HousePrecheckCheck an address

119 Chestnut StYonge-Bay Corridor, Toronto · City records before you offer

Also 153 Dundas St W

Commercial residential · CR 4.0 (c2.0; r4.0) SS1 (x1712)15.8 × 23.8 m371 m²on Chestnut Stcorner, also on Dundas St W

2 things to check before you offer, including 3 building permits open, the oldest since 2010
N10 m
15.8 m frontage23.8 m deep

Everything here comes from public records: City of Toronto open data, TRCA and Statistics Canada, 15 sets in all. Each item leads to the record it comes from. Our sources

This house at a glance

Each score from 0 to 10: 0 needs attention, 10 all clear. Build potential is how much more you could add.

About 119 Chestnut St

119 Chestnut St is on a 15.8 m by 23.8 m lot on Chestnut St in Yonge-Bay Corridor. The zoning is CR. A site-specific exception, 900.11.10(1712), changes some of the usual rules for this address. The lot also fronts Dundas St W.

The City has 21 records on this lot since 2001. That is more than at 99% of Toronto houses. In 2026, a building permit was filed: "Proposal to replace fire alarm panel". Status: inspection. In 2025, a building permit was filed: "1 wall sign". Status: closed. In 2025, a building permit was filed: "Interior alteration - units 2f - cafeconvert space from d to a2 occupancy". Status: closed. 4 open permits mean the City has not closed the files. Ask the seller whether the work was finished and passed its final inspection.

Within 300 m, 10 development applications are open (the tallest up to 72 storeys). St Patrick station is a 3-minute walk, and the lot is in its Major Transit Station Area.

Summary

What the City's records show on this house

  • 3 building permits open, the oldest since 2010ModerateFree check
  • Work or applications in progressModerateFree check
  • Site-specific exception 900.11.10(1712)Moderate
  • 3 by-law investigations closed in the last two yearsLow
  • 10 development applications open within 300 mLowFree check
  • Priority retail street: Dundas Street WestLow
  • Downtown Plan Secondary PlanLow
  • 1 Committee of Adjustment file on this lotLowFree check

Left unchecked, any of these can mean unexpected costs, trouble after closing, or plans you can't carry out. Found before you offer, they give you room to negotiate. The full report explains what each one means for this house and what to do next.

Unlock the full report

15 sets of public records, already checked for you. Searching each one yourself and working out what it means for you takes time. We have done that work: what matters about this house and lot, in plain English, in a few minutes.

What to find out first

2 things to check before you offer.

What to find out before an offer, the steps to take, what each costs and how long it takesUnlock

Check carefully

Open City files

How much in the City's records needs answers before an offer

  • 3 building permits open, the oldest since 2010
  • Work or applications in progress
  • 3 by-law investigations closed in the last two years

What this part means for this house, in plain EnglishUnlock

  1. 3 building permits open, the oldest since 2010

    ModerateCheck before you offer

    What the record shows, what it means for you and what to doUnlock

  2. Work or applications in progress

    ModerateCheck before you offer

    What the record shows, what it means for you and what to doUnlock

  3. 3 by-law investigations closed in the last two years

    LowCheck if it applies

    What the record shows, what it means for you and what to doUnlock

  4. 1 Committee of Adjustment file on this lot

    LowFor later, once you own it

    What the record shows, what it means for you and what to doUnlock

City files on this lot

21 records on file, more than at 99% of Toronto houses (median 0 records).

