HousePrecheckCheck an address

117 Yonge StDowntown Yonge East, Toronto · City records before you offer

Also 119 Yonge St, 121 Yonge St

Commercial residential · CR 12.0 (c8.0; r11.7) SS1 (x2326)15.2 × 30.1 m455 m²on Yonge Stbacks onto Ching Lane

2 things to check before you offer, including 2 building permits open, the oldest since 2019
N10 m
15.2 m frontage30.1 m deep

Everything here comes from public records: City of Toronto open data, TRCA and Statistics Canada, 15 sets in all. Each item leads to the record it comes from. Our sources

This house at a glance

Each score from 0 to 10: 0 needs attention, 10 all clear. Build potential is how much more you could add.

About 117 Yonge St

117 Yonge St is on a 15.2 m by 30.1 m lot on Yonge St in Downtown Yonge East. The zoning is CR. A site-specific exception, 900.11.10(2326), changes some of the usual rules for this address.

The City has 10 records on this lot since 2006. That is more than at 99% of Toronto houses. In 2026, a building permit was filed: "Proposed hvac revision associated to application # 21-207410 hva 00 ms". Status: permit issued. In 2022, a building permit was filed: "Application to erect one illuminated wall sign and one illuminated projecting sign, displaying static copy located at first storey of west…". Status: closed. In 2021, a building permit was filed: "Hvac - interior alterations - canna north store - first floor 117". Status: closed. 3 open permits mean the City has not closed the files. Ask the seller whether the work was finished and passed its final inspection.

Within 300 m, 12 development applications are open (the tallest up to 80 storeys). Within 300 m, the Committee of Adjustment decided 17 minor variance applications in the last 10 years and approved 100%. Queen station is a 3-minute walk, and the lot is in its Major Transit Station Area.

Summary

What the City's records show on this house

  • 2 building permits open, the oldest since 2019ModerateFree check
  • Work or applications in progressModerateFree check
  • Site-specific exception 900.11.10(2326)Moderate
  • 12 development applications open within 300 mLowFree check
  • Priority retail street: Yonge StreetLow
  • Downtown Plan Secondary PlanLow

Left unchecked, any of these can mean unexpected costs, trouble after closing, or plans you can't carry out. Found before you offer, they give you room to negotiate. The full report explains what each one means for this house and what to do next.

Unlock the full report

15 sets of public records, already checked for you. Searching each one yourself and working out what it means for you takes time. We have done that work: what matters about this house and lot, in plain English, in a few minutes.

What to find out first

2 things to check before you offer.

What to find out before an offer, the steps to take, what each costs and how long it takesUnlock

Check carefully

Open City files

How much in the City's records needs answers before an offer

  • 2 building permits open, the oldest since 2019
  • Work or applications in progress
  • No open orders or by-law investigations

What this part means for this house, in plain EnglishUnlock

  1. 2 building permits open, the oldest since 2019

    ModerateCheck before you offer

    What the record shows, what it means for you and what to doUnlock

  2. Work or applications in progress

    ModerateCheck before you offer

    What the record shows, what it means for you and what to doUnlock

City files on this lot

10 records on file, more than at 99% of Toronto houses (median 0 records).

