Everything here comes from public records: City of Toronto open data, TRCA and Statistics Canada, 15 sets in all. Each item leads to the record it comes from. Our sources
This house at a glance
Each score from 0 to 10: 0 needs attention, 10 all clear. Build potential is how much more you could add.
About 14 Elvina Gdns
14 Elvina Gdns is on a 8.4 m by 24.5 m lot on Elvina Gdns in Mount Pleasant East. The zoning is R. A site-specific exception, 900.2.10(956), changes some of the usual rules for this address.
The City has 14 records on this lot since 2016. That is more than at 99% of Toronto houses. In 2025, a building permit was filed: "Demolition of semi-detached house for future townhouse development". Status: under review. In 2025, a building permit was filed: "Proposal to construct 1 level of underground parking for blocks a and bsee also 19 215759 sa". Status: under review. In 2025, a building permit was filed: "Proposal to construct a new 3 storey sfd-semi dwelling - unit 7, block bsee also 19 215759 sa". Status: examiner's notice sent. Nothing on file is open right now.
Within 300 m, 14 development applications are open (the tallest up to 61 storeys). Mount Pleasant station is a 6-minute walk, and the lot is in its Major Transit Station Area.
Summary
What the City's records show on this house
- Work or applications in progressModerateFree check
- Site-specific exception 900.2.10(956)Moderate
- 1 by-law investigation closed in the last two yearsLow
- No permit for a second unit on fileLowFree check
- 14 development applications open within 300 mLowFree check
- Minimum frontage 9 mLow
- Yonge-Eglinton Secondary PlanLow
Left unchecked, any of these can mean unexpected costs, trouble after closing, or plans you can't carry out. Found before you offer, they give you room to negotiate. The full report explains what each one means for this house and what to do next.
What the rules allow here: Multiplex up to 4 units
15 sets of public records, already checked for you. Searching each one yourself and working out what it means for you takes time. We have done that work: what matters about this house and lot, in plain English, in a few minutes.
What to find out first
1 thing to check before you offer.
What to find out before an offer, the steps to take, what each costs and how long it takesUnlock
Open City files
How much in the City's records needs answers before an offer
- Work or applications in progress
- 1 by-law investigation closed in the last two years
- No open orders or by-law investigations
What this part means for this house, in plain EnglishUnlock
Work or applications in progress
ModerateCheck before you offerSee the open permit check for this house
What the record shows, what it means for you and what to doUnlock
1 by-law investigation closed in the last two years
LowCheck if it appliesWhat the record shows, what it means for you and what to doUnlock
No permit for a second unit on file
LowCheck if it appliesSee the basement apartment check for this house
What the record shows, what it means for you and what to doUnlock
What this means: Toronto zoning by addressWhat this means: Building permits before buying
City files on this lot
14 records on file, more than at 99% of Toronto houses (median 0 records).
| Date | Record | As the City filed it | In plain words | Status |
|---|---|---|---|---|
| 2026-06-08 | By-law investigation26 191495 LGW 00 IV | Notice Issued Long Grass | Notice Issued | |
| 2026-06-08 | By-law investigation26 180161 LGW 00 IR | Long Grass and Weeds | Notice Issued | |
| 2026-05-19 | By-law investigation26 177202 WST 00 IV | Notice Issued Waste | Closed | |
| 2026-05-19 | By-law investigation26 162947 WST 00 IR | Waste | Closed | |
| 2025-04-16 | Building permit25 145804 | Demolition of semi-detached house for future townhouse development. | Under Review | |
| 2025-04-02 | Building permit25 138171 | Proposal to construct 1 level of underground parking for Blocks A and BSee also 19 215759 SA | Under Review | |
| 2025-04-02 | Building permit25 138163 | Proposal to construct a new 3 storey SFD-semi dwelling - UNIT 7, BLOCK BSee also 19 215759 SA | Examiner's Notice Sent | |
| 2025-04-02 | Building permit25 138151 | Proposal to construct a new 3 storey SFD-semi dwelling - UNIT 6, BLOCK BSee also 19 215759 SA | Under Review | |
| 2025-04-02 | Building permit25 138124 | Proposal to construct a new 3 storey block of townhouses with 5 units - BLOCK ASee also 19 215759 SA | Response Received | |
| 2025-01-28 | By-law investigation25 109996 ZON 00 IR | Zoning | Closed | |
| 2019-09-06 | Zoning review19 215759 PSP | No description on file | Closed | |
| 2019-09-04 | Development application19 215759 NNY 15 SA | Site Plan Application for the development of 7 new dwelling units, consisting of 5 three-storey townhouse dwelling units, 2 new semi-detached dwellings, and the retention of the existing two-storey single detached dwelling (197 Erskine Avenue). A total of 12 underground parking spaces are proposed. | NOAC Issued | |
| 2018-04-18 | Zoning review16 263364 PRZ | No description on file | Closed | |
| 2016-12-12 | Development application16 263364 NNY 25 OZ | Zoning By-law Amendment Application for the development of 7 new dwelling units, consisting of 5 three-storey townhouse dwelling units, 2 new semi-detached dwellings, and the retention of the existing two-storey single detached dwelling (197 Erskine Avenue). A total of 12 underground parking spaces are proposed. | OMB Approved |
Restrictions
How much heritage, nature and site-specific rules limit changes to the house
- Site-specific exception 900.2.10(956)
- No heritage listing or designation
What this part means for this house, in plain EnglishUnlock
Site-specific exception 900.2.10(956)
ModerateCheck if it appliesWhat the record shows, what it means for you and what to doUnlock
Yonge-Eglinton Secondary Plan
LowFor later, once you own itWhat the record shows, what it means for you and what to doUnlock
If you want to change or build
What the site-specific rules mean for an addition, a garage or a rebuild.
