Everything here comes from public records: City of Toronto open data, TRCA and Statistics Canada, 15 sets in all. Each item leads to the record it comes from. Our sources
This house at a glance
Each score from 0 to 10: 0 needs attention, 10 all clear. Build potential is how much more you could add.
About 1406 Yonge St
1406 Yonge St is on a 6 m by 17.4 m lot on Yonge St in Yonge-St.Clair. The zoning is CR. A site-specific exception, 900.11.10(633), changes some of the usual rules for this address. The property is designated under Part IV of the Ontario Heritage Act, so changes to its heritage features need a City heritage permit.
The City has 21 records on this lot since 1981. That is more than at 99% of Toronto houses. In 2024, a Committee of Adjustment application was filed: "To alter the development standards for the 50-storey mixed-use building (approved under site specific zoning by-law 1110-2022), by increasing the height from…". Status: closed. In 2021, a development application was filed: "*** draft plan of condominium for 406 dwelling units". Status: under review. In 2021, a development application was filed: "A 50-storey mixed-use building with reconstructed heritage facade and 8 rental replacement units". Status: under review. Nothing on file is open right now.
Within 300 m, 23 development applications are open (the tallest up to 50 storeys). St. Clair station is a 2-minute walk, and the lot is in its Major Transit Station Area.
Summary
What the City's records show on this house
- Heritage property: designated (Part IV)Moderate
- Work or applications in progressModerateFree check
- Site-specific exception 900.11.10(633)Moderate
- 23 development applications open within 300 mLowFree check
- 1 City tree in front of this lotLowFree check
- Yonge-St. Clair Secondary PlanLow
- 4 Committee of Adjustment files on this lotLowFree check
Left unchecked, any of these can mean unexpected costs, trouble after closing, or plans you can't carry out. Found before you offer, they give you room to negotiate. The full report explains what each one means for this house and what to do next.
15 sets of public records, already checked for you. Searching each one yourself and working out what it means for you takes time. We have done that work: what matters about this house and lot, in plain English, in a few minutes.
What to find out first
2 things to check before you offer.
What to find out before an offer, the steps to take, what each costs and how long it takesUnlock
Open City files
How much in the City's records needs answers before an offer
- Work or applications in progress
- No open orders or by-law investigations
- No permits left open for years
What this part means for this house, in plain EnglishUnlock
Work or applications in progress
ModerateCheck before you offerSee the open permit check for this house
What the record shows, what it means for you and what to doUnlock
4 Committee of Adjustment files on this lot
LowFor later, once you own itSee the next door check for this house
What the record shows, what it means for you and what to doUnlock
What this means: Building permits before buyingWhat this means: Committee of Adjustment
City files on this lot
21 records on file, more than at 99% of Toronto houses (median 0 records).
| Date | Record | As the City filed it | In plain words | Status |
|---|---|---|---|---|
| 2026-08-13 | By-law investigation26 219596 WST 00 IR | Waste | Closed | |
| 2026-04-22 | By-law investigation26 155914 WST 00 IV | Notice Issued Waste | Closed | |
| 2026-04-22 | By-law investigation26 148162 WST 00 IR | Waste | Closed | |
| 2025-09-30 | By-law investigation25 241804 WST 00 IV | Notice Issued Waste | Closed | |
| 2025-09-30 | By-law investigation25 232822 WST 00 IR | Waste | Closed | |
| 2025-08-27 | Consent (lot split)B0039/25TEY | To obtain consent to create stratified easements/rights-of-way. | Approved | |
| 2024-10-02 | Minor varianceA0684/24TEY | To alter the development standards for the 50-storey mixed-use building (approved under Site Specific Zoning By-Law 1110-2022), by increasing the height from 149.9 m to 157.2 m, revisions to the permitted projections and encroachments, and a reduction to the minimum height of the first storey. | Approved | |
| 2024-07-29 | Zoning review24 189100 ZAP | No description on file | Cancelled | |
| 2024-06-20 | Zoning review24 167657 ZAP | No description on file | Cancelled | |
| 2023-08-09 | Consent (lot split)B0038/23TEY | To obtain consent to sever a portion of the property for the purpose of a lot addition. | Approved | |
| 2023-07-26 | Consent (lot split)B0010/23TEY | To obtain consent to sever a portion of land and to create easements/rights-of-way at grade, below grade, and three-storeys above grade for air rights, as well as driveway improvements in favour of 1414 Yonge Street for the purpose of pedestrian and vehicular access. | Approved | |
| 2022-04-08 | Zoning review21 185451 POZ | No description on file | Closed | |
| 2021-10-07 | Zoning review21 211696 PSP | No description on file | Closed | |
| 2021-09-24 | Development application21 217377 STE 12 CD | *** Draft Plan of Condominium for 406 dwelling units. | Under Review | |