DateRecordAs the City filed itIn plain wordsStatus
2026-05-26By-law investigation
26 167646 PRS 00 IR
Property StandardsClosed
2026-03-11By-law investigation
26 147130 WST 00 IV
Notice Issued Waste: 841-12A(2) an owner who received services during a daytime collection period shall ensure that: (2) empty regulation containers and uncollected garbage, recycla; 841-12B(2) an owner who received services during a night time collection period shall ensure that: (3) empty regulation containers and uncollected garbage, recy; 841-12C At any time period other than a time period describe in Subsections A, B, and E, owners shall ensure that garbage, recyclable materials, and organic matClosed
2026-03-11By-law investigation
26 144568 PRS 00 IV
Notice Issued Prop Standards: Garbage storage facility not provided.Closed
2026-03-11By-law investigation
26 128170 PRS 00 IR
Property StandardsClosed
2026-03-11By-law investigation
26 128162 WST 00 IR
WasteClosed
2026-01-07Building permit
25 265351
Proposal to replace fire alarm panelInspection
2025-10-02Building permit
25 230004
1 Wall SignClosed
2025-09-19Building permit
25 215514
Interior alteration - Units 2F - CafeConvert space from D to A2 occupancyClosed
2022-09-23Building permit
22 203959
Proposal for structural repair in the existing restaurant damaged by vehicle impact.Inspection
2019-08-19Building permit
19 190725
To erect and display two wall signs, one of which is non-illuminated at the west elevation and one illuminated projecting sign and other wall sign at the north elevation of the building, all at the first storey.****GYUBEE****Closed
2018-12-20Building permit
18 265262
Proposal for interior renovations to existing restaurant, including HVAC kitchen exhaust and additional plumbing fixturesClosed
2015-04-24Building permit
15 134600
To erect and display one illuminated wall sign, an awning projecting 0.5 metre from the north and west facing first and second storey walls, displaying static copy; 2.743 metres in vertical length by 4.927 metres in horizontal width, at a height of 5.755 metres, in conjunction with a restaurant located on the premises. **YUTAKA**Closed
2015-03-02Building permit
15 118486
Proposal for interior alterations to the ground floor of existing restaurant (80m2). Requested occupant load is 115 seats. See HVA permit for new kitchen exhaust. Convenience address: 153 Dundas St WInspection
2010-10-04Building permit
10 269441
CONVENIENCE ADDRESS IS 153 DUNDAS ST W, - Permit for 2 maglocks on floor 2 of existing office space.Inspection
2010-07-29Building permit
10 212116
Interior alterations to the second floor for "MINISTRY OF CHILDREN AND YOUTH SERVICES". This is for a new office layout and will include plumbing and hvac.Closed
2007-04-18Building permit
05 128498
Proposal to revise the assembly of 2 exterior walls, interior partitions on ground and 2nd fl, and to create garbage room in place of garage. Proposed 2 storey commercial/ office building. Total Occupant Load for Restaurant on Ground Floor is 118 People (revised) plus Staff.Closed
2007-01-24Zoning review
07 104438 ZPR
No description on fileClosed
2006-09-11Zoning review
06 174259 LTO
No description on fileClosed
2006-01-25Minor variance
A0956/05TEY
The applicant is seeking relief from the provisions of Zoning By-law No. 438-86, as amended, to construct a two storey building with a restaurant on the ground floor and offices space on the second floor. The proposed building will have maximum dimensions of 15.24 metres by 24.38 metres.Approved
2005-04-28Zoning review
05 127541 PSP
No description on fileClosed
2001-06-01Building permit
01 123136
To demolish Esso station; kiosk and pump ailes.Closed
Minor

Restrictions

How much heritage, nature and site-specific rules limit changes to the house

  • Site-specific exception 900.11.10(1712)
  • Priority retail street: Dundas Street West
  • No heritage listing or designation

What this part means for this house, in plain EnglishUnlock

  1. Site-specific exception 900.11.10(1712)

    ModerateCheck if it applies

    What the record shows, what it means for you and what to doUnlock

  2. Priority retail street: Dundas Street West

    LowFor later, once you own it

    What the record shows, what it means for you and what to doUnlock

  3. Downtown Plan Secondary Plan

    LowFor later, once you own it

    What the record shows, what it means for you and what to doUnlock

If you want to change or build

What the site-specific rules mean for an addition, a garage or a rebuild.

Site-specific exception 900.11.10(1712)

What the exception changes for this address, rule by ruleUnlock

Not on this lot

Flood and erosion rules

How much of the lot lies in the areas TRCA regulates for flooding and erosion

  • Outside the areas TRCA regulates

From TRCA's regulated areas only. Basement flooding, sewer back-up and the TRCA flood plain are not in this score yet; ask the seller and your insurer about water in the basement.

What this part means for this house, in plain EnglishUnlock

Little left to add

Build potential

How much more the rules allow on this lot, beyond what is on record

What this part means for this house, in plain EnglishUnlock

The lot and what the rules allow

N10 m
15.8 m frontage23.8 m deepon Chestnut St
Zone
CR 4.0 (c2.0; r4.0) SS1 (x1712)
Height limit
30 m
Corner lot
Yes, also on Dundas St W
Public lane
None
House footprint
361 m²
Back yard
0 m
Buildings on the lot
1

House and yards from the City's 3D Massing; a survey gives exact figures.

What you can build

    Why, measured on this lot, and the most you could buildUnlock

    Busy

    Building nearby

    How much neighbours are building and applying to change within 300 m

    • 10 development applications open within 300 m, up to 72 storeys
    • In the Dundas station area
    • 2 suite and multiplex permits within 300 m in 10 years

    What this part means for this house, in plain EnglishUnlock

    1. 10 development applications open within 300 m

      LowCheck if it applies

      What the record shows, what it means for you and what to doUnlock

    What the City allowed next door

    Within 500 m, last 10 years: a guide if you plan to build or apply for something similar.

