Everything here comes from public records: City of Toronto open data, TRCA and Statistics Canada, 15 sets in all. Each item leads to the record it comes from. Our sources
This house at a glance
Each score from 0 to 10: 0 needs attention, 10 all clear. Build potential is how much more you could add.
About 1119 Dufferin St
1119 Dufferin St is on a 4.9 m by 27.9 m lot on Dufferin St in Dovercourt Village. The zoning is R. A site-specific exception, 900.2.10(740), changes some of the usual rules for this address.
The City has 8 records on this lot since 2009. That is more than at 98% of Toronto houses. In 2025, a building permit was filed: "To demolish existing 1 storey house and construction of 3 storey triplex". Status: under review. In 2024, a building permit was filed: "Alternative solution with respect to a single means of egress: 1) building will be sprinklered, though it is not required to be sprinklered. it will be…". Status: approved. In 2024, a building permit was filed: "Demolition of existing 1 storey house and construction of 3 storey triplex". Status: under review. Nothing on file is open right now.
Within 300 m, 1 development application is open. Dufferin station is a 5-minute walk, and the lot is in its Major Transit Station Area.
Summary
What the City's records show on this house
- Work or applications in progressModerateFree check
- Records mention multiplexModerateFree check
- 1 development application open within 300 mLowFree check
- 1 Committee of Adjustment file on this lotLowFree check
Left unchecked, any of these can mean unexpected costs, trouble after closing, or plans you can't carry out. Found before you offer, they give you room to negotiate. The full report explains what each one means for this house and what to do next.
15 sets of public records, already checked for you. Searching each one yourself and working out what it means for you takes time. We have done that work: what matters about this house and lot, in plain English, in a few minutes.
What to find out first
2 things to check before you offer.
What to find out before an offer, the steps to take, what each costs and how long it takesUnlock
Open City files
How much in the City's records needs answers before an offer
- Work or applications in progress
- Records mention multiplex
- No open orders or by-law investigations
What this part means for this house, in plain EnglishUnlock
Work or applications in progress
ModerateCheck before you offerSee the open permit check for this house
What the record shows, what it means for you and what to doUnlock
Records mention multiplex
ModerateCheck before you offerSee the basement apartment check for this house
What the record shows, what it means for you and what to doUnlock
1 Committee of Adjustment file on this lot
LowFor later, once you own itSee the next door check for this house
What the record shows, what it means for you and what to doUnlock
What this means: Toronto zoning by addressWhat this means: Building permits before buyingWhat this means: Committee of Adjustment
City files on this lot
8 records on file, more than at 98% of Toronto houses (median 0 records).
| Date | Record | As the City filed it | In plain words | Status |
|---|---|---|---|---|
| 2025-04-07 | Building permit25 141049 | To Demolish existing 1 storey house and construction of 3 storey triplex. | Under Review | |
| 2024-12-13 | Building permit24 250281 | No description on file | Cancelled | |
| 2024-12-13 | Building permit24 250273 | Alternative Solution with respect to a single means of egress: 1) Building will be sprinklered, though it is not required to be sprinklered. It will be sprinklered in accordance with NFPA 13R, ¿Installation of Sprinkler Systems in Low-Rise Residential Occupancies¿,2) Building will be provided with a fire alarm system,3) Monitoring the status of the sprinkler system as part of the required fire alarm system,4) Upgrading the fire-resistance rating of the exit stair separation from 45-minutes to 1 hour,5) Upgrading the fire-protection rating of the suite doors into the exit stair from 20 minutes to 1 hour,6) Suite doors will be upgraded to provide a 45-minute fire protection rating, instead of the permitted 20-minute fire protection rating. The doors will also be gasketed/weather-stripped to mitigate risk of smoke spreading beyond suite of fire origin. NFPA 80 does not require fire rated doors to be weather-stripped and allows for large undercuts at the bottom of doors and thus the suite doors will be enhanced. | Approved | |
| 2024-12-13 | Building permit24 250091 | Demolition of existing 1 storey house and construction of 3 storey triplex. | Cancelled | |
| 2024-12-13 | Building permit24 250062 | Demolition of existing 1 storey house and construction of 3 storey triplex. | Under Review | |
| 2024-05-01 | Minor varianceA0219/24TEY | To construct a new three-storey detached dwelling (triplex) with rear decks on the ground, second, and third levels, a front third storey rooftop terrace above the front cantilevered second storey portion of the dwelling, and a front landing with stairs. | Approved | |
| 2023-02-23 | Zoning review23 116798 ZAP | No description on file | Closed | |
| 2009-10-05 | Zoning review09 176053 ZAL | No description on file | Cancelled |
Restrictions
How much heritage, nature and site-specific rules limit changes to the house
- Exception 900.2.10(740) does not apply to this address
- No heritage listing or designation
What this part means for this house, in plain EnglishUnlock
Exception 900.2.10(740) does not apply to this address
Nothing to doNothing to do: this does not apply to the house.
