Everything here comes from public records: City of Toronto open data, TRCA and Statistics Canada, 15 sets in all. Each item leads to the record it comes from. Our sources
This house at a glance
Each score from 0 to 10: 0 needs attention, 10 all clear. Build potential is how much more you could add.
About 136-138 Yorkville Ave
136-138 Yorkville Ave is on a 13.7 m by 51.2 m lot on Yorkville Ave in Annex. The zoning is CR. A site-specific exception, 900.11.10(379), changes some of the usual rules for this address.
The City has 28 records on this lot since 1985. That is more than at 99% of Toronto houses. In 2022, a Committee of Adjustment application was filed: "To permit an exemption from chapter 900.11.10(379), by-law 569-2013 and section 7(l), by-law 687-2021, by allowing the building to increase the thickness of…". Status: closed. In 2021, a building permit was filed: "Demolish the existing 3 storey commercial building for future development". Status: closed. In 2021, a development application was filed: "Proposal for a 31-storey mixed-use building.minor variance approval granted for 2 additional storeys (feb 7, 2024)". Status: noac issued. An open permit means the City has not closed the file. Ask the seller whether the work was finished and passed its final inspection.
Within 300 m, 10 development applications are open (the tallest up to 78 storeys). Bay station is a 6-minute walk, and the lot is in its Major Transit Station Area.
Summary
What the City's records show on this house
- Building permit open since 2015ModerateFree check
- Work or applications in progressModerateFree check
- Site-specific exception 900.11.10(379)Moderate
- 2 by-law investigations closed in the last two yearsLow
- 10 development applications open within 300 mLowFree check
- Priority retail street: Yorkville AvenueLow
- Site and Area Specific Policy 211, 225Low
- Downtown Plan Secondary PlanLow
- 2 Committee of Adjustment files on this lotLowFree check
Left unchecked, any of these can mean unexpected costs, trouble after closing, or plans you can't carry out. Found before you offer, they give you room to negotiate. The full report explains what each one means for this house and what to do next.
15 sets of public records, already checked for you. Searching each one yourself and working out what it means for you takes time. We have done that work: what matters about this house and lot, in plain English, in a few minutes.
What to find out first
2 things to check before you offer.
What to find out before an offer, the steps to take, what each costs and how long it takesUnlock
Open City files
How much in the City's records needs answers before an offer
- Building permit open since 2015
- Work or applications in progress
- 2 by-law investigations closed in the last two years
What this part means for this house, in plain EnglishUnlock
Building permit open since 2015
ModerateCheck before you offerSee the open permit check for this house
What the record shows, what it means for you and what to doUnlock
Work or applications in progress
ModerateCheck before you offerSee the open permit check for this house
What the record shows, what it means for you and what to doUnlock
2 by-law investigations closed in the last two years
LowCheck if it appliesWhat the record shows, what it means for you and what to doUnlock
2 Committee of Adjustment files on this lot
LowFor later, once you own itSee the next door check for this house
What the record shows, what it means for you and what to doUnlock
What this means: Building permits before buyingWhat this means: Committee of Adjustment
City files on this lot
28 records on file, more than at 99% of Toronto houses (median 0 records).
