Everything here comes from public records: City of Toronto open data, TRCA and Statistics Canada, 15 sets in all. Each item leads to the record it comes from. Our sources
This house at a glance
Each score from 0 to 10: 0 needs attention, 10 all clear. Build potential is how much more you could add.
About 12 Cordova Ave
12 Cordova Ave is on a 13.4 m by 29.6 m lot on Cordova Ave in Etobicoke City Centre. This lot is not covered by Toronto's city-wide zoning by-law 569-2013, so a by-law of the former city or borough most likely still applies. Toronto Building can confirm which one.
The City has 12 records on this lot since 2018. That is more than at 99% of Toronto houses. In 2026, a building permit was filed: "The proposed interconnected floor space, created by a new open communication stair having floor openings of approximately 13m2 will perform as well as the…". Status: approved. In 2026, a building permit was filed: "Jan 30/26: eft instructions sent to applicnt to issued fnd pp -ekpart permit - 24-storey residential building located south of the intersection of dundas…". Status: closed. In 2025, a building permit was filed: "Deferred fees from folder 23 215049 (rsn-5350153) zoningprocess rsn 73712669". Status: open. 2 open permits mean the City has not closed the files. Ask the seller whether the work was finished and passed its final inspection.
Within 300 m, 5 development applications are open (the tallest up to 45 storeys). Within 300 m, the Committee of Adjustment decided 13 minor variance applications in the last 10 years and approved 85%. Islington station is a 7-minute walk.
Summary
What the City's records show on this house
- Building permit open since 2024ModerateFree check
- Work or applications in progressModerateFree check
- Records mention multiplexModerateFree check
- Zoning not in By-law 569-2013Moderate
- 5 development applications open within 300 mLowFree check
- 1 Committee of Adjustment file on this lotLowFree check
Left unchecked, any of these can mean unexpected costs, trouble after closing, or plans you can't carry out. Found before you offer, they give you room to negotiate. The full report explains what each one means for this house and what to do next.
15 sets of public records, already checked for you. Searching each one yourself and working out what it means for you takes time. We have done that work: what matters about this house and lot, in plain English, in a few minutes.
What to find out first
4 things to check before you offer.
What to find out before an offer, the steps to take, what each costs and how long it takesUnlock
Open City files
How much in the City's records needs answers before an offer
- Building permit open since 2024
- Work or applications in progress
- Records mention multiplex
What this part means for this house, in plain EnglishUnlock
Building permit open since 2024
ModerateCheck before you offerSee the open permit check for this house
What the record shows, what it means for you and what to doUnlock
Work or applications in progress
ModerateCheck before you offerSee the open permit check for this house
What the record shows, what it means for you and what to doUnlock
Records mention multiplex
ModerateCheck before you offerSee the basement apartment check for this house
What the record shows, what it means for you and what to doUnlock
1 Committee of Adjustment file on this lot
LowFor later, once you own itSee the next door check for this house
What the record shows, what it means for you and what to doUnlock
What this means: Toronto zoning by addressWhat this means: Building permits before buyingWhat this means: Committee of Adjustment
City files on this lot
12 records on file, more than at 99% of Toronto houses (median 0 records).
| Date | Record | As the City filed it | In plain words | Status |
|---|---|---|---|---|
| 2026-07-16 | Building permit26 203349 | The proposed interconnected floor space, created by a new open communication stair having floor openings of approximately 13m2 will perform as well as the acceptable solution considering that the interconnected floor space will be : 1) Located in a Group A2 occupancy 2) Sprinklered and located in a sprinklered building 3) Provided with closely spaced sprinklers and draft stops in accordance with NFPA 13 which will act as an enclosure to this stair; and 4) Provided with smoke detectors on the ceiling on the vicinity of the opening through floor assemblies. | Approved | |
| 2026-03-02 | Building permit23 215049 | Jan 30/26: EFT instructions sent to applicnt to issued FND PP -EKPart Permit - 24-storey residential building located south of the intersection of Dundas Street West and CordovaAvenue with a total of 325 residential dwelling units and 4 levels of below grade parking and a mix of indoor and outdoor amenities. | Closed | |
| 2025-06-25 | Building permit25 215049 | Deferred Fees from folder 23 215049 (RSN-5350153) ZoningProcess RSN 73712669 | Open | |
| 2024-09-18 | Building permit24 188707 | Proposal for Installation of the geothermal (earth energy) system | Permit Issued | |
| 2024-09-10 | Building permit24 210832 | Proposal for an alternative solution for a standpipe system | Approved | |
| 2024-01-18 | Minor varianceA0445/23EYK | To modify the number of dwelling units, gross floor area, setbacks, building envelope, floor plate area, building height,, 45-degree angular plane and parking requirements of the site specific By-law 1275-2022 (OLT). | Refused | |
