HousePrecheckCheck an address

1030 Pape AveBroadview North, Toronto · City records before you offer

Commercial residential · CR 2.5 (c2.5; r1.0) SS2 (x1163)6.1 × 32.9 m201 m²on Pape Avecorner, also on Cosburn Ave

1 thing to check before you offer, including work or applications in progress
N10 m
6.1 m frontage32.9 m deep

Everything here comes from public records: City of Toronto open data, TRCA and Statistics Canada, 15 sets in all. Each item leads to the record it comes from. Our sources

This house at a glance

Each score from 0 to 10: 0 needs attention, 10 all clear. Build potential is how much more you could add.

About 1030 Pape Ave

1030 Pape Ave is on a 6.1 m by 32.9 m lot on Pape Ave in Broadview North. The zoning is CR. A site-specific exception, 900.11.10(1163), changes some of the usual rules for this address. The lot also fronts Cosburn Ave.

The City has 11 records on this lot since 2006. That is more than at 99% of Toronto houses. In 2026, a building permit was filed: "To install a backflow prevention device at pape avenue and gamble avenue for temporary water services". Status: permit issued. In 2026, a building permit was filed: "To install a backflow prevention device at pape avenue and gowan avenue for temporary water services". Status: permit issued. In 2026, a building permit was filed: "Proposal for alternative solution approach to building code compliance is proposed relative to the 2024 ontario building code for the egress requirements in…". Status: deficiency notice issued. 3 open permits mean the City has not closed the files. Ask the seller whether the work was finished and passed its final inspection.

Within 300 m, 1 development application is open. The nearest TTC stop is Cosburn Ave at Pape Ave, a 1-minute walk.

Summary

What the City's records show on this house

  • Work or applications in progressModerateFree check
  • Site-specific exception 900.11.10(1163)Moderate
  • 1 development application open within 300 mLowFree check
  • 1 Committee of Adjustment file on this lotLowFree check

Left unchecked, any of these can mean unexpected costs, trouble after closing, or plans you can't carry out. Found before you offer, they give you room to negotiate. The full report explains what each one means for this house and what to do next.

Unlock the full report

15 sets of public records, already checked for you. Searching each one yourself and working out what it means for you takes time. We have done that work: what matters about this house and lot, in plain English, in a few minutes.

What to find out first

1 thing to check before you offer.

What to find out before an offer, the steps to take, what each costs and how long it takesUnlock

A few questions

Open City files

How much in the City's records needs answers before an offer

  • Work or applications in progress
  • No open orders or by-law investigations
  • No permits left open for years

What this part means for this house, in plain EnglishUnlock

  1. Work or applications in progress

    ModerateCheck before you offer

    What the record shows, what it means for you and what to doUnlock

  2. 1 Committee of Adjustment file on this lot

    LowFor later, once you own it

    What the record shows, what it means for you and what to doUnlock

City files on this lot

11 records on file, more than at 99% of Toronto houses (median 0 records).

DateRecordAs the City filed itIn plain wordsStatus
2026-09-10Building permit
26 212483
To install a backflow prevention device at Pape Avenue and Gamble Avenue for temporary water services.Permit Issued
2026-09-10Building permit
26 209658
To install a backflow prevention device at Pape Avenue and Gowan Avenue for temporary water services.Permit Issued
2026-07-30Building permit
26 211537
Proposal for alternative solution approach to building code compliance is proposed relative to the 2024 Ontario Building Code for the egress requirements in the rapid transit stationDeficiency Notice Issued
2025-07-25Building permit
25 199735
Construct new station for Ontario Line - Cosburn StationUnder Review
2024-11-14Zoning review
24 229459 PSP
No description on fileClosed
2024-10-22Development application
24 229459 STE 14 SA
Site Plan Approval for the Cosburn Station as part of the Ontario Line SubwayUnder Review
2020-07-28Building permit
19 137064
Rev 01 - relocate residential stairs and entry to flanking street, retail and residential layout changes with roof access stairs, structural changes throughout due to layout changesProposal for multiple projects to an existing 2 storey multi use building. Scope of work includes a 3rd floor addition, a 3 storey rear addition, and interior alterations. See also 15 104035 ZZC, 15 117018 MV and Final and Binding A0161/15TEY.Closed
2015-06-15Building permit
15 167187
This application is for underpinning 44 lm of foundation wall under the existing building with minor repairs to the walls (No finishing work to the basement).Closed
2015-04-15Minor variance
A0161/15TEY
To alter the existing two-storey mixed-use building containing one dwelling unit by constructing a complete third floor addition, and a rear three-storey addition in order to add a second ground floor retail, and 5 additional residential dwelling units on the second and third floors.Approved
2015-01-14Zoning review
15 104035 ZZC
No description on fileClosed
2006-05-15Zoning review
06 135425 LTO
No description on fileClosed
Clear

Restrictions

How much heritage, nature and site-specific rules limit changes to the house

  • Site-specific exception 900.11.10(1163)
  • No heritage listing or designation

What this part means for this house, in plain EnglishUnlock

  1. Site-specific exception 900.11.10(1163)

    ModerateCheck if it applies

    What the record shows, what it means for you and what to doUnlock

If you want to change or build

What the site-specific rules mean for an addition, a garage or a rebuild.