Site-specific exception 900.2.10(956)
What the exception changes for this address, rule by ruleUnlock
Flood and erosion rules
How much of the lot lies in the areas TRCA regulates for flooding and erosion
- Outside the areas TRCA regulates
From TRCA's regulated areas only. Basement flooding, sewer back-up and the TRCA flood plain are not in this score yet; ask the seller and your insurer about water in the basement.
What this part means for this house, in plain EnglishUnlock
Build potential
How much more the rules allow on this lot, beyond what is on record
- Multiplex up to 4 units: likely fits
- Secondary suite: likely fits
- No public lane, so no laneway suite
What this part means for this house, in plain EnglishUnlock
Minimum frontage 9 m
LowFor later, once you own itWhat the record shows, what it means for you and what to doUnlock
Multiplex up to 4 units
LowFor later, once you own itWhat the record shows, what it means for you and what to doUnlock
The lot and what the rules allow
- Zone
- R (f9.0; u4; d0.6) (x956)
- Height limit
- 10 m
- Corner lot
- No
- Public lane
- None
- New house permit
- 2025
House and yards from the City's 3D Massing; a survey gives exact figures.
What you can build
Why, measured on this lot, and the most you could buildUnlock
Building nearby
How much neighbours are building and applying to change within 300 m
- 14 development applications open within 300 m, up to 61 storeys
- In the Mount Pleasant station area
- 1 suite and multiplex permits within 300 m in 10 years
What this part means for this house, in plain EnglishUnlock
14 development applications open within 300 m
LowCheck if it appliesSee the next door check for this house
What the record shows, what it means for you and what to doUnlock
What this means: Committee of Adjustment
What the City allowed next door
Within 500 m, last 10 years: a guide if you plan to build or apply for something similar.
What neighbours have built and changed around you, and how the City decidedUnlock
Area safety
Police-reported crime in the neighbourhood against the Toronto median
- Lower than the Toronto median in 4 of 6 categories
Neighbourhood rates per 100,000 people from the Toronto Police Service, not this street.
What this part means for this house, in plain EnglishUnlock
Mount Pleasant East neighbourhood
About the area, not this house.
2021 Census, against the median Toronto neighbourhood
Getting around and schools
- Mount Pleasant StationNearest station6 min walk
- Mt Pleasant Rd at Erskine AveNearest TTC stop1 min walk
- Broadway AveNearest cycling route1 min walk
- Manor Montessori School - Mt PleasantSchool1 min walk
- Northern Secondary SchoolSchool3 min walk
- Toronto Stem SchoolSchool7 min walk
- Eglinton Jr Public SchoolSchool7 min walk
Police-reported crime, 2025, per 100,000 people
- Assaultcity median 636.3336.5
- Robberycity median 69.510.2
- Auto theftcity median 192.6224.4
- Theft over $5,000city median 46.145.9
- Break and entercity median 172.8204
- Theft from vehiclescity median 188.1107.1
Ready emails
Copy and send as they are.
3 questions for the seller and your lawyer, written outUnlock
What we checked, and what the City's records don't cover
We checked 48 sets of City of Toronto, TRCA and Statistics Canada open data for this address, last updated Nov 28, 2026. Our records don't cover flooding history, ownership and mortgages, or the condition of the house: ask the seller and your insurer about water in the basement, your lawyer about title, and book a home inspection.
See every source and when we loaded it · Pre-offer checklist