Everything here comes from public records: City of Toronto open data, TRCA and Statistics Canada, 15 sets in all. Each item leads to the record it comes from. Our sources
This house at a glance
Each score from 0 to 10: 0 needs attention, 10 all clear. Build potential is how much more you could add.
About 13 Mansfield Ave
13 Mansfield Ave is on a 4.9 m by 30.4 m lot on Mansfield Ave in Trinity-Bellwoods. The zoning is R. The lot also fronts Clinton St.
The City has 5 records on this lot since 2020. That is more than at 93% of Toronto houses. In 2024, a building permit was filed: "Revision - underpinning existing foundation wallsproposal to convert existing garage into a two-storey laneway suite and include new ground floor lowered slab". Status: revision issued. In 2023, a Committee of Adjustment application was filed: "To alter the existing one-storey ancillary building (detached garage in the rear yard, abutting the laneway) by constructing a complete second storey addition…". Status: closed. In 2022, a Committee of Adjustment application was filed: "To construct a two-storey ancillary building (laneway suite) in the rear yard of the property by adding a second storey above the existing rear detached garage…". Status: closed. An open permit means the City has not closed the file. Ask the seller whether the work was finished and passed its final inspection.
No development applications are open within 300 m. Within 300 m, the Committee of Adjustment decided 81 minor variance applications in the last 10 years and approved 96%. The nearest TTC stop is College St at Grace St, a 4-minute walk.
Summary
What the City's records show on this house
- Building permit open since 2024ModerateFree check
- Records mention laneway suite, second unitModerateFree check
- 2 Committee of Adjustment files on this lotLowFree check
Left unchecked, any of these can mean unexpected costs, trouble after closing, or plans you can't carry out. Found before you offer, they give you room to negotiate. The full report explains what each one means for this house and what to do next.
What the rules allow here: Multiplex up to 4 units · Garden suite
15 sets of public records, already checked for you. Searching each one yourself and working out what it means for you takes time. We have done that work: what matters about this house and lot, in plain English, in a few minutes.
What to find out first
2 things to check before you offer.
What to find out before an offer, the steps to take, what each costs and how long it takesUnlock
Open City files
How much in the City's records needs answers before an offer
- Building permit open since 2024
- Records mention laneway suite, second unit
- No open orders or by-law investigations
What this part means for this house, in plain EnglishUnlock
Building permit open since 2024
ModerateCheck before you offerSee the open permit check for this house
What the record shows, what it means for you and what to doUnlock
Records mention laneway suite, second unit
ModerateCheck before you offerSee the basement apartment check for this house
What the record shows, what it means for you and what to doUnlock
2 Committee of Adjustment files on this lot
LowFor later, once you own itSee the next door check for this house
What the record shows, what it means for you and what to doUnlock
What this means: Toronto zoning by addressWhat this means: Building permits before buyingWhat this means: Committee of Adjustment
City files on this lot
5 records on file, more than at 93% of Toronto houses (median 0 records).
| Date | Record | As the City filed it | In plain words | Status |
|---|---|---|---|---|
| 2024-05-22 | Building permit23 228113 | REVISION - underpinning existing foundation wallsProposal to convert existing garage into a two-storey laneway suite and include new ground floor lowered slab. | Revision Issued | |
| 2023-09-13 | Minor varianceA1275/22TEY | To alter the existing one-storey ancillary building (detached garage in the rear yard, abutting the laneway) by constructing a complete second storey addition. This building (both levels) will be used for one laneway suite. The existing parking space will be removed. | Approved | |
| 2022-08-17 | Minor varianceA0821/20TEY | To construct a two-storey ancillary building (laneway suite) in the rear yard of the property by adding a second storey above the existing rear detached garage and converting the garage into living space at the ground floor. | Approved | |
| 2020-03-05 | Zoning review20 122597 ZZC | No description on file | Closed | |
| 2020-02-25 | Building permit19 250502 | Proposed interior alterations to convert an existing single family detached dwelling into a 2-unit dwelling. | Closed |
Restrictions
How much heritage, nature and site-specific rules limit changes to the house
- No heritage listing or designation
- No site-specific zoning exception
What this part means for this house, in plain EnglishUnlock
Flood and erosion rules
How much of the lot lies in the areas TRCA regulates for flooding and erosion
- Outside the areas TRCA regulates
From TRCA's regulated areas only. Basement flooding, sewer back-up and the TRCA flood plain are not in this score yet; ask the seller and your insurer about water in the basement.
What this part means for this house, in plain EnglishUnlock
Build potential
How much more the rules allow on this lot, beyond what is on record
- On record: laneway suite, second unit
- Multiplex up to 4 units: allowed
- Garden suite: likely fits
What this part means for this house, in plain EnglishUnlock
Multiplex up to 4 units
LowFor later, once you own itWhat the record shows, what it means for you and what to doUnlock
Garden suite
LowFor later, once you own itSee the garden suite check for this house
What the record shows, what it means for you and what to doUnlock
The lot and what the rules allow
- Zone
- R (d0.6)
- Height limit
- 11 m
- Corner lot
- Yes, also on Clinton St
- Public lane
- Ln E Bellwoods S Mansfield, 7.8 m along it
- New house permit
- None since 2000
- House footprint
- 73 m²
- Back yard
- 12.7 m
- Buildings on the lot
- 1
House and yards from the City's 3D Massing; a survey gives exact figures.
What you can build
Why, measured on this lot, and the most you could buildUnlock
Building nearby
How much neighbours are building and applying to change within 300 m
- 1 development application within 300 m in 10 years, none open
- 34 suite and multiplex permits within 300 m in 10 years
- 81 minor variance decisions within 300 m, 96% approved
What this part means for this house, in plain EnglishUnlock
What the City allowed next door
Within 500 m, last 10 years: a guide if you plan to build or apply for something similar.
What neighbours have built and changed around you, and how the City decidedUnlock
Area safety
Police-reported crime in the neighbourhood against the Toronto median
- Lower than the Toronto median in 3 of 7 categories
- Break and enter: 2.0 times the Toronto median
- Theft over $5,000: 1.5 times the Toronto median
Neighbourhood rates per 100,000 people from the Toronto Police Service, not this street.
What this part means for this house, in plain EnglishUnlock
Trinity-Bellwoods neighbourhood
About the area, not this house.
2021 Census, against the median Toronto neighbourhood
Getting around and schools
- Christie StationNearest station21 min walk
- College St at Grace StNearest TTC stop4 min walk
- College StNearest cycling route4 min walk
- Ecole Elementaire Pierre Elliott TrudeauSchool3 min walk
- St Francis of Assisi Catholic Elementary SchoolSchool6 min walk
- Clinton Street Jr Public SchoolSchool8 min walk
- Charles G Fraser Jr Public SchoolSchool10 min walk
Police-reported crime, 2025, per 100,000 people
- Assaultcity median 636.3946.7
- Robberycity median 69.558.4
- Shootingscity median 10.55.8
- Auto theftcity median 192.676
- Theft over $5,000city median 46.170.1
- Break and entercity median 172.8350.6
- Theft from vehiclescity median 188.1280.5
Ready emails
Copy and send as they are.
4 questions for the seller and your lawyer, written outUnlock
What we checked, and what the City's records don't cover
We checked 48 sets of City of Toronto, TRCA and Statistics Canada open data for this address, last updated Nov 27, 2026. Our records don't cover flooding history, ownership and mortgages, or the condition of the house: ask the seller and your insurer about water in the basement, your lawyer about title, and book a home inspection.
See every source and when we loaded it · Pre-offer checklist