Site-specific exception 900.11.10(1163)

What the exception changes for this address, rule by ruleUnlock

Not on this lot

Flood and erosion rules

How much of the lot lies in the areas TRCA regulates for flooding and erosion

  • Outside the areas TRCA regulates

From TRCA's regulated areas only. Basement flooding, sewer back-up and the TRCA flood plain are not in this score yet; ask the seller and your insurer about water in the basement.

What this part means for this house, in plain EnglishUnlock

Little left to add

Build potential

How much more the rules allow on this lot, beyond what is on record

What this part means for this house, in plain EnglishUnlock

The lot and what the rules allow

N10 m
6.1 m frontage32.9 m deepon Pape Ave
Zone
CR 2.5 (c2.5; r1.0) SS2 (x1163)
Height limit
10.5 m
Corner lot
Yes, also on Cosburn Ave
Public lane
None
House footprint
103 m²
Back yard
14.2 m
Buildings on the lot
1

House and yards from the City's 3D Massing; a survey gives exact figures.

What you can build

    Why, measured on this lot, and the most you could buildUnlock

    Some

    Building nearby

    How much neighbours are building and applying to change within 300 m

    • 1 development application open within 300 m
    • In the Cosburn station area
    • 13 suite and multiplex permits within 300 m in 10 years

    What this part means for this house, in plain EnglishUnlock

    1. 1 development application open within 300 m

      LowCheck if it applies

      What the record shows, what it means for you and what to doUnlock

    What the City allowed next door

    Within 500 m, last 10 years: a guide if you plan to build or apply for something similar.

    What neighbours have built and changed around you, and how the City decidedUnlock

    Crime well below median

    Area safety

    Police-reported crime in the neighbourhood against the Toronto median

    • Lower than the Toronto median in 5 of 6 categories

    Neighbourhood rates per 100,000 people from the Toronto Police Service, not this street.

    What this part means for this house, in plain EnglishUnlock

    Broadview North neighbourhood

    About the area, not this house.

    2021 Census, against the median Toronto neighbourhood

    Median household income (2020)$68,500median $84,500
    Households that own their home31%median 54%
    Population (2021)10,955median 16,813
    Homes built in 1960 or before39%median 29%
    Homes needing major repairs8%median 7%

    Getting around and schools

    • Pape StationNearest station18 min walk
    • Cosburn Ave at Pape AveNearest TTC stop1 min walk
    • Cosburn AveNearest cycling route1 min walk
    • William Burgess Elementary SchoolSchool5 min walk
    • Chester Elementary SchoolSchool5 min walk
    • Westwood Mdl SchoolSchool6 min walk
    • Centennial College School - Carlaw CampusSchool9 min walk

    Police-reported crime, 2025, per 100,000 people

    • Assaultcity median 636.3583.2
    • Robberycity median 69.58.1
    • Auto theftcity median 192.6194.4
    • Theft over $5,000city median 46.124.3
    • Break and entercity median 172.897.2
    • Theft from vehiclescity median 188.1105.3

    More about Broadview North

    Ready emails

    Copy and send as they are.

    2 questions for the seller and your lawyer, written outUnlock

    What we checked, and what the City's records don't cover

    We checked 48 sets of City of Toronto, TRCA and Statistics Canada open data for this address, last updated Nov 28, 2026. Our records don't cover flooding history, ownership and mortgages, or the condition of the house: ask the seller and your insurer about water in the basement, your lawyer about title, and book a home inspection.

    See every source and when we loaded it · Pre-offer checklist

    Something here not right?

    Screening tool based on City of Toronto and TRCA open data. Not a zoning review or legal opinion. Site-specific exceptions, amendments not yet in the open data, minor variances and other by-laws can change the answer. Confirm with a Preliminary Project Review or Zoning Certificate from Toronto Building before buying or designing.

    Scores calibrated on Toronto house lots on 2026-10-19; prices and sources checked on 2026-10-06. Contains information licensed under the Open Government Licence – Toronto. TRCA regulation limits © Toronto and Region Conservation Authority.

    Full pre-offer report · 1030 Pape Ave

    1 thing to check at 1030 Pape Ave before you offer

    • Work or applications in progressModerate
    • Site-specific exception 900.11.10(1163)Moderate
    • 1 development application open within 300 mLow
    • 1 Committee of Adjustment file on this lotLow

    The report explains what each one can cost you on this house and what to ask the seller or the City before you offer.

    $29 CAD one time · opens right away

    See a sample report

    Full refund within 30 days if the report left out or misstated a City record on the lot. Refund policy

    Also in the report

    • A PDF to forward to your agent and lawyer
    • What you can build on this lot, measured on it
    • Every line linked to the City record it comes from
    • 15 sets of public records, already searched and read for you
    • A clear list of the 3 steps to take before you offer, so nothing slips
    • What each of the 4 findings can cost you or stop you doing, in plain English
    • A two-minute summary of this house, and what to find out first before you offer
    • What the City allowed your neighbours, a guide if you plan to build or apply for something similar
    • We watch this address for 90 days. If