| Date | Record | As the City filed it | In plain words | Status |
|---|---|---|---|---|
| 2026-05-07 | By-law investigation26 157051 PRS 00 IR | Property Standards | Closed | |
| 2025-01-23 | By-law investigation25 107837 PRS 00 IR | Property Standards | Closed | |
| 2022-12-07 | Minor varianceA1001/22TEY | To permit an exemption from Chapter 900.11.10(379), By-law 569-2013 and Section 7(L), By-law 687-2021, by allowing the building to increase the thickness of concrete slabs resulting in surpassing the existing height limit of 125.1 m by 5 m, resulting in a total building height of 130.1 m. | Approved | |
| 2022-09-21 | Consent (lot split)B0003/22TEY | To obtain consent for a technical severance to re-establish two lots which merged on title. | Approved | |
| 2021-08-10 | Building permit21 175247 | Demolish the existing 3 storey commercial building for future development | Closed | |
| 2021-04-28 | Development application21 146891 STE 11 SA | Proposal for a 31-storey mixed-use building.Minor Variance approval granted for 2 additional storeys (Feb 7, 2024). | NOAC Issued | |
| 2020-03-16 | Development application20 126634 STE 11 OZ | Zoning By-Law Amendment to permit the redevelopment of the subject site with a 29-storey residential mixed-use building, containing 25,280square meters of residential gross floor area and 4,005square meters of non-residential gross floor area. | Closed | |
| 2018-08-29 | Building permit18 201013 | Proposal to install 1 24x20x4m tent (cert# 14-219353) and one 20x10x10 tent (cert# 14-219349) to be installed September 3rd and removed September 7, 2018 for "Toronto Fashion Week" | Closed | |
| 2018-08-24 | Building permit18 200999 | Proposal to install bil-jax stage flooring to be erected August 29th, 2018 and dismantled September 8, 2018 for "Toronto Fashion Week" | Closed | |
| 2018-05-24 | Zoning review18 164037 LTO | No description on file | Closed | |
| 2018-02-02 | Building permit18 111057 | Proposal to install temporary flooring at Yorkville Mall. To be erected Jan 20, 2018 and dismantled Feb 10, 2018. | Closed | |
| 2016-11-23 | Building permit15 106176 | Revision to indicate location of approved alternative solution (16 165195 ALT) on north side of building as per inspectors request. | Closed | |
| 2016-10-07 | Building permit15 223396 | REvision 1: revision to the sprinkler system layoutProposal to install new sprinkler system in new 1 storey retail building. | Closed | |
| 2016-07-15 | Building permit16 177444 | Proposal to erect and display one non-illuminated wall sign displaying static copy on the south elevation entrance to Yorkville Village. The proposed sign is 0.26 metres vertically by 5.29 metres horizontally at a height of 4.06 metres above grade. **Yorkville Village** | Closed | |
| 2016-05-31 | Building permit16 165195 | Proposal for an alternative solution regarding the proposed use of window sprinklers and close-spaced sprinkler water curtain to protect the glazing and sliding/swing doors at the entrance vestibule to the Hazelton Lanes building from the new building to be constructed at 136-138 Yorkville Avenue. | Approved | |
| 2015-11-23 | Building permit15 234840 | Proposal for site services related to 15-106176 | Permit Issued | |
| 2015-01-02 | Building permit14 230749 | Proposal to demolish existing 3 storey mixed use building. | Closed | |
| 2014-02-26 | Building permit14 122171 | To demolish the existing three-storey multi-use building at 136 Yorkville Ave. | Cancelled | |
| 2012-06-22 | Zoning review12 198480 LTO | No description on file | Closed | |
| 2004-06-01 | Zoning review04 141848 LTO | No description on file | Closed | |
| 1999-06-03 | Zoning review99 022451 LTO | No description on file | Closed | |
| 1996-01-19 | Building permit96 012039 | INSTALL FIXTURES IN 2ND FLOOR OFFICE: 1 W.C., 1 W.B., 1 KITCHEN SINK, 1 H.W.T. COST INCL. 381446 /LM | Closed | |
| 1995-03-03 | Zoning review95 024742 LTO | No description on file | Closed | |
| 1993-05-27 | Zoning review93 025148 LTO | No description on file | Closed | |
| 1990-06-28 | Zoning review90 028609 LTO | No description on file | Closed | |
| 1987-02-09 | Zoning review87 029848 LTO | No description on file | Closed | |
| 1986-02-20 | Zoning review86 027913 LTO | No description on file | Closed | |
| 1985-10-05 | Zoning review85 026996 LTO | No description on file | Closed |
Restrictions
How much heritage, nature and site-specific rules limit changes to the house
- Site-specific exception 900.11.10(379)
- Priority retail street: Yorkville Avenue
- No heritage listing or designation
What this part means for this house, in plain EnglishUnlock
Site-specific exception 900.11.10(379)
ModerateCheck if it appliesWhat the record shows, what it means for you and what to doUnlock
Priority retail street: Yorkville Avenue
LowFor later, once you own itWhat the record shows, what it means for you and what to doUnlock
Site and Area Specific Policy 211, 225
LowFor later, once you own itWhat the record shows, what it means for you and what to doUnlock
Downtown Plan Secondary Plan
LowFor later, once you own itWhat the record shows, what it means for you and what to doUnlock
What this means: Toronto zoning by address
If you want to change or build
What the site-specific rules mean for an addition, a garage or a rebuild.
