HousePrecheckCheck an address

129 Peter StWellington Place, Toronto · City records before you offer

Also 129R Peter St, 131 Peter St, 342 Richmond St W

Commercial residential employment · CRE (x74)19.0 × 25.7 m480 m²on Peter St

3 things to check before you offer, including 3 building permits open, the oldest since 2008
N10 m
19.0 m frontage25.7 m deep

Everything here comes from public records: City of Toronto open data, TRCA and Statistics Canada, 15 sets in all. Each item leads to the record it comes from. Our sources

This house at a glance

Each score from 0 to 10: 0 needs attention, 10 all clear. Build potential is how much more you could add.

About 129 Peter St

129 Peter St is on a 19 m by 25.7 m lot on Peter St in Wellington Place. The zoning is CRE. A site-specific exception, 900.12.10(74), changes some of the usual rules for this address. The property is inside a Heritage Conservation District, so many outside changes need a City heritage permit.

The City has 14 records on this lot since 1991. That is more than at 99% of Toronto houses. In 2026, a building permit was filed: "Proposal to install emergency lighting". Status: examiner's notice sent. In 2026, a building permit was filed: "Proposal for fire alarm system and emergency lighting upgrade". Status: permit issued. In 2025, a building permit was filed: "Proposal for wholesale replacement of roof membrane and roof insulation systems. potential replacement of select roof-mounted hvac units". Status: inspection. 5 open permits mean the City has not closed the files. Ask the seller whether the work was finished and passed its final inspection.

Within 300 m, 16 development applications are open (the tallest up to 61 storeys). Osgoode station is a 9-minute walk, and the lot is in its Major Transit Station Area.

Summary

What the City's records show on this house

  • 3 building permits open, the oldest since 2008ModerateFree check
  • Heritage property: in a Heritage Conservation District (Part V)Moderate
  • Work or applications in progressModerateFree check
  • Site-specific exception 900.12.10(74)Moderate
  • 16 development applications open within 300 mLowFree check
  • 5 City trees in front of this lotLowFree check
  • King-Spadina Secondary PlanLow

Left unchecked, any of these can mean unexpected costs, trouble after closing, or plans you can't carry out. Found before you offer, they give you room to negotiate. The full report explains what each one means for this house and what to do next.

Unlock the full report

15 sets of public records, already checked for you. Searching each one yourself and working out what it means for you takes time. We have done that work: what matters about this house and lot, in plain English, in a few minutes.

What to find out first

3 things to check before you offer.

What to find out before an offer, the steps to take, what each costs and how long it takesUnlock

Check carefully

Open City files

How much in the City's records needs answers before an offer

  • 3 building permits open, the oldest since 2008
  • Work or applications in progress
  • No open orders or by-law investigations

What this part means for this house, in plain EnglishUnlock

  1. 3 building permits open, the oldest since 2008

    ModerateCheck before you offer

    What the record shows, what it means for you and what to doUnlock

  2. Work or applications in progress

    ModerateCheck before you offer

    What the record shows, what it means for you and what to doUnlock

City files on this lot

14 records on file, more than at 99% of Toronto houses (median 0 records).

