Everything here comes from public records: City of Toronto open data, TRCA and Statistics Canada, 15 sets in all. Each item leads to the record it comes from. Our sources
This house at a glance
Each score from 0 to 10: 0 needs attention, 10 all clear. Build potential is how much more you could add.
About 1262 Yonge St
1262 Yonge St is on a 7.3 m by 30.6 m lot on Yonge St in Yonge-St.Clair. The zoning is CR. A site-specific exception, 900.11.10(2524), changes some of the usual rules for this address.
The City has 5 records on this lot since 2025. That is more than at 93% of Toronto houses. In 2026, a building permit was filed: "Rev 01: revision to ground floor & basement layout for group a-2 eating establishment (75 indoor seats). incl. revised structural, electrical life safety &…". Status: revision issued. In 2026, a Committee of Adjustment application was filed: "To permit an eating establishment use (restaurant) that is occupying the ground floor area of the existing three-storey mixed-use building. the existing two…". Status: closed. In 2026, a building permit was filed: "Proposal to construct a bench footing in a portion of the basement to lower a portion of the basement". Status: closed. An open permit means the City has not closed the file. Ask the seller whether the work was finished and passed its final inspection. There is 1 open order or by-law investigation on file. Ask the seller what is outstanding and whether it will be fixed before closing.
Within 300 m, 10 development applications are open (the tallest up to 49 storeys). Summerhill station is a 2-minute walk, and the lot is in its Major Transit Station Area.
Summary
What the City's records show on this house
- 1 open by-law investigationModerate
- Work or applications in progressModerateFree check
- Site-specific exception 900.11.10(2524)Moderate
- 1 by-law investigation closed in the last two yearsLow
- 10 development applications open within 300 mLowFree check
- Yonge-St. Clair Secondary PlanLow
- 1 Committee of Adjustment file on this lotLowFree check
Left unchecked, any of these can mean unexpected costs, trouble after closing, or plans you can't carry out. Found before you offer, they give you room to negotiate. The full report explains what each one means for this house and what to do next.
15 sets of public records, already checked for you. Searching each one yourself and working out what it means for you takes time. We have done that work: what matters about this house and lot, in plain English, in a few minutes.
What to find out first
2 things to check before you offer.
What to find out before an offer, the steps to take, what each costs and how long it takesUnlock
Open City files
How much in the City's records needs answers before an offer
- 1 open by-law investigation
- Work or applications in progress
- 1 by-law investigation closed in the last two years
What this part means for this house, in plain EnglishUnlock
1 open by-law investigation
ModerateCheck before you offerWhat the record shows, what it means for you and what to doUnlock
Work or applications in progress
ModerateCheck before you offerSee the open permit check for this house
What the record shows, what it means for you and what to doUnlock
1 by-law investigation closed in the last two years
LowCheck if it appliesWhat the record shows, what it means for you and what to doUnlock
1 Committee of Adjustment file on this lot
LowFor later, once you own itSee the next door check for this house
What the record shows, what it means for you and what to doUnlock
What this means: Building permits before buyingWhat this means: Committee of Adjustment
City files on this lot
5 records on file, more than at 93% of Toronto houses (median 0 records).
| Date | Record | As the City filed it | In plain words | Status |
|---|---|---|---|---|
| 2026-08-07 | Building permit26 129970 | REV 01: REVISION TO GROUND FLOOR & BASEMENT LAYOUT FOR GROUP A-2 EATING ESTABLISHMENT (75 INDOOR SEATS). INCL. REVISED STRUCTURAL, ELECTRICAL LIFE SAFETY & SPRINKLER DRAWINGS. NOTE: PERMIT REVISION FOLLOWS COA APPROVAL OF MV FOR INCREASED RESTAURANT AREAGround floor change of use to group E eating establishment (w/ less than 30 seats). | Revision Issued | |
| 2026-06-03 | Minor varianceA0302/26TEY | To permit an eating establishment use (restaurant) that is occupying the ground floor area of the existing three-storey mixed-use building. The existing two residential dwelling units (occupying the second and third levels) will be maintained and unaltered. | Approved | |
| 2026-03-13 | Building permit26 118911 | Proposal to construct a bench footing in a portion of the basement to lower a portion of the basement. | Closed | |
| 2026-01-13 | By-law investigation26 104423 PRS 00 IR | Property Standards | Rescheduled | |
| 2025-11-07 | By-law investigation25 251227 PRS 00 IR | Property Standards | Closed |
Restrictions
How much heritage, nature and site-specific rules limit changes to the house
- Site-specific exception 900.11.10(2524)
- No heritage listing or designation
What this part means for this house, in plain EnglishUnlock
Site-specific exception 900.11.10(2524)
ModerateCheck if it appliesWhat the record shows, what it means for you and what to doUnlock
Yonge-St. Clair Secondary Plan
LowFor later, once you own itWhat the record shows, what it means for you and what to doUnlock
What this means: Toronto zoning by address
If you want to change or build
What the site-specific rules mean for an addition, a garage or a rebuild.