Site-specific exception 900.11.10(379)
What the exception changes for this address, rule by ruleUnlock
Flood and erosion rules
How much of the lot lies in the areas TRCA regulates for flooding and erosion
- Outside the areas TRCA regulates
From TRCA's regulated areas only. Basement flooding, sewer back-up and the TRCA flood plain are not in this score yet; ask the seller and your insurer about water in the basement.
What this part means for this house, in plain EnglishUnlock
Build potential
How much more the rules allow on this lot, beyond what is on record
What this part means for this house, in plain EnglishUnlock
The lot and what the rules allow
- Zone
- CR 3.0 (c2.5; r3.0) SS1 (x379)
- Height limit
- 25 m
- Corner lot
- No
- Public lane
- None
- House footprint
- 494 m²
- Back yard
- 3.5 m
- Buildings on the lot
- 1
House and yards from the City's 3D Massing; a survey gives exact figures.
What you can build
Why, measured on this lot, and the most you could buildUnlock
Building nearby
How much neighbours are building and applying to change within 300 m
- 10 development applications open within 300 m, up to 78 storeys
- In the Bay station area
- 2 suite and multiplex permits within 300 m in 10 years
What this part means for this house, in plain EnglishUnlock
10 development applications open within 300 m
LowCheck if it appliesSee the next door check for this house
What the record shows, what it means for you and what to doUnlock
What the City allowed next door
Within 500 m, last 10 years: a guide if you plan to build or apply for something similar.
What neighbours have built and changed around you, and how the City decidedUnlock
Area safety
Police-reported crime in the neighbourhood against the Toronto median
- Lower than the Toronto median in 3 of 8 categories
- Theft over $5,000: 2.5 times the Toronto median
- Break and enter: 2.2 times the Toronto median
- Assault: 1.7 times the Toronto median
Neighbourhood rates per 100,000 people from the Toronto Police Service, not this street.
What this part means for this house, in plain EnglishUnlock
Annex neighbourhood
About the area, not this house.
2021 Census, against the median Toronto neighbourhood
Getting around and schools
- Bay StationNearest station6 min walk
- Avenue Rd at Bloor St West North SideNearest TTC stop3 min walk
- Avenue RdNearest cycling route1 min walk
- Career Quest - TorontoSchool1 min walk
- Rosedale Day SchoolSchool4 min walk
- Jesse Ketchum Jr & Sr Public SchoolSchool5 min walk
- The Shire SchoolSchool5 min walk
Police-reported crime, 2025, per 100,000 people
- Assaultcity median 636.31080.9
- Robberycity median 69.580.5
- Homicidecity median 5.35.2
- Shootingscity median 10.55.2
- Auto theftcity median 192.6116.9
- Theft over $5,000city median 46.1114.3
- Break and entercity median 172.8387.1
- Theft from vehiclescity median 188.1220.9
Ready emails
Copy and send as they are.
5 questions for the seller and your lawyer, written outUnlock
What we checked, and what the City's records don't cover
We checked 48 sets of City of Toronto, TRCA and Statistics Canada open data for this address, last updated Nov 28, 2026. Our records don't cover flooding history, ownership and mortgages, or the condition of the house: ask the seller and your insurer about water in the basement, your lawyer about title, and book a home inspection.
See every source and when we loaded it · Pre-offer checklist