Everything here comes from public records: City of Toronto open data, TRCA and Statistics Canada, 15 sets in all. Each item leads to the record it comes from. Our sources
This house at a glance
Each score from 0 to 10: 0 needs attention, 10 all clear. Build potential is how much more you could add.
About 1186 Woodbine Ave
1186 Woodbine Ave is on a 6.1 m by 19.3 m lot on Woodbine Ave in Danforth East York. The zoning is CR. A site-specific exception, 900.11.10(1163), changes some of the usual rules for this address.
The City has 10 records on this lot since 2007. That is more than at 99% of Toronto houses. In 2019, a building permit was filed: "Proposal to demolish existing garage on new lot created by consent application b0104/18tey to construct a new two storey sfd - detached with an integral…". Status: inspection. In 2017, a Committee of Adjustment application was filed: "To maintain the existing two-storey mixed-use building as described in consent application b0047/16tey". Status: closed. In 2011, a building permit was filed: "Proposal to demo existing 1 sty rear structure and construct a 1 sty rear addtion and interior alterations to all floors. see coa - a0556/09tey and permit for…". Status: inspection. 2 open permits mean the City has not closed the files. Ask the seller whether the work was finished and passed its final inspection.
No development applications are open within 300 m. Woodbine station is a 10-minute walk, and the lot is in its Major Transit Station Area.
Summary
What the City's records show on this house
- 2 building permits open, the oldest since 2011ModerateFree check
- Site-specific exception 900.11.10(1163)Moderate
- 4 Committee of Adjustment files on this lotLowFree check
Left unchecked, any of these can mean unexpected costs, trouble after closing, or plans you can't carry out. Found before you offer, they give you room to negotiate. The full report explains what each one means for this house and what to do next.
15 sets of public records, already checked for you. Searching each one yourself and working out what it means for you takes time. We have done that work: what matters about this house and lot, in plain English, in a few minutes.
What to find out first
1 thing to check before you offer.
What to find out before an offer, the steps to take, what each costs and how long it takesUnlock
Open City files
How much in the City's records needs answers before an offer
- 2 building permits open, the oldest since 2011
- No open orders or by-law investigations
- No work or applications in progress
What this part means for this house, in plain EnglishUnlock
2 building permits open, the oldest since 2011
ModerateCheck before you offerSee the open permit check for this house
What the record shows, what it means for you and what to doUnlock
4 Committee of Adjustment files on this lot
LowFor later, once you own itSee the next door check for this house
What the record shows, what it means for you and what to doUnlock
What this means: Building permits before buyingWhat this means: Committee of Adjustment
City files on this lot
10 records on file, more than at 99% of Toronto houses (median 0 records).
| Date | Record | As the City filed it | In plain words | Status |
|---|---|---|---|---|
| 2019-10-02 | Building permit18 189097 | Proposal to demolish existing garage on new lot created by Consent Application B0104/18TEY to construct a new two storey SFD - Detached with an integral garage. New Address: 105 Frater Avenue. See ZPR 15 - 112657 for New House Zoning Review and PLA170254 & PLA170258 for OMB Decision. | Inspection | |
| 2019-02-27 | Consent (lot split)B0104/18TEY | To obtain consent to sever the property into three parcels and to re-establish an easement/right-of-way. Parts 3, 5 and 7 will be combined with the adjacent lands to the north (Part 1) being created by Consent Application B0103/18TEY. The combined lot (Parts 1, 3, 5 and 7) will create a new lot on Frater Avenue for the purpose of constructing a three-storey detached dwelling. These lands were subject to Consent Application B0047/16TEY and Minor Variance Applications A0757/16TEY, A0758/16TEY and A0759/16TEY which were approved previously by the Ontario Municipal Board (OMB). The consent however lapsed, necessitating the current application. | Approved | |
| 2017-02-15 | Consent (lot split)B0047/16TEY | To obtain consent to sever the property into three parcels and to re-establish an easement/right-of-way. The rear parcel (Parts 3, 5 and 7) will be combined with Part 1 to the north created by Consent Application B0046/16TEY. The combined lot (Parts 1, 3, 5 and 7) will ultimately create a new lot on Frater Avenue. | Refused | |