Flood and erosion rules
How much of the lot lies in the areas TRCA regulates for flooding and erosion
- Outside the areas TRCA regulates
From TRCA's regulated areas only. Basement flooding, sewer back-up and the TRCA flood plain are not in this score yet; ask the seller and your insurer about water in the basement.
What this part means for this house, in plain EnglishUnlock
Build potential
How much more the rules allow on this lot, beyond what is on record
- On record: multiplex
- No public lane, so no laneway suite
What this part means for this house, in plain EnglishUnlock
The lot and what the rules allow
- Zone
- R (d0.6) (x740)
- Height limit
- 13 m
- Corner lot
- No
- Public lane
- None
- New house permit
- 2024
House and yards from the City's 3D Massing; a survey gives exact figures.
What you can build
Why, measured on this lot, and the most you could buildUnlock
Building nearby
How much neighbours are building and applying to change within 300 m
- 1 development application open within 300 m
- In the Dufferin station area
- 43 suite and multiplex permits within 300 m in 10 years
What this part means for this house, in plain EnglishUnlock
1 development application open within 300 m
LowCheck if it appliesSee the next door check for this house
What the record shows, what it means for you and what to doUnlock
What the City allowed next door
Within 500 m, last 10 years: a guide if you plan to build or apply for something similar.
What neighbours have built and changed around you, and how the City decidedUnlock
Area safety
Police-reported crime in the neighbourhood against the Toronto median
- Lower than the Toronto median in 4 of 6 categories
- Assault: 1.5 times the Toronto median
Neighbourhood rates per 100,000 people from the Toronto Police Service, not this street.
What this part means for this house, in plain EnglishUnlock
Dovercourt Village neighbourhood
About the area, not this house.
2021 Census, against the median Toronto neighbourhood
Getting around and schools
- Dufferin StationNearest station5 min walk
- Dufferin St at Shanly StNearest TTC stop1 min walk
- Bartlett AveNearest cycling route3 min walk
- St Anthony Catholic Elementary SchoolSchool2 min walk
- Pauline Jr Public SchoolSchool4 min walk
- St Sebastian Catholic Elementary SchoolSchool5 min walk
- Dovercourt Jr Public SchoolSchool6 min walk
Police-reported crime, 2025, per 100,000 people
- Assaultcity median 636.3974.9
- Robberycity median 69.568.6
- Auto theftcity median 192.6129.5
- Theft over $5,000city median 46.122.9
- Break and entercity median 172.8236.1
- Theft from vehiclescity median 188.1144.7
Ready emails
Copy and send as they are.
4 questions for the seller and your lawyer, written outUnlock
What we checked, and what the City's records don't cover
We checked 48 sets of City of Toronto, TRCA and Statistics Canada open data for this address, last updated Nov 27, 2026. Our records don't cover flooding history, ownership and mortgages, or the condition of the house: ask the seller and your insurer about water in the basement, your lawyer about title, and book a home inspection.
See every source and when we loaded it · Pre-offer checklist