Site-specific exception 900.11.10(2524)
What the exception changes for this address, rule by ruleUnlock
Flood and erosion rules
How much of the lot lies in the areas TRCA regulates for flooding and erosion
- Outside the areas TRCA regulates
From TRCA's regulated areas only. Basement flooding, sewer back-up and the TRCA flood plain are not in this score yet; ask the seller and your insurer about water in the basement.
What this part means for this house, in plain EnglishUnlock
Build potential
How much more the rules allow on this lot, beyond what is on record
What this part means for this house, in plain EnglishUnlock
The lot and what the rules allow
- Zone
- CR 3.0 (c2.0; r2.5) SS2 (x2524)
- Height limit
- 16 m
- Corner lot
- No
- Public lane
- Ln W Yonge S Woodlawn, 9 m along it
- House footprint
- 120 m²
- Back yard
- 12.5 m
- Buildings on the lot
- 2
House and yards from the City's 3D Massing; a survey gives exact figures.
What you can build
Why, measured on this lot, and the most you could buildUnlock
Building nearby
How much neighbours are building and applying to change within 300 m
- 10 development applications open within 300 m, up to 49 storeys
- In the Summerhill station area
- 5 suite and multiplex permits within 300 m in 10 years
What this part means for this house, in plain EnglishUnlock
10 development applications open within 300 m
LowCheck if it appliesSee the next door check for this house
What the record shows, what it means for you and what to doUnlock
What the City allowed next door
Within 500 m, last 10 years: a guide if you plan to build or apply for something similar.
What neighbours have built and changed around you, and how the City decidedUnlock
Area safety
Police-reported crime in the neighbourhood against the Toronto median
- Lower than the Toronto median in 5 of 6 categories
- Break and enter: 2.2 times the Toronto median
Neighbourhood rates per 100,000 people from the Toronto Police Service, not this street.
What this part means for this house, in plain EnglishUnlock
Yonge-St.Clair neighbourhood
About the area, not this house.
2021 Census, against the median Toronto neighbourhood
Getting around and schools
- Summerhill StationNearest station2 min walk
- Yonge St at Woodlawn Ave EastNearest TTC stop1 min walk
- Yonge StNearest cycling route1 min walk
- The York School - Mdl and Sr CampusSchool2 min walk
- The Linden SchoolSchool6 min walk
- Cottingham Jr Public SchoolSchool7 min walk
- De Lasalle College SchoolSchool8 min walk
Police-reported crime, 2025, per 100,000 people
- Assaultcity median 636.3270.8
- Robberycity median 69.525.8
- Auto theftcity median 192.664.5
- Theft over $5,000city median 46.132.2
- Break and entercity median 172.8374
- Theft from vehiclescity median 188.1116.1
Ready emails
Copy and send as they are.
5 questions for the seller and your lawyer, written outUnlock
What we checked, and what the City's records don't cover
We checked 48 sets of City of Toronto, TRCA and Statistics Canada open data for this address, last updated Nov 27, 2026. Our records don't cover flooding history, ownership and mortgages, or the condition of the house: ask the seller and your insurer about water in the basement, your lawyer about title, and book a home inspection.
See every source and when we loaded it · Pre-offer checklist