| 2022-04-12 | Zoning review18 257584 POZ | No description on file | Closed | |
| 2022-03-01 | Building permit21 233515 | Proposal to demolish a house for a new condo development. | Closed | |
| 2021-10-22 | Development application21 229241 WET 03 CD | *** Proposed 27 storey building containing 325 residential units and 179 parking spaces in a below-grade parking structure. | Under Review | |
| 2021-06-28 | Zoning review21 167492 PSP | No description on file | Closed | |
| 2021-06-08 | Development application21 167492 WET 03 SA | The proposal consists of a 24-storey residential building (maximum height of approximately 81 metres including a mechanical penthouse/amenity space and mezzanine), with a mid-rise element having a maximum height of 11 storeys (approximately 36 metres) and a maximum 4-storey base building height (approximately 15 metres). A total of 23,549 square metres of residential gross-floor area is proposed with 325 total units, resulting in a Floor Space Index (FSI) of 9.57 times the area of the lot. Parking is proposed in a three level underground parking garage with 178 vehicular parking spaces and 244 bicycle parking spaces. | Closed | |
| 2018-11-16 | Development application18 257584 WET 05 OZ | Proposal for a terraced 27-storey apartment building stepping down to the Islington Village area to the north. A total of 325 residential units are anticipated, with a proposed density of 9.59 FSI. | Closed |
Restrictions
How much heritage, nature and site-specific rules limit changes to the house
- Zoning not in By-law 569-2013
- No heritage listing or designation
What this part means for this house, in plain EnglishUnlock
Zoning not in By-law 569-2013
ModerateCheck before you offerWhat the record shows, what it means for you and what to doUnlock
Flood and erosion rules
How much of the lot lies in the areas TRCA regulates for flooding and erosion
- Outside the areas TRCA regulates
From TRCA's regulated areas only. Basement flooding, sewer back-up and the TRCA flood plain are not in this score yet; ask the seller and your insurer about water in the basement.
What this part means for this house, in plain EnglishUnlock
Build potential
How much more the rules allow on this lot, beyond what is on record
- On record: multiplex
What this part means for this house, in plain EnglishUnlock
The lot and what the rules allow
- Zone
- —
- Height limit
- —
- Corner lot
- No
- Public lane
- Ln S Dundas W Cordova, 29.3 m along it
- House footprint
- 155 m²
- Back yard
- 9.9 m
- Buildings on the lot
- 1
House and yards from the City's 3D Massing; a survey gives exact figures.
What you can build
Why, measured on this lot, and the most you could buildUnlock
Building nearby
How much neighbours are building and applying to change within 300 m
- 5 development applications open within 300 m, up to 45 storeys
- 5 suite and multiplex permits within 300 m in 10 years
- 13 minor variance decisions within 300 m, 85% approved
What this part means for this house, in plain EnglishUnlock
5 development applications open within 300 m
LowCheck if it appliesSee the next door check for this house
What the record shows, what it means for you and what to doUnlock
What the City allowed next door
Within 500 m, last 10 years: a guide if you plan to build or apply for something similar.
What neighbours have built and changed around you, and how the City decidedUnlock
Area safety
Police-reported crime in the neighbourhood against the Toronto median
- Lower than the Toronto median in 0 of 7 categories
- Theft over $5,000: 4.4 times the Toronto median
- Auto theft: 3.1 times the Toronto median
- Robbery: 2.7 times the Toronto median
- Shootings: 1.5 times the Toronto median
Neighbourhood rates per 100,000 people from the Toronto Police Service, not this street.
What this part means for this house, in plain EnglishUnlock
Etobicoke City Centre neighbourhood
About the area, not this house.
2021 Census, against the median Toronto neighbourhood
Getting around and schools
- Islington StationNearest station7 min walk
- Cordova Ave at Dundas St West South SideNearest TTC stop1 min walk
- Mimico Creek TrlNearest cycling route5 min walk
- Islington Jr Mdl SchoolSchool2 min walk
- German International School TorontoSchool3 min walk
- Academy of Math and EnglishSchool8 min walk
- Etobicoke Collegiate InstituteSchool9 min walk
Police-reported crime, 2025, per 100,000 people
- Assaultcity median 636.3844.4
- Robberycity median 69.5187.7
- Shootingscity median 10.516.2
- Auto theftcity median 192.6601.8
- Theft over $5,000city median 46.1200.6
- Break and entercity median 172.8210.3
- Theft from vehiclescity median 188.1278.2
Ready emails
Copy and send as they are.
6 questions for the seller and your lawyer, written outUnlock
What we checked, and what the City's records don't cover
We checked 48 sets of City of Toronto, TRCA and Statistics Canada open data for this address, last updated Nov 28, 2026. Our records don't cover flooding history, ownership and mortgages, or the condition of the house: ask the seller and your insurer about water in the basement, your lawyer about title, and book a home inspection.
See every source and when we loaded it · Pre-offer checklist