Everything here comes from public records: City of Toronto open data, TRCA and Statistics Canada, 15 sets in all. Each item leads to the record it comes from. Our sources
This house at a glance
Each score from 0 to 10: 0 needs attention, 10 all clear. Build potential is how much more you could add.
About 117 St George St
117 St George St is on a 87.1 m by 60.5 m lot on St George St in University. This lot is not covered by Toronto's city-wide zoning by-law 569-2013, so a by-law of the former city or borough most likely still applies. Toronto Building can confirm which one. The property is designated under Part IV of the Ontario Heritage Act, so changes to its heritage features need a City heritage permit.
The City has 25 records on this lot since 1994. That is more than at 99% of Toronto houses. In 2024, a building permit was filed: "Proposal to upgrade the utilities including a new steam and condensate concrete trench, associated valve chambers, pipework, plus power & communications…". Status: inspection. In 2023, a building permit was filed: "Fs - sprinkler shop drawing - proposal to construct a 6 storey addition to existing woodsworth college - university of torontosee also 19 226746 sa". Status: closed. In 2023, a building permit was filed: "Proposal for an alternative solution for an exit stairwell with several vertical glazed screens protected by window sprinklers". Status: approved. 3 open permits mean the City has not closed the files. Ask the seller whether the work was finished and passed its final inspection. There are 2 open orders or by-law investigations on file. Ask the seller what is outstanding and whether it will be fixed before closing.
Within 300 m, 7 development applications are open (the tallest up to 36 storeys). Within 300 m, the Committee of Adjustment decided 5 minor variance applications in the last 10 years and approved 80%. St. George station is a 3-minute walk.
Summary
What the City's records show on this house
- 2 open orders or by-law investigationsSerious
- 3 building permits open, the oldest since 2010ModerateFree check
- Heritage property: designated (Part IV)Moderate
- Zoning not in By-law 569-2013Moderate
- 7 development applications open within 300 mLowFree check
Left unchecked, any of these can mean unexpected costs, trouble after closing, or plans you can't carry out. Found before you offer, they give you room to negotiate. The full report explains what each one means for this house and what to do next.
15 sets of public records, already checked for you. Searching each one yourself and working out what it means for you takes time. We have done that work: what matters about this house and lot, in plain English, in a few minutes.
What to find out first
4 things to check before you offer, 1 of them serious.
What to find out before an offer, the steps to take, what each costs and how long it takesUnlock
Open City files
How much in the City's records needs answers before an offer
- 2 open orders or by-law investigations
- 3 building permits open, the oldest since 2010
- No work or applications in progress
What this part means for this house, in plain EnglishUnlock
2 open orders or by-law investigations
SeriousCheck before you offerWhat the record shows, what it means for you and what to doUnlock
3 building permits open, the oldest since 2010
ModerateCheck before you offerSee the open permit check for this house
What the record shows, what it means for you and what to doUnlock
What this means: Building permits before buying
City files on this lot
25 records on file, more than at 99% of Toronto houses (median 0 records).
