Everything here comes from public records: City of Toronto open data, TRCA and Statistics Canada, 15 sets in all. Each item leads to the record it comes from. Our sources
This house at a glance
Each score from 0 to 10: 0 needs attention, 10 all clear. Build potential is how much more you could add.
About 11 Wellesley St W
11 Wellesley St W is on a 39.2 m by 74.9 m lot on Wellesley St W in Bay-Cloverhill. This lot is not covered by Toronto's city-wide zoning by-law 569-2013, so a by-law of the former city or borough most likely still applies. Toronto Building can confirm which one. The City lists the property on its Heritage Register. Listing does not stop changes inside, but the City must get 60 days' notice before any demolition.
The City has 32 records on this lot since 1988. That is more than at 99% of Toronto houses. In 2022, a building permit was filed: "Proposed interior alterations for new tenant fitout for "chapayom thai tea"". Status: closed. In 2022, a building permit was filed: "Proposal for interior alterations for a tenant fit-up to an existing office unit 325 located on the 3rd floor level for tenant - 'rosalind'". Status: closed. In 2022, a building permit was filed: "Proposal for interior alterations for vr gaming recreation use". Status: closed. An open permit means the City has not closed the file. Ask the seller whether the work was finished and passed its final inspection.
Within 300 m, 13 development applications are open (the tallest up to 75 storeys). Within 300 m, the Committee of Adjustment decided 31 minor variance applications in the last 10 years and approved 100%. Wellesley station is a 3-minute walk.
Summary
What the City's records show on this house
- Building permit open since 2018ModerateFree check
- Zoning not in By-law 569-2013Moderate
- Heritage property: listedModerate
- 1 short-term rental registrations hereModerate
- 5 by-law investigations closed in the last two yearsLow
- 13 development applications open within 300 mLowFree check
- 7 City trees in front of this lotLowFree check
- 1 Committee of Adjustment file on this lotLowFree check
Left unchecked, any of these can mean unexpected costs, trouble after closing, or plans you can't carry out. Found before you offer, they give you room to negotiate. The full report explains what each one means for this house and what to do next.
15 sets of public records, already checked for you. Searching each one yourself and working out what it means for you takes time. We have done that work: what matters about this house and lot, in plain English, in a few minutes.
What to find out first
3 things to check before you offer.
What to find out before an offer, the steps to take, what each costs and how long it takesUnlock
Open City files
How much in the City's records needs answers before an offer
- Building permit open since 2018
- 5 by-law investigations closed in the last two years
- 1 short-term rental registrations here
What this part means for this house, in plain EnglishUnlock
Building permit open since 2018
ModerateCheck before you offerSee the open permit check for this house
What the record shows, what it means for you and what to doUnlock
1 short-term rental registrations here
ModerateCheck if it appliesWhat the record shows, what it means for you and what to doUnlock
5 by-law investigations closed in the last two years
LowCheck if it appliesWhat the record shows, what it means for you and what to doUnlock
1 Committee of Adjustment file on this lot
LowFor later, once you own itSee the next door check for this house
What the record shows, what it means for you and what to doUnlock
What this means: Building permits before buyingWhat this means: Committee of Adjustment
City files on this lot
32 records on file, more than at 99% of Toronto houses (median 0 records).