DateRecordAs the City filed itIn plain wordsStatus
2026-03-06Building permit
26 125724
Proposal to install Emergency Lighting.Examiner's Notice Sent
2026-03-04Building permit
26 111204
Proposal for fire Alarm system and emergency lighting upgradePermit Issued
2025-06-20Building permit
25 165183
Proposal for wholesale replacement of roof membrane and roof insulation systems. potential replacement of select roof-mounted hvac units.Inspection
2021-06-11Building permit
21 168401
PROPOSED: HVAC upgrades to buildingClosed
2021-06-04Building permit
21 140336
Proposal for interior alterations to all floor levels in an existing municipal shelter. Scope of work includes new universal washroom, staff servery, reception areas, new private offices, and floor infills in 2 open to below locations on the ground floor.Permit Issued
2015-11-19Building permit
15 252264
THE SCOPE OF WORK IS:DEMOLISH EXISTING ENCLOSED RECEPTION DESK AND INSTALL NEW ENCLOSED DESK WITH GLASS PROTECTION PANEL IN THE SAME LOCATION- main level reception areaClosed
2012-04-04Building permit
11 325094
This is for a new elevator installation including a new smoking area on the roof.Closed
2010-11-30Building permit
07 279817
Revision: Proposed interior alterations to all floors.[Interior alterations to existing non res (restaurant/entertainment facility) for purposes of Municipal Shelter. Also proposed are alterations to roof level for outdoor amenity space pruposes. ]Revision Issued
2008-11-10Building permit
08 213497
Proposal for the installation of four(4) maglocks. One(1) maglock in basement, one(1) maglock on ground floor and two(2) maglocks on the 2nd floor. Building is currently under construction for a future shelter.Inspection
2007-02-15Zoning review
07 109623 ZPU
No description on fileClosed
2006-05-30Building permit
06 140708
Proposal to install 1 new bar sink on the ground floor of existing restaurant.Closed
1999-03-02Zoning review
99 022040 LTO
No description on fileClosed
1995-05-10Zoning review
95 025081 LTO
No description on fileClosed
1991-02-18Zoning review
91 026116 LTO
No description on fileClosed
Some

Restrictions

How much heritage, nature and site-specific rules limit changes to the house

  • Heritage property: in a Heritage Conservation District (Part V)
  • Site-specific exception 900.12.10(74)

What this part means for this house, in plain EnglishUnlock

  1. Heritage property: in a Heritage Conservation District (Part V)

    ModerateCheck before you offer

    What the record shows, what it means for you and what to doUnlock

  2. Site-specific exception 900.12.10(74)

    ModerateCheck if it applies

    What the record shows, what it means for you and what to doUnlock

  3. 5 City trees in front of this lot

    LowFor later, once you own it

    What the record shows, what it means for you and what to doUnlock

  4. King-Spadina Secondary Plan

    LowFor later, once you own it

    What the record shows, what it means for you and what to doUnlock

If you want to change or build

What the site-specific rules mean for an addition, a garage or a rebuild.

Site-specific exception 900.12.10(74)

What the exception changes for this address, rule by ruleUnlock

Not on this lot

Flood and erosion rules

How much of the lot lies in the areas TRCA regulates for flooding and erosion

  • Outside the areas TRCA regulates

From TRCA's regulated areas only. Basement flooding, sewer back-up and the TRCA flood plain are not in this score yet; ask the seller and your insurer about water in the basement.

What this part means for this house, in plain EnglishUnlock

Little left to add

Build potential

How much more the rules allow on this lot, beyond what is on record

What this part means for this house, in plain EnglishUnlock

The lot and what the rules allow

N10 m
19.0 m frontage25.7 m deepon Peter St
Zone
CRE (x74)
Height limit
30 m
Corner lot
No
Public lane
None
House footprint
404 m²
Back yard
3.4 m
Buildings on the lot
1

House and yards from the City's 3D Massing; a survey gives exact figures.

What you can build

    Why, measured on this lot, and the most you could buildUnlock

    Busy

    Building nearby

    How much neighbours are building and applying to change within 300 m

    • 16 development applications open within 300 m, up to 61 storeys
    • In the Queen-Spadina station area
    • 4 suite and multiplex permits within 300 m in 10 years

    What this part means for this house, in plain EnglishUnlock

    1. 16 development applications open within 300 m

      LowCheck if it applies

      What the record shows, what it means for you and what to doUnlock

    What the City allowed next door

    Within 500 m, last 10 years: a guide if you plan to build or apply for something similar.

    What neighbours have built and changed around you, and how the City decidedUnlock

    Crime above median

    Area safety

    Police-reported crime in the neighbourhood against the Toronto median

    • Lower than the Toronto median in 1 of 8 categories
    • Theft over $5,000: 1.9 times the Toronto median
    • Assault: 1.8 times the Toronto median
    • Break and enter: 1.7 times the Toronto median

    Neighbourhood rates per 100,000 people from the Toronto Police Service, not this street.