DateRecordAs the City filed itIn plain wordsStatus
2026-10-19Building permit
26 249463
Proposed HVAC revision associated to application # 21-207410 HVA 00 MSPermit Issued
2022-10-27Building permit
22 176347
Application to erect one illuminated wall sign and one illuminated projecting sign, displaying static copy located at first storey of west elevation.Dimensions:Wall sign: 1.55m L x 4.1m W x 0.19m D at a height of 4.50mProjecting sign: 0.71m L x 0.71m W x 0.15m D at a height of 3.66m.****CANNA NORTH CANNABIS***Closed
2021-09-29Building permit
21 207410
HVAC - Interior alterations - Canna North Store - First Floor 117Closed
2020-07-03Building permit
20 133763
Proposed interior alterations for new tenant fitout - 'Meta Growth' a cannabis retail store.Permit Issued
2019-04-10Building permit
17 209401
Revision #3: Revision to door opening at #121 Yonge St. Includes revision to electrical and HVAC.REV 02 - 2nd floor changes to accomodate chiropractic service layoutREV 01- 2nd floor rear addition removed.Proposal to construct a rear second floor addition to the existing building at 119 and 121 Yonge St. for a new chiropractor office at the second floor.Revision Issued
2018-06-08Building permit
18 155339
To erect and display three wall signs and two projecting signs, all illuminated and displaying static copy, on the easterly elevation of the building. **NOVELTY**Closed
2017-04-28Zoning review
17 150923 ZZC
No description on fileClosed
2014-06-10Zoning review
14 171411 LTO
No description on fileClosed
2008-10-24Building permit
08 207696
Permit to rebuild rear wall of existing money exchange establishment - existing foundations to remain - east / rear elevation.Closed
2006-11-17Building permit
06 185377
permit for interior alterations to basement and ground floor - installation of BF bathroom on ground floor and widening basement to ground floor stairway. and fire rating ceiling in basement and rear portion of ground floor.Closed
Minor

Restrictions

How much heritage, nature and site-specific rules limit changes to the house

  • Site-specific exception 900.11.10(2326)
  • Priority retail street: Yonge Street
  • No heritage listing or designation

What this part means for this house, in plain EnglishUnlock

  1. Site-specific exception 900.11.10(2326)

    ModerateCheck if it applies

    What the record shows, what it means for you and what to doUnlock

  2. Priority retail street: Yonge Street

    LowFor later, once you own it

    What the record shows, what it means for you and what to doUnlock

  3. Downtown Plan Secondary Plan

    LowFor later, once you own it

    What the record shows, what it means for you and what to doUnlock

If you want to change or build

What the site-specific rules mean for an addition, a garage or a rebuild.

Site-specific exception 900.11.10(2326)

What the exception changes for this address, rule by ruleUnlock

Not on this lot

Flood and erosion rules

How much of the lot lies in the areas TRCA regulates for flooding and erosion

  • Outside the areas TRCA regulates

From TRCA's regulated areas only. Basement flooding, sewer back-up and the TRCA flood plain are not in this score yet; ask the seller and your insurer about water in the basement.

What this part means for this house, in plain EnglishUnlock

Little left to add

Build potential

How much more the rules allow on this lot, beyond what is on record

What this part means for this house, in plain EnglishUnlock

The lot and what the rules allow

N10 m
15.2 m frontage30.1 m deepon Yonge St
Zone
CR 12.0 (c8.0; r11.7) SS1 (x2326)
Height limit
76 m
Corner lot
No
Public lane
Ching Lane, 15.2 m along it
House footprint
455 m²
Back yard
0 m
Buildings on the lot
1

House and yards from the City's 3D Massing; a survey gives exact figures.

What you can build

    Why, measured on this lot, and the most you could buildUnlock

    Busy

    Building nearby

    How much neighbours are building and applying to change within 300 m

    • 12 development applications open within 300 m, up to 80 storeys
    • In the Dundas station area
    • 17 minor variance decisions within 300 m, 100% approved

    What this part means for this house, in plain EnglishUnlock

    1. 12 development applications open within 300 m

      LowCheck if it applies

      What the record shows, what it means for you and what to doUnlock

    What the City allowed next door

    Within 500 m, last 10 years: a guide if you plan to build or apply for something similar.

    What neighbours have built and changed around you, and how the City decidedUnlock

    Crime well above median

    Area safety

    Police-reported crime in the neighbourhood against the Toronto median

    • Lower than the Toronto median in 1 of 7 categories
    • Assault: 3.7 times the Toronto median
    • Theft over $5,000: 2.2 times the Toronto median
    • Theft from vehicles: 2.1 times the Toronto median
    • Robbery: 2.1 times the Toronto median
    • Break and enter: 1.6 times the Toronto median

    Neighbourhood rates per 100,000 people from the Toronto Police Service, not this street.