| Date | Record | As the City filed it | In plain words | Status |
|---|---|---|---|---|
| 2026-01-09 | By-law investigation26 102617 ZON 00 IR | Zoning | Closed | |
| 2025-09-22 | By-law investigation25 228774 PRS 00 IR | Property Standards | Closed | |
| 2025-04-02 | By-law investigation25 138709 ZON 00 IR | Zoning | Closed | |
| 2025-04-02 | By-law investigation25 138708 ZON 00 IR | Zoning | Closed | |
| 2025-03-28 | By-law investigation25 136297 ZON 00 IR | Zoning | Closed | |
| 2022-10-14 | Building permit22 190756 | Proposed interior alterations for new tenant fitout for "Chapayom Thai Tea" | Closed | |
| 2022-04-05 | Building permit22 126572 | Proposal for interior alterations for a tenant fit-up to an existing office unit 325 located on the 3rd floor level for tenant - 'Rosalind'. | Closed | |
| 2022-02-01 | Building permit21 226137 | Proposal for interior alterations for VR gaming recreation use | Closed | |
| 2021-07-26 | Zoning review21 189825 ZZC | No description on file | Closed | |
| 2021-05-20 | Building permit20 235007 | rev 1: HVAC - Proposal for interior alterations to suites 207-233 | Closed | |
| 2020-09-21 | Building permit20 191896 | Proposed interior alterations to an existing office space on the second floor. *Unit 222* | Closed | |
| 2020-08-25 | Building permit20 171784 | Proposal for interior alterations to Unit 214 on the 2nd floor - commercial (office) tenant fit-up. | Closed | |
| 2020-06-08 | Building permit14 255836 | Rev 01: Revision to plumbing as per bubbled drawingsPlumbing - Proposal to construct a new 60 storey mixed use building containing 739 dwelling units, 5,650 square metres of non-residential uses including retail uses at grade and office uses in the second and third floors. There are 134 commercial parking spaces and 471 residential parking spaces proposed below grade and 774 bicycle parking spaces. The proposal also includes an expanded park space from Wellesley Street to Breadalbane Street. The site is subject to site specific by-laws 1063-2014 and 1064-2014. See also 14 227846 STE. | Closed | |
| 2019-08-01 | Development application19 199468 STE 13 CD | Draft Plan of Condominium for 66 non-residential units within a recently constructed mixed use building . A total of 620 parking spaces are provided below grade: 486 residential parking space and 134 commercial parking spaces. | Closed | |
| 2019-07-19 | Development application19 191837 STE 13 CD | Draft Plan of Condominium for a recently constructed mixed use building (740 residential units). A total of 620 parking spaces are provided below grade: 486 residential parking space and 134 commercial parking spaces. | Closed | |
| 2019-03-18 | Building permit19 123244 | Proposal to install 4 maglocks on the ground floor of an existing mixed use building. | Closed | |
| 2018-09-11 | Building permit18 223414 | Alternative Solution for timed egress analysis for travel distances exceeding 45 m on Levels P1 to P4 of 11 Wellesley Street parking garage levels. OBC Solutions referenced as OBC Sentence 3.4.2.5.(1). | Approved | |
| 2018-01-24 | Building permit18 108886 | Sprinklers in connection to 14 255836 BLD. | Inspection | |
| 2017-11-03 | Building permit17 257758 | Proposal for an alternative solution related to the pool and deck | Approved | |
| 2016-07-27 | Building permit16 197621 | Proposal for an alternative solution related to the voice communication system with voice intelligibility in accordance with 2015 National Building Code of Canada | Approved | |
| 2015-05-11 | Building permit15 143154 | Proposal to demolish 1 storey sales centre. See 14 255836 BLD for new building. | Closed | |
| 2014-10-14 | Zoning review14 237383 PSP | No description on file | Closed | |
| 2014-09-25 | Development application14 227846 STE 27 SA | Site Plan application for a 60 storey (194.1 metre including mechanical penthouse) mixed use building containing 740 dwelling units, 5,650 square metres of non-residential uses including retail uses at grade and office uses in the second and third floors. There are 134 commercial parking spaces and 486 residential parking spaces proposed below grade and 771 bicycle parking spaces. The proposal also includes an expanded park space from Wellesley Street to Breadalbane Street. The site is subject to site specific by-laws 1063-2014 and 1064-2014. | Closed | |
| 2014-05-02 | Building permit14 131742 | HVAC - Proposal to construct a new sales office on the existing property. NOTE there is no plumbing as the building will be using protable toilets. | Cancelled | |
| 2013-04-23 | Zoning review13 155221 PRZ | No description on file | Closed | |
| 2013-03-21 | Development application13 138607 STE 27 OZ | Original rezoning application submitted for a mixed-use development consisting of two residential towers at 45 and 54 storeys in height with a 9-10 storey podium. The development proposes a total gross floor area of 90,700 square metres and will feature 1,304 dwelling units above a 1 storey of street-related retail space. The original proposal frames a public park on the south side of the block. The second submission proposed one 54-storey tower (181 metres) located at the north east corner of the site with 681 units, retail at grade and office in floor 2 and 3. Access to below grade parking and loading is proposed from St. Luke Lane. A public parking facility is also proposed below grade. The proposal also includes an expanded park space from Wellesley Street to Breadalbane Street. Resubmission April 2, 2014 adding in the parcel of land on the east side of St Luke Lane, reducing the area of the, increasing the area of the park, the tower height proposed is 60 storyes (194 metres including mechanical penthouse), revising the gross floor area, increasing the number of units to 742. The area of the proposed park has been increased to 5,382 sq.m. | Closed | |