    What this part means for this house, in plain EnglishUnlock

    Wellington Place neighbourhood

    About the area, not this house.

    2021 Census, against the median Toronto neighbourhood

    Median household income (2020)$90,000median $84,500
    Households that own their home38%median 54%
    Population (2021)25,570median 16,813
    Homes built in 1960 or before2%median 29%
    Homes needing major repairs1%median 7%

    Getting around and schools

    • Osgoode StationNearest station9 min walk
    • Queen St West at Peter StNearest TTC stop1 min walk
    • Peter StNearest cycling route1 min walk
    • Ogden Jr Public SchoolSchool3 min walk
    • OCAD University - Inclusive Design InstituteSchool6 min walk
    • OCAD University - Student CentreSchool7 min walk
    • OCAD University - Aboveground Art SuppliesSchool7 min walk

    Police-reported crime, 2025, per 100,000 people

    • Assaultcity median 636.31169.6
    • Robberycity median 69.582
    • Homicidecity median 5.35.3
    • Shootingscity median 10.510.6
    • Auto theftcity median 192.697.9
    • Theft over $5,000city median 46.187.3
    • Break and entercity median 172.8293.7
    • Theft from vehiclescity median 188.1211.7

    More about Wellington Place

    Ready emails

    Copy and send as they are.

    4 questions for the seller and your lawyer, written outUnlock

    What we checked, and what the City's records don't cover

    We checked 48 sets of City of Toronto, TRCA and Statistics Canada open data for this address, last updated Nov 27, 2026. Our records don't cover flooding history, ownership and mortgages, or the condition of the house: ask the seller and your insurer about water in the basement, your lawyer about title, and book a home inspection.

    See every source and when we loaded it · Pre-offer checklist

    Something here not right?

    Screening tool based on City of Toronto and TRCA open data. Not a zoning review or legal opinion. Site-specific exceptions, amendments not yet in the open data, minor variances and other by-laws can change the answer. Confirm with a Preliminary Project Review or Zoning Certificate from Toronto Building before buying or designing.

    Scores calibrated on Toronto house lots on 2026-10-19; prices and sources checked on 2026-10-06. Contains information licensed under the Open Government Licence – Toronto. TRCA regulation limits © Toronto and Region Conservation Authority.

    Full pre-offer report · 129 Peter St

    3 things to check at 129 Peter St before you offer

    • 3 building permits open, the oldest since 2008Moderate
    • Heritage property: in a Heritage Conservation District (Part V)Moderate
    • Work or applications in progressModerate
    • Site-specific exception 900.12.10(74)Moderate
    • and 3 more

    The report explains what each one can cost you on this house and what to ask the seller or the City before you offer.

    $29 CAD one time · opens right away

    See a sample report

    Full refund within 30 days if the report left out or misstated a City record on the lot. Refund policy

    Also in the report

    • A PDF to forward to your agent and lawyer
    • What you can build on this lot, measured on it
    • Every line linked to the City record it comes from
    • 15 sets of public records, already searched and read for you
    • A clear list of the 8 steps to take before you offer, so nothing slips
    • What each of the 7 findings can cost you or stop you doing, in plain English
    • A two-minute summary of this house, and what to find out first before you offer
    • What the City allowed your neighbours, a guide if you plan to build or apply for something similar
    • We watch this address for 90 days. If anything changes in the City's records, we email you the same day
    • A short summary of each part: City files, restrictions, flood and erosion, build potential, building nearby, area safety

    By paying you agree to the terms of use and the refund policy. Payment by Stripe. The report opens right after payment, and we email you a link to it; your account is made from the email you pay with. A screening of public records, not a legal opinion or a home inspection.

    Flag an error

    What is not right?

    The problem

    The records come from the City's open data; we check each flag against them. Your email is used only to answer this.