HousePrecheckCheck an address

132 Queens Quay ESt Lawrence-East Bayfront-The Islands, Toronto · City records before you offer

Also 134 Queens Quay E

≈ 24.8 × 27.6 m513 m²on Richardson Stcorner, also on Queens Quay E

2 things to check before you offer, including 2 building permits open, the oldest since 2018
N10 m
≈ 24.8 m frontage≈ 27.6 m deepirregular lot, estimated

Everything here comes from public records: City of Toronto open data, TRCA and Statistics Canada, 15 sets in all. Each item leads to the record it comes from. Our sources

This house at a glance

Each score from 0 to 10: 0 needs attention, 10 all clear. Build potential is how much more you could add.

About 132 Queens Quay E

132 Queens Quay E is on a 24.8 m by 27.6 m lot on Richardson St in St Lawrence-East Bayfront-The Islands. This lot is not covered by Toronto's city-wide zoning by-law 569-2013, so a by-law of the former city or borough most likely still applies. Toronto Building can confirm which one. The lot also fronts Queens Quay E.

The City has 13 records on this lot since 1981. That is more than at 99% of Toronto houses. In 2018, a building permit was filed: "To erect and display one illuminated projecting sign displaying static copy located on the first storey of the southerly elevation, measuring 0.61 m by 0.61 m…". Status: closed. In 2018, a building permit was filed: "Proposal for interior alterations to the ground floor of the existing office building, scope of work is tenant fit up for a new bank (royal bank) including new…". Status: inspection. In 2018, a building permit was filed: "Proposal for interior alterations. unit 9 tenant starbucks". Status: inspection. 2 open permits mean the City has not closed the files. Ask the seller whether the work was finished and passed its final inspection.

Within 300 m, 7 development applications are open (the tallest up to 85 storeys). Within 300 m, the Committee of Adjustment decided 5 minor variance applications in the last 10 years and approved 100%. Queens Quay/Ferry Docks station is a 13-minute walk.

Summary

What the City's records show on this house

  • 2 building permits open, the oldest since 2018ModerateFree check
  • Zoning not in By-law 569-2013Moderate
  • 7 development applications open within 300 mLowFree check

Left unchecked, any of these can mean unexpected costs, trouble after closing, or plans you can't carry out. Found before you offer, they give you room to negotiate. The full report explains what each one means for this house and what to do next.

Unlock the full report

15 sets of public records, already checked for you. Searching each one yourself and working out what it means for you takes time. We have done that work: what matters about this house and lot, in plain English, in a few minutes.

What to find out first

2 things to check before you offer.

What to find out before an offer, the steps to take, what each costs and how long it takesUnlock

Check

Open City files

How much in the City's records needs answers before an offer

  • 2 building permits open, the oldest since 2018
  • No open orders or by-law investigations
  • No work or applications in progress

What this part means for this house, in plain EnglishUnlock

  1. 2 building permits open, the oldest since 2018

    ModerateCheck before you offer

    What the record shows, what it means for you and what to doUnlock

City files on this lot

13 records on file, more than at 99% of Toronto houses (median 0 records).

DateRecordAs the City filed itIn plain wordsStatus
2024-11-22Zoning review
24 242111 LPR
No description on fileClosed
2018-07-30Building permit
18 192299
To erect and display one illuminated projecting sign displaying static copy located on the first storey of the southerly elevation, measuring 0.61 m by 0.61 m at a height of 3.31m. See associated SMP No. 16-250649 (FP-16-00132).*****STARBUCKS******Closed
2018-05-17Building permit
18 159711
Proposal for interior alterations to the ground floor of the existing office building, scope of work is tenant fit up for a new bank (Royal Bank) including new interior partitions, furniture and equipment, electrical and mechanical devices to suit and structural hanging of sliding grille door.Inspection
2018-01-15Building permit
17 272023
Proposal for interior alterations. Unit 9 Tenant StarbucksInspection
2017-10-16Development application
17 248316 STE 28 CD
Draft Plan of Condominium application to create a total of 180-standard condominium units within the proposed condominium area of the building at 130 Queens Quay East.Closed
2014-09-30Development application
14 230224 STE 28 SA
Phase 1 of a 2 phase development. Phase 1 proposes the construction of a commercial building with a four-storey podium and two towers being 13 and 10 storeys high. The proposal involves an underground garage with 498 parking spaces and a public park at the corner of Queens Quay East and Lower Jarvis Street.Closed
1997-04-23Zoning review
97 026187 LTO
No description on fileClosed
1994-07-11Zoning review
94 025170 LTO
No description on fileClosed
1994-07-11Zoning review
94 025177 LTO
No description on fileClosed
1985-11-25Zoning review
85 027078 LTO
No description on fileClosed
1985-11-25Zoning review
85 027079 LTO
No description on fileClosed
1982-04-19Zoning review
82 025968 LTO
No description on fileClosed
1981-03-26Zoning review
81 030077 LTO
No description on fileClosed
Minor

Restrictions

How much heritage, nature and site-specific rules limit changes to the house

  • Zoning not in By-law 569-2013
  • No heritage listing or designation

What this part means for this house, in plain EnglishUnlock

  1. Zoning not in By-law 569-2013

    ModerateCheck before you offer

    What the record shows, what it means for you and what to doUnlock

Not on this lot

Flood and erosion rules

How much of the lot lies in the areas TRCA regulates for flooding and erosion

  • Outside the areas TRCA regulates

From TRCA's regulated areas only. Basement flooding, sewer back-up and the TRCA flood plain are not in this score yet; ask the seller and your insurer about water in the basement.