| 2007-09-19 | Zoning review07 263084 PSP | No description on file | Closed | |
| 2005-08-10 | Consent (lot split)B0087/05TEY | The Committee of Adjustment has been requested to approve conveyances and transfers of easements to rectify certain omissions, mistakes and to recover certain parts that are no longer required. The subejct lands are located in the southeast quadrant of Bay Street and Wellesley Street West and are shown on draft R-Plan as PARTS 7, 8, 10, 12, 13, 14, 19, 20 and 27, on registered Plan 66R-20199 as PARTS 2, 5, 8 and 9 and on registered plan Plan 66R-19399 as PARTS 5, 7, 8, 18, 19, 25, 26, 33 34, 35, 53 and 65. The parties involved in the conveyances and transfers are: East of Bay (2003) Development Corporation, Toronto Standard condominium Plan No. 1424 Ontario Realty Corporation | Approved | |
| 1998-05-04 | Zoning review98 026088 LTO | No description on file | Closed | |
| 1996-02-01 | Zoning review96 024524 LTO | No description on file | Closed | |
| 1992-11-23 | Zoning review92 026229 LTO | No description on file | Closed | |
| 1988-03-02 | Zoning review88 030182 LTO | No description on file | Closed |
Restrictions
How much heritage, nature and site-specific rules limit changes to the house
- Zoning not in By-law 569-2013
- Heritage property: listed
What this part means for this house, in plain EnglishUnlock
Zoning not in By-law 569-2013
ModerateCheck before you offerWhat the record shows, what it means for you and what to doUnlock
Heritage property: listed
ModerateCheck before you offerWhat the record shows, what it means for you and what to doUnlock
7 City trees in front of this lot
LowFor later, once you own itSee the tree permit check for this house
What the record shows, what it means for you and what to doUnlock
What this means: Toronto Heritage RegisterWhat this means: Toronto zoning by address
Flood and erosion rules
How much of the lot lies in the areas TRCA regulates for flooding and erosion
- Outside the areas TRCA regulates
From TRCA's regulated areas only. Basement flooding, sewer back-up and the TRCA flood plain are not in this score yet; ask the seller and your insurer about water in the basement.
What this part means for this house, in plain EnglishUnlock
Build potential
How much more the rules allow on this lot, beyond what is on record
What this part means for this house, in plain EnglishUnlock
The lot and what the rules allow
- Zone
- —
- Height limit
- —
- Corner lot
- No
- Public lane
- None
- House footprint
- 360 m²
- Back yard
- 0.5 m
- Buildings on the lot
- 14
House and yards from the City's 3D Massing; a survey gives exact figures.
What you can build
Why, measured on this lot, and the most you could buildUnlock
Building nearby
How much neighbours are building and applying to change within 300 m
- 13 development applications open within 300 m, up to 75 storeys
- 31 minor variance decisions within 300 m, 100% approved
What this part means for this house, in plain EnglishUnlock
13 development applications open within 300 m
LowCheck if it appliesSee the next door check for this house
What the record shows, what it means for you and what to doUnlock
What the City allowed next door
Within 500 m, last 10 years: a guide if you plan to build or apply for something similar.
What neighbours have built and changed around you, and how the City decidedUnlock
Area safety
Police-reported crime in the neighbourhood against the Toronto median
- Lower than the Toronto median in 3 of 6 categories
- Theft over $5,000: 1.9 times the Toronto median
- Break and enter: 1.7 times the Toronto median
Neighbourhood rates per 100,000 people from the Toronto Police Service, not this street.
What this part means for this house, in plain EnglishUnlock
Bay-Cloverhill neighbourhood
About the area, not this house.
2021 Census, against the median Toronto neighbourhood
Getting around and schools
- Wellesley StationNearest station3 min walk
- Wellesley St West at Yonge StNearest TTC stop1 min walk
- Wellesley St WNearest cycling route1 min walk
- The YMCA Academy Secondary SchoolSchool2 min walk
- St Joseph's College SchoolSchool4 min walk
- Toronto School of Theology - U of T, Bldg 434School7 min walk
- The Abelard Centre for EducationSchool8 min walk
Police-reported crime, 2025, per 100,000 people
- Assaultcity median 636.3601.9
- Robberycity median 69.574.7
- Auto theftcity median 192.616.6
- Theft over $5,000city median 46.187.2
- Break and entercity median 172.8286.4
- Theft from vehiclescity median 188.1145.3
Ready emails
Copy and send as they are.
3 questions for the seller and your lawyer, written outUnlock
What we checked, and what the City's records don't cover
We checked 48 sets of City of Toronto, TRCA and Statistics Canada open data for this address, last updated Nov 28, 2026. Our records don't cover flooding history, ownership and mortgages, or the condition of the house: ask the seller and your insurer about water in the basement, your lawyer about title, and book a home inspection.
See every source and when we loaded it · Pre-offer checklist