    What neighbours have built and changed around you, and how the City decidedUnlock

    Crime well above median

    Area safety

    Police-reported crime in the neighbourhood against the Toronto median

    • Lower than the Toronto median in 1 of 8 categories
    • Assault: 5.3 times the Toronto median
    • Theft over $5,000: 4.6 times the Toronto median
    • Robbery: 4.3 times the Toronto median
    • Break and enter: 3.2 times the Toronto median
    • Homicide: 2.3 times the Toronto median
    • Theft from vehicles: 2.1 times the Toronto median

    Neighbourhood rates per 100,000 people from the Toronto Police Service, not this street.

    What this part means for this house, in plain EnglishUnlock

    Yonge-Bay Corridor neighbourhood

    About the area, not this house.

    2021 Census, against the median Toronto neighbourhood

    Median household income (2020)$68,500median $84,500
    Households that own their home32%median 54%
    Population (2021)12,645median 16,813
    Homes built in 1960 or before2%median 29%
    Homes needing major repairs2%median 7%

    Getting around and schools

    • St Patrick StationNearest station3 min walk
    • Dundas St West at Chestnut StNearest TTC stop1 min walk
    • Bay StNearest cycling route3 min walk
    • Toronto Metropolitan University - Entr To Business School LobbySchool5 min walk
    • OCAD University - the Learning ZoneSchool7 min walk
    • Contact Alternative SchoolSchool7 min walk
    • OCAD University - Annex BuildingSchool7 min walk

    Police-reported crime, 2025, per 100,000 people

    • Assaultcity median 636.33361.1
    • Robberycity median 69.5300.1
    • Homicidecity median 5.312
    • Shootingscity median 10.512
    • Auto theftcity median 192.6162.1
    • Theft over $5,000city median 46.1210.1
    • Break and entercity median 172.8552.2
    • Theft from vehiclescity median 188.1402.1

    More about Yonge-Bay Corridor

    Ready emails

    Copy and send as they are.

    5 questions for the seller and your lawyer, written outUnlock

    What we checked, and what the City's records don't cover

    We checked 48 sets of City of Toronto, TRCA and Statistics Canada open data for this address, last updated Nov 27, 2026. Our records don't cover flooding history, ownership and mortgages, or the condition of the house: ask the seller and your insurer about water in the basement, your lawyer about title, and book a home inspection.

    See every source and when we loaded it · Pre-offer checklist

    Something here not right?

    Screening tool based on City of Toronto and TRCA open data. Not a zoning review or legal opinion. Site-specific exceptions, amendments not yet in the open data, minor variances and other by-laws can change the answer. Confirm with a Preliminary Project Review or Zoning Certificate from Toronto Building before buying or designing.

    Scores calibrated on Toronto house lots on 2026-10-19; prices and sources checked on 2026-10-06. Contains information licensed under the Open Government Licence – Toronto. TRCA regulation limits © Toronto and Region Conservation Authority.

    Full pre-offer report · 119 Chestnut St

    2 things to check at 119 Chestnut St before you offer

    • 3 building permits open, the oldest since 2010Moderate
    • Work or applications in progressModerate
    • Site-specific exception 900.11.10(1712)Moderate
    • 3 by-law investigations closed in the last two yearsLow
    • and 4 more

    The report explains what each one can cost you on this house and what to ask the seller or the City before you offer.

    $29 CAD one time · opens right away

    See a sample report

    Full refund within 30 days if the report left out or misstated a City record on the lot. Refund policy

    Also in the report

    • A PDF to forward to your agent and lawyer
    • What you can build on this lot, measured on it
    • Every line linked to the City record it comes from
    • 15 sets of public records, already searched and read for you
    • A clear list of the 8 steps to take before you offer, so nothing slips
    • What each of the 8 findings can cost you or stop you doing, in plain English
    • A two-minute summary of this house, and what to find out first before you offer
    • What the City allowed your neighbours, a guide if you plan to build or apply for something similar
    • We watch this address for 90 days. If anything changes in the City's records, we email you the same day
    • A short summary of each part: City files, restrictions, flood and erosion, build potential, building nearby, area safety

    By paying you agree to the terms of use and the refund policy. Payment by Stripe. The report opens right after payment, and we email you a link to it; your account is made from the email you pay with. A screening of public records, not a legal opinion or a home inspection.

    Flag an error

    What is not right?

    The problem

    The records come from the City's open data; we check each flag against them. Your email is used only to answer this.