What this part means for this house, in plain EnglishUnlock

Little left to add

Build potential

How much more the rules allow on this lot, beyond what is on record

What this part means for this house, in plain EnglishUnlock

The lot and what the rules allow

N20 m
≈ 24.8 m frontage≈ 27.6 m deepon Richardson St
Zone
—
Height limit
—
Corner lot
Yes, also on Queens Quay E
Public lane
None
House footprint
410 m²
Back yard
7.8 m
Buildings on the lot
5

House and yards from the City's 3D Massing; a survey gives exact figures.

What you can build

    Why, measured on this lot, and the most you could buildUnlock

    Active

    Building nearby

    How much neighbours are building and applying to change within 300 m

    • 7 development applications open within 300 m, up to 85 storeys
    • 5 minor variance decisions within 300 m, 100% approved

    What this part means for this house, in plain EnglishUnlock

    1. 7 development applications open within 300 m

      LowCheck if it applies

      What the record shows, what it means for you and what to doUnlock

    What the City allowed next door

    Within 500 m, last 10 years: a guide if you plan to build or apply for something similar.

    What neighbours have built and changed around you, and how the City decidedUnlock

    Crime near median

    Area safety

    Police-reported crime in the neighbourhood against the Toronto median

    • Lower than the Toronto median in 4 of 7 categories
    • Theft over $5,000: 1.7 times the Toronto median
    • Assault: 1.7 times the Toronto median

    Neighbourhood rates per 100,000 people from the Toronto Police Service, not this street.

    What this part means for this house, in plain EnglishUnlock

    St Lawrence-East Bayfront-The Islands neighbourhood

    About the area, not this house.

    2021 Census, against the median Toronto neighbourhood

    Median household income (2020)$87,000median $84,500
    Households that own their home40%median 54%
    Population (2021)31,285median 16,813
    Homes built in 1960 or before3%median 29%
    Homes needing major repairs3%median 7%

    Getting around and schools

    • Queens Quay/Ferry Docks StationNearest station13 min walk
    • Queens Quay East at Lower Jarvis StNearest TTC stop1 min walk
    • Martin Goodman TrlNearest cycling route1 min walk
    • George Brown College - Waterfront CampusSchool4 min walk
    • St Michael Catholic Elementary School - Bldg 1School7 min walk
    • Downtown Alternative SchoolSchool7 min walk
    • Market Lane Jr & Sr Public SchoolSchool11 min walk

    Police-reported crime, 2025, per 100,000 people

    • Assaultcity median 636.31059.7
    • Robberycity median 69.596.3
    • Shootingscity median 10.54.5
    • Auto theftcity median 192.624.6
    • Theft over $5,000city median 46.178.4
    • Break and entercity median 172.8163.5
    • Theft from vehiclescity median 188.1163.5

    More about St Lawrence-East Bayfront-The Islands

    Ready emails

    Copy and send as they are.

    2 questions for the seller and your lawyer, written outUnlock

    What we checked, and what the City's records don't cover

    We checked 48 sets of City of Toronto, TRCA and Statistics Canada open data for this address, last updated Nov 27, 2026. Our records don't cover flooding history, ownership and mortgages, or the condition of the house: ask the seller and your insurer about water in the basement, your lawyer about title, and book a home inspection.

    See every source and when we loaded it · Pre-offer checklist

    Something here not right?

    Screening tool based on City of Toronto and TRCA open data. Not a zoning review or legal opinion. Site-specific exceptions, amendments not yet in the open data, minor variances and other by-laws can change the answer. Confirm with a Preliminary Project Review or Zoning Certificate from Toronto Building before buying or designing.

    Scores calibrated on Toronto house lots on 2026-10-19; prices and sources checked on 2026-10-06. Contains information licensed under the Open Government Licence – Toronto. TRCA regulation limits © Toronto and Region Conservation Authority.

    Full pre-offer report · 132 Queens Quay E

    2 things to check at 132 Queens Quay E before you offer

    • 2 building permits open, the oldest since 2018Moderate
    • Zoning not in By-law 569-2013Moderate
    • 7 development applications open within 300 mLow

    The report explains what each one can cost you on this house and what to ask the seller or the City before you offer.

    $29 CAD one time · opens right away

    See a sample report

    Full refund within 30 days if the report left out or misstated a City record on the lot. Refund policy

    Also in the report

    • A PDF to forward to your agent and lawyer
    • What you can build on this lot, measured on it
    • Every line linked to the City record it comes from
    • 15 sets of public records, already searched and read for you
    • A clear list of the 6 steps to take before you offer, so nothing slips
    • What each of the 3 findings can cost you or stop you doing, in plain English
    • A two-minute summary of this house, and what to find out first before you offer
    • What the City allowed your neighbours, a guide if you plan to build or apply for something similar
    • We watch this address for 90 days. If anything changes in the City's records, we email you the same day
    • A short summary of each part: City files, restrictions, flood and erosion, build potential, building nearby, area safety

    By paying you agree to the terms of use and the refund policy. Payment by Stripe. The report opens right after payment, and we email you a link to it; your account is made from the email you pay with. A screening of public records, not a legal opinion or a home inspection.

    Flag an error

    What is not right?

    The problem

    The records come from the City's open data; we check each flag against them. Your email is used only to answer this.