    What this part means for this house, in plain EnglishUnlock

    Downtown Yonge East neighbourhood

    About the area, not this house.

    2021 Census, against the median Toronto neighbourhood

    Median household income (2020)$69,500median $84,500
    Households that own their home36%median 54%
    Population (2021)17,700median 16,813
    Homes built in 1960 or before7%median 29%
    Homes needing major repairs4%median 7%

    Getting around and schools

    • Queen StationNearest station3 min walk
    • Adelaide St West at Yonge St - King StationNearest TTC stop1 min walk
    • Adelaide St ENearest cycling route1 min walk
    • Victoria Street LincSchool1 min walk
    • Keystone International SchoolsSchool3 min walk
    • St Michael's Choir School - Gymnasium BldgSchool7 min walk
    • St Michael's Choir School - Choral BldgSchool8 min walk

    Police-reported crime, 2025, per 100,000 people

    • Assaultcity median 636.32360.8
    • Robberycity median 69.5143.3
    • Shootingscity median 10.511.9
    • Auto theftcity median 192.675.6
    • Theft over $5,000city median 46.199.5
    • Break and entercity median 172.8274.7
    • Theft from vehiclescity median 188.1390.1

    More about Downtown Yonge East

    Ready emails

    Copy and send as they are.

    4 questions for the seller and your lawyer, written outUnlock

    What we checked, and what the City's records don't cover

    We checked 48 sets of City of Toronto, TRCA and Statistics Canada open data for this address, last updated Nov 27, 2026. Our records don't cover flooding history, ownership and mortgages, or the condition of the house: ask the seller and your insurer about water in the basement, your lawyer about title, and book a home inspection.

    See every source and when we loaded it · Pre-offer checklist

    Something here not right?

    Screening tool based on City of Toronto and TRCA open data. Not a zoning review or legal opinion. Site-specific exceptions, amendments not yet in the open data, minor variances and other by-laws can change the answer. Confirm with a Preliminary Project Review or Zoning Certificate from Toronto Building before buying or designing.

    Scores calibrated on Toronto house lots on 2026-10-19; prices and sources checked on 2026-10-06. Contains information licensed under the Open Government Licence – Toronto. TRCA regulation limits © Toronto and Region Conservation Authority.

    Full pre-offer report · 117 Yonge St

    2 things to check at 117 Yonge St before you offer

    • 2 building permits open, the oldest since 2019Moderate
    • Work or applications in progressModerate
    • Site-specific exception 900.11.10(2326)Moderate
    • 12 development applications open within 300 mLow
    • and 2 more

    The report explains what each one can cost you on this house and what to ask the seller or the City before you offer.

    $29 CAD one time · opens right away

    See a sample report

    Full refund within 30 days if the report left out or misstated a City record on the lot. Refund policy

    Also in the report

    • A PDF to forward to your agent and lawyer
    • What you can build on this lot, measured on it
    • Every line linked to the City record it comes from
    • 15 sets of public records, already searched and read for you
    • A clear list of the 7 steps to take before you offer, so nothing slips
    • What each of the 6 findings can cost you or stop you doing, in plain English
    • A two-minute summary of this house, and what to find out first before you offer
    • What the City allowed your neighbours, a guide if you plan to build or apply for something similar
    • We watch this address for 90 days. If anything changes in the City's records, we email you the same day
    • A short summary of each part: City files, restrictions, flood and erosion, build potential, building nearby, area safety

    By paying you agree to the terms of use and the refund policy. Payment by Stripe. The report opens right after payment, and we email you a link to it; your account is made from the email you pay with. A screening of public records, not a legal opinion or a home inspection.

    Flag an error

    What is not right?

    The problem

    The records come from the City's open data; we check each flag against them. Your email is used only to answer this.