw Amendment Application that proposes the development of a 10-storey mixed-use building providing residential and commercial use at grade. The building will provide a total of 77 residential units, being a mix of studio, 1-bedroom, 2-bedroom, 3-bedrooms. The building will also provide 2 retail units at grade. A paved access from Sunrise Ave will be provided, leading to 3 levels of below-grade parking, providing a total of 41 parking spaces; as well as 88 bicycle parking spaces. The proposed development provides a total GFA of 5,574.34 square metres and a FSI of 5.30. Additionally, the proposed development provides 162.39 square metres of indoor amenity space and 180.90 square metres of outdoor amenity space.Under Review
2013-02-05Zoning review
13 116271 LPR
No description on fileClosed
2008-05-28Zoning review
08 163341 LTO
No description on fileClosed
2008-03-26Zoning review
08 121879 LPR
No description on fileClosed
2007-09-24Zoning review
07 264327 LPR
No description on fileClosed
2006-05-04Zoning review
06 131614 LTO
No description on fileClosed
2004-11-18Zoning review
04 193568 ZPU
No description on fileClosed
2004-10-19Building permit
04 182650
Interior alterations including new overhead doors for new service station.Closed
2004-09-15Zoning review
04 174264 ZPU
No description on fileClosed
2004-09-08Zoning review
04 172305 000
No description on fileCancelled
2004-09-08Zoning review
04 172307 ZPU
No description on fileClosed
2004-04-14Zoning review
04 124686 ZPU
No description on fileClosed
2003-03-20Zoning review
03 116696 ZPU
No description on fileClosed
Minor

Restrictions

How much heritage, nature and site-specific rules limit changes to the house

  • Zoning not in By-law 569-2013
  • No heritage listing or designation

What this part means for this house, in plain EnglishUnlock

  1. Zoning not in By-law 569-2013

    ModerateCheck before you offer

    What the record shows, what it means for you and what to doUnlock

Not on this lot

Flood and erosion rules

How much of the lot lies in the areas TRCA regulates for flooding and erosion

  • Outside the areas TRCA regulates

From TRCA's regulated areas only. Basement flooding, sewer back-up and the TRCA flood plain are not in this score yet; ask the seller and your insurer about water in the basement.

What this part means for this house, in plain EnglishUnlock

Little left to add

Build potential

How much more the rules allow on this lot, beyond what is on record

What this part means for this house, in plain EnglishUnlock

The lot and what the rules allow

N20 m
23.6 m frontage27.3 m deepon Victoria Park Ave
Zone
—
Height limit
—
Corner lot
Yes, also on Sunrise Ave
Public lane
None
House footprint
208 m²
Back yard
4.6 m
Buildings on the lot
1

House and yards from the City's 3D Massing; a survey gives exact figures.

What you can build

    Why, measured on this lot, and the most you could buildUnlock

    Active

    Building nearby

    How much neighbours are building and applying to change within 300 m

    • 9 development applications open within 300 m, up to 50 storeys
    • 2 suite and multiplex permits within 300 m in 10 years
    • 2 minor variance decisions within 300 m, 100% approved

    What this part means for this house, in plain EnglishUnlock

    1. 9 development applications open within 300 m

      LowCheck if it applies

      What the record shows, what it means for you and what to doUnlock

    What the City allowed next door

    Within 500 m, last 10 years: a guide if you plan to build or apply for something similar.

    What neighbours have built and changed around you, and how the City decidedUnlock

    Crime below median

    Area safety

    Police-reported crime in the neighbourhood against the Toronto median

    • Lower than the Toronto median in 4 of 6 categories

    Neighbourhood rates per 100,000 people from the Toronto Police Service, not this street.

    What this part means for this house, in plain EnglishUnlock

    Victoria Village neighbourhood

    About the area, not this house.

    2021 Census, against the median Toronto neighbourhood

    Median household income (2020)$68,000median $84,500
    Households that own their home41%median 54%
    Population (2021)17,365median 16,813
    Homes built in 1960 or before29%median 29%
    Homes needing major repairs7%median 7%

    Getting around and schools

    • O'Connor StationNearest station9 min walk
    • Victoria Park Ave at Sunrise AveNearest TTC stop1 min walk
    • Eglinton Ave ENearest cycling route9 min walk
    • O'Connor Public SchoolSchool7 min walk
    • Clairlea Public SchoolSchool9 min walk
    • Victoria Park Elementary SchoolSchool14 min walk

    Police-reported crime, 2025, per 100,000 people

    • Assaultcity median 636.3591.2
    • Robberycity median 69.520.4
    • Auto theftcity median 192.6285.4
    • Theft over $5,000city median 46.130.6
    • Break and entercity median 172.8208.9
    • Theft from vehiclescity median 188.1178.4

    More about Victoria Village

    Ready emails

    Copy and send as they are.

    2 questions for the seller and your lawyer, written outUnlock

    What we checked, and what the City's records don't cover

    We checked 48 sets of City of Toronto, TRCA and Statistics Canada open data for this address, last updated Nov 29, 2026. Our records don't cover flooding history, ownership and mortgages, or the condition of the house: ask the seller and your insurer about water in the basement, your lawyer about title, and book a home inspection.

    See every source and when we loaded it · Pre-offer checklist

    Something here not right?

    Screening tool based on City of Toronto and TRCA open data. Not a zoning review or legal opinion. Site-specific exceptions, amendments not yet in the open data, minor variances and other by-laws can change the answer. Confirm with a Preliminary Project Review or Zoning Certificate from Toronto Building before buying or designing.

    Scores calibrated on Toronto house lots on 2026-10-19; prices and sources checked on 2026-10-06. Contains information licensed under the Open Government Licence – Toronto. TRCA regulation limits © Toronto and Region Conservation Authority.

    Full pre-offer report · 1416 Victoria Park Ave

    2 things to check at 1416 Victoria Park Ave before you offer

    • Work or applications in progressModerate
    • Zoning not in By-law 569-2013Moderate
    • 9 development applications open within 300 mLow

    The report explains what each one can cost you on this house and what to ask the seller or the City before you offer.

    $29 CAD one time · opens right away

    See a sample report

    Full refund within 30 days if the report left out or misstated a City record on the lot. Refund policy

    Also in the report

    • A PDF to forward to your agent and lawyer
    • What you can build on this lot, measured on it
    • Every line linked to the City record it comes from
    • 15 sets of public records, already searched and read for you
    • A clear list of the 3 steps to take before you offer, so nothing slips
    • What each of the 3 findings can cost you or stop you doing, in plain English
    • A two-minute summary of this house, and what to find out first before you offer
    • What the City allowed your neighbours, a guide if you plan to build or apply for something similar
    • We watch this address for 90 days. If anything changes in the City's records, we email you the same day
    • A short summary of each part: City files, restrictions, flood and erosion, build potential, building nearby, area safety

    By paying you agree to the terms of use and the refund policy. Payment by Stripe. The report opens right after payment, and we email you a link to it; your account is made from the email you pay with. A screening of public records, not a legal opinion or a home inspection.

    Flag an error

    What is not right?

    The problem

    The records come from the City's open data; we check each flag against them. Your email is used only to answer this.