| 2021-09-13 | Development application21 211696 STE 12 SA | A 50-storey mixed-use building with reconstructed heritage facade and 8 rental replacement units. | Under Review | |
| 2021-07-16 | Development application21 185451 STE 12 OZ | To allow a 50-storey mixed use building with commercial at grade, containing 534dwelling units.Inactive file: Paused on request of applicant until September 2026. | Council Approved | |
| 2019-02-21 | Building permit19 105361 | Install Backflow prevention device for premise isolation | Closed | |
| 2018-11-15 | Building permit18 257044 | Premise isolation installation of DCVA | Cancelled | |
| 2005-12-21 | Zoning review05 211327 LTO | No description on file | Closed | |
| 1993-10-05 | Zoning review93 025647 LTO | No description on file | Closed | |
| 1981-08-31 | Zoning review81 030637 LTO | No description on file | Closed |
Restrictions
How much heritage, nature and site-specific rules limit changes to the house
- Heritage property: designated (Part IV)
- Site-specific exception 900.11.10(633)
What this part means for this house, in plain EnglishUnlock
Heritage property: designated (Part IV)
ModerateCheck before you offerWhat the record shows, what it means for you and what to doUnlock
Site-specific exception 900.11.10(633)
ModerateCheck if it appliesWhat the record shows, what it means for you and what to doUnlock
1 City tree in front of this lot
LowFor later, once you own itSee the tree permit check for this house
What the record shows, what it means for you and what to doUnlock
Yonge-St. Clair Secondary Plan
LowFor later, once you own itWhat the record shows, what it means for you and what to doUnlock
What this means: Toronto Heritage RegisterWhat this means: Toronto zoning by address
If you want to change or build
What the site-specific rules mean for an addition, a garage or a rebuild.
Site-specific exception 900.11.10(633)
What the exception changes for this address, rule by ruleUnlock
Flood and erosion rules
How much of the lot lies in the areas TRCA regulates for flooding and erosion
- Outside the areas TRCA regulates
From TRCA's regulated areas only. Basement flooding, sewer back-up and the TRCA flood plain are not in this score yet; ask the seller and your insurer about water in the basement.
What this part means for this house, in plain EnglishUnlock
Build potential
How much more the rules allow on this lot, beyond what is on record
What this part means for this house, in plain EnglishUnlock
The lot and what the rules allow
- Zone
- CR 4.25 (c2.0; r3.0) SS2 (x633)
- Height limit
- 30 m
- Corner lot
- No
- Public lane
- None
- House footprint
- 79 m²
- Back yard
- 2.4 m
- Buildings on the lot
- 1
House and yards from the City's 3D Massing; a survey gives exact figures.
What you can build
Why, measured on this lot, and the most you could buildUnlock
Building nearby
How much neighbours are building and applying to change within 300 m
- 23 development applications open within 300 m, up to 50 storeys
- In the St Clair station area
- 1 suite and multiplex permits within 300 m in 10 years
What this part means for this house, in plain EnglishUnlock
23 development applications open within 300 m
LowCheck if it appliesSee the next door check for this house
What the record shows, what it means for you and what to doUnlock
What the City allowed next door
Within 500 m, last 10 years: a guide if you plan to build or apply for something similar.
What neighbours have built and changed around you, and how the City decidedUnlock
Area safety
Police-reported crime in the neighbourhood against the Toronto median
- Lower than the Toronto median in 5 of 6 categories
- Break and enter: 2.2 times the Toronto median
Neighbourhood rates per 100,000 people from the Toronto Police Service, not this street.
What this part means for this house, in plain EnglishUnlock
Yonge-St.Clair neighbourhood
About the area, not this house.
2021 Census, against the median Toronto neighbourhood
Getting around and schools
- St. Clair StationNearest station2 min walk
- Yonge St at Rosehill AveNearest TTC stop1 min walk
- Yonge StNearest cycling route1 min walk
- The Linden SchoolSchool1 min walk
- The York School - Mdl and Sr CampusSchool4 min walk
- Deer Park Jr & Sr Public SchoolSchool6 min walk
- The York School - Jr CampusSchool9 min walk
Police-reported crime, 2025, per 100,000 people
- Assaultcity median 636.3270.8
- Robberycity median 69.525.8
- Auto theftcity median 192.664.5
- Theft over $5,000city median 46.132.2
- Break and entercity median 172.8374
- Theft from vehiclescity median 188.1116.1
Ready emails
Copy and send as they are.
3 questions for the seller and your lawyer, written outUnlock
What we checked, and what the City's records don't cover
We checked 48 sets of City of Toronto, TRCA and Statistics Canada open data for this address, last updated Nov 27, 2026. Our records don't cover flooding history, ownership and mortgages, or the condition of the house: ask the seller and your insurer about water in the basement, your lawyer about title, and book a home inspection.
See every source and when we loaded it · Pre-offer checklist