| Date | Record | As the City filed it | In plain words | Status |
|---|---|---|---|---|
| 2026-03-18 | By-law investigation26 145434 PRS 00 IV | Order Issued Property Standards: A barrier or deflector to prevent lighting and motorized or non-motorized vehicle lighting from shining directly into a dwelling unit is not provided and/or mai | Order Issued | |
| 2026-03-18 | By-law investigation26 131063 PRS 00 IR | Property Standards | Order Issued | |
| 2024-09-04 | Building permit21 183320 | Proposal to upgrade the utilities including a new steam and condensate concrete trench, associated valve chambers, pipework, plus power & communications ductbanks connecting mechanical and electrical rooms between St. George Parking Garage and Woodsworth College to accomodate current and future needs. Convenience address is 119 St George St**** Construction proposed on both side of property line ******* | Inspection | |
| 2024-01-22 | Building permit21 183701 | REV 01: Proposing revisions to the project¿s B1 and B2 Levels and the overall building height | Cancelled | |
| 2023-05-04 | Building permit20 229988 | FS - Sprinkler Shop Drawing - Proposal to construct a 6 storey addition to existing Woodsworth College - University of TorontoSee also 19 226746 SA. | Closed | |
| 2023-01-11 | Building permit23 102921 | Proposal for an alternative solution for an exit stairwell with several vertical glazed screens protected by window sprinklers | Approved | |
| 2022-08-30 | Building permit20 233828 | REV-01 Addition of a pipe rack structure to elevate the mechanical services (steam and condensate), a preformed corrugated steel shroud to cover mechanical pipes on an elevated structural pipe rack complete with steel tray and access hatches, and a steel stair to facilitate temporary egress during construction. | Closed | |
| 2021-11-26 | Building permit21 242347 | AS-EGRESS IN ALLEYWAY NORTH WEST & SOUTHWEST TO ST. GEORGE ST.Proposal to upgrade the utilities including a new steam and condensate concrete trench, associated valve chambers, pipework, plus power & communications ductbanks connecting mechanical and electrical rooms between St. George Parking Garage and Woodsworth College to accomodate current and future needs. Convenience address is 119 St George St. | Approved | |
| 2021-03-09 | Zoning review19 226746 PSP | No description on file | Closed | |
| 2020-11-23 | Building permit20 215445 | Proposal for interior alterations to the student registration office in the existing university "University of Toronto" | Closed | |
| 2020-09-17 | Building permit20 173666 | Proposal for addition of a sump pump to an existing sanitary line. Transitional work to prepare for future upgrades. (Convenience address is 119 St George St) see 20-173133 MSA, | Closed | |
| 2020-09-03 | Building permit20 173133 | Proposal for utility relocation at the University of Toronto St. George Campus. Transitional work to prepare for future upgrades. (Convenience address is 119 St George St). | Closed | |
| 2020-08-19 | Zoning review19 226732 PRZ | No description on file | Closed | |
| 2020-05-22 | Development application20 147617 STE 11 SA | Site Plan Amendment Application to application 11-305042 STE 20 SA. Proposed 14-storey institutional tower at the northern portion of the existing four-storey Goldring Centre for High Performance Sport, which would form the base of the building. | Closed | |
| 2019-09-25 | Development application19 226746 STE 11 SA | Proposed six-storey addition (33 metres, including mechanical penthouse) to the existing Woodsworth College institutional building consisting of approximately 3,767 square metres of new institutional floor area. | Closed | |
| 2019-09-25 | Development application19 226732 STE 11 OZ | Proposed six-storey addition (33 metres, including mechanical penthouse) to the existing Woodsworth College institutional building, consisting of approximately 3,767 square metres of new institutional floor area. | Closed | |
| 2019-05-22 | Building permit19 139874 | Proposal to install two backflow prevention devices, convenience address of 119 St George St | Closed | |
| 2019-02-11 | Building permit18 253317 | Proposed interior alterations to 4 existing classrooms on the first floor. Convenience address is 119 St George St. 'Woodsworth College' | Closed | |
| 2018-08-31 | Development application18 218741 STE 20 OZ | Proposed 14-storey institutional tower at the northern portion of the existing four-storey Goldring Centre for High Performance Sport, which would form the base of the building. | Closed | |
| 2017-11-27 | Building permit17 261511 | Interior Alterations to exisitng student lounge space - U of T Woodswoth College | Closed | |
| 2013-12-20 | Building permit13 276294 | To construct a steam/mechanical service tunnel "North Tunnel" at 105 St. George St connecting to 117 St. George St providing HVAC services to the "Goldring Sports Facility". This tunnel will enroach partial on to the rear portion on the south side of 321 Bloor St W. Note: All forms attached in Parent Folder. | Inspection | |
| 2011-11-04 | Development application11 305042 STE 20 SA | Proposal to construct new Varsity Centre (2 levels below grade and 4 levels above grade) for University of Toronto (Faculty of Physical Education) for High Performance Sports. | Closed | |
| 2010-05-27 | Building permit10 174489 | Interior alterations to existing university building on ground floor lobby. University of Toronto - Woodsworth College. Convenience address - 119 St George St. | Inspection | |
| 2009-05-29 | Building permit09 132282 | Proposal for interior alterations to the first floor and mezzanine level of Kruger Hall (University of Toronto). | Closed | |
| 1994-08-29 | Zoning review94 025295 LTO | No description on file | Closed |
Restrictions
How much heritage, nature and site-specific rules limit changes to the house
- Heritage property: designated (Part IV)
- Zoning not in By-law 569-2013
What this part means for this house, in plain EnglishUnlock
Heritage property: designated (Part IV)
ModerateCheck before you offerWhat the record shows, what it means for you and what to doUnlock
Zoning not in By-law 569-2013
ModerateCheck before you offerWhat the record shows, what it means for you and what to doUnlock
What this means: Toronto Heritage RegisterWhat this means: Toronto zoning by address
Flood and erosion rules
How much of the lot lies in the areas TRCA regulates for flooding and erosion
- Outside the areas TRCA regulates
From TRCA's regulated areas only. Basement flooding, sewer back-up and the TRCA flood plain are not in this score yet; ask the seller and your insurer about water in the basement.