| 2017-02-15 | Minor varianceA0758/16TEY | To maintain the existing two-storey mixed-use building as described in Consent Application B0047/16TEY. | Refused | |
| 2015-02-05 | Zoning review15 112665 ZZC | No description on file | Closed | |
| 2015-02-05 | Zoning review15 112657 ZPR | No description on file | Closed | |
| 2011-01-28 | Building permit10 123469 | Proposal to demo existing 1 sty rear structure and construct a 1 sty rear addtion and interior alterations to all floors. See COA - A0556/09TEY and permit for adjacent property 1188 Woodbine Ave. | Inspection | |
| 2009-10-07 | Minor varianceA0556/09TEY | To legalize and to maintain to the rear of the existing two-storey mixed-use (commercial/residential) building, a one-storey addition constructed without a building permit. The addition is being used as storage space. | Approved | |
| 2008-10-30 | Zoning review08 217548 ZAL | No description on file | Cancelled | |
| 2007-01-03 | Zoning review07 100379 ZPU | No description on file | Closed |
Restrictions
How much heritage, nature and site-specific rules limit changes to the house
- Site-specific exception 900.11.10(1163)
- No heritage listing or designation
What this part means for this house, in plain EnglishUnlock
Site-specific exception 900.11.10(1163)
ModerateCheck if it appliesWhat the record shows, what it means for you and what to doUnlock
What this means: Toronto zoning by address
If you want to change or build
What the site-specific rules mean for an addition, a garage or a rebuild.
Site-specific exception 900.11.10(1163)
What the exception changes for this address, rule by ruleUnlock
Flood and erosion rules
How much of the lot lies in the areas TRCA regulates for flooding and erosion
- Outside the areas TRCA regulates
From TRCA's regulated areas only. Basement flooding, sewer back-up and the TRCA flood plain are not in this score yet; ask the seller and your insurer about water in the basement.
What this part means for this house, in plain EnglishUnlock
Build potential
How much more the rules allow on this lot, beyond what is on record
What this part means for this house, in plain EnglishUnlock
The lot and what the rules allow
- Zone
- CR 2.5 (c2.5; r1.0) SS2 (x1163)
- Height limit
- 10.5 m
- Corner lot
- No
- Public lane
- None
- House footprint
- 73 m²
- Back yard
- 5 m
- Buildings on the lot
- 1
House and yards from the City's 3D Massing; a survey gives exact figures.
What you can build
Why, measured on this lot, and the most you could buildUnlock
Building nearby
How much neighbours are building and applying to change within 300 m
- 1 development application within 300 m in 10 years, none open
- In the Woodbine station area
- 21 suite and multiplex permits within 300 m in 10 years
What this part means for this house, in plain EnglishUnlock
What the City allowed next door
Within 500 m, last 10 years: a guide if you plan to build or apply for something similar.
What neighbours have built and changed around you, and how the City decidedUnlock
Area safety
Police-reported crime in the neighbourhood against the Toronto median
- Lower than the Toronto median in 5 of 7 categories
Neighbourhood rates per 100,000 people from the Toronto Police Service, not this street.
What this part means for this house, in plain EnglishUnlock
Danforth East York neighbourhood
About the area, not this house.
2021 Census, against the median Toronto neighbourhood
Getting around and schools
- Woodbine StationNearest station10 min walk
- Woodbine Ave at Sammon AveNearest TTC stop1 min walk
- Woodbine AveNearest cycling route1 min walk
- St Brigid Catholic Elementary SchoolSchool9 min walk
- D A Morrison Mdl SchoolSchool9 min walk
- Gledhill Jr Public SchoolSchool11 min walk
- Earl Beatty Jr & Sr Public SchoolSchool12 min walk
Police-reported crime, 2025, per 100,000 people
- Assaultcity median 636.3434.5
- Robberycity median 69.510.9
- Shootingscity median 10.510.9
- Auto theftcity median 192.6184.7
- Theft over $5,000city median 46.121.7
- Break and entercity median 172.886.9
- Theft from vehiclescity median 188.1239
Ready emails
Copy and send as they are.
2 questions for the seller and your lawyer, written outUnlock
What we checked, and what the City's records don't cover
We checked 48 sets of City of Toronto, TRCA and Statistics Canada open data for this address, last updated Nov 29, 2026. Our records don't cover flooding history, ownership and mortgages, or the condition of the house: ask the seller and your insurer about water in the basement, your lawyer about title, and book a home inspection.
See every source and when we loaded it · Pre-offer checklist