What this part means for this house, in plain EnglishUnlock
Build potential
How much more the rules allow on this lot, beyond what is on record
What this part means for this house, in plain EnglishUnlock
The lot and what the rules allow
- Zone
- —
- Height limit
- —
- Corner lot
- No
- Public lane
- None
- House footprint
- 571 m²
- Back yard
- 2.3 m
- Buildings on the lot
- 10
House and yards from the City's 3D Massing; a survey gives exact figures.
What you can build
Why, measured on this lot, and the most you could buildUnlock
Building nearby
How much neighbours are building and applying to change within 300 m
- 7 development applications open within 300 m, up to 36 storeys
- 3 suite and multiplex permits within 300 m in 10 years
- 5 minor variance decisions within 300 m, 80% approved
What this part means for this house, in plain EnglishUnlock
7 development applications open within 300 m
LowCheck if it appliesSee the next door check for this house
What the record shows, what it means for you and what to doUnlock
What this means: Committee of Adjustment
What the City allowed next door
Within 500 m, last 10 years: a guide if you plan to build or apply for something similar.
What neighbours have built and changed around you, and how the City decidedUnlock
Area safety
Police-reported crime in the neighbourhood against the Toronto median
- Lower than the Toronto median in 1 of 7 categories
- Break and enter: 4.2 times the Toronto median
- Assault: 2.7 times the Toronto median
- Theft over $5,000: 2.6 times the Toronto median
- Homicide: 2.3 times the Toronto median
- Robbery: 1.9 times the Toronto median
- Theft from vehicles: 1.9 times the Toronto median
Neighbourhood rates per 100,000 people from the Toronto Police Service, not this street.
What this part means for this house, in plain EnglishUnlock
University neighbourhood
About the area, not this house.
2021 Census, against the median Toronto neighbourhood
Getting around and schools
- St. George StationNearest station3 min walk
- Bloor St West at Bedford RdNearest TTC stop3 min walk
- St George StNearest cycling route1 min walk
- Munk School of Global Affairs at the Observatory - U of T, Bldg 89School1 min walk
- School of Continuing Studies - U of T, Bldg 103School2 min walk
- Rotman School of Management - U of T, Bldg 134School3 min walk
- Munk School of Global Affairs Graham Library - U of T, Bldg 12cSchool4 min walk
Police-reported crime, 2025, per 100,000 people
- Assaultcity median 636.31740.5
- Robberycity median 69.5133.9
- Homicidecity median 5.312.2
- Auto theftcity median 192.6182.6
- Theft over $5,000city median 46.1121.7
- Break and entercity median 172.8730.3
- Theft from vehiclescity median 188.1353
Ready emails
Copy and send as they are.
5 questions for the seller and your lawyer, written outUnlock
What we checked, and what the City's records don't cover
We checked 48 sets of City of Toronto, TRCA and Statistics Canada open data for this address, last updated Nov 27, 2026. Our records don't cover flooding history, ownership and mortgages, or the condition of the house: ask the seller and your insurer about water in the basement, your lawyer about title, and book a home inspection.
See every source and when we loaded it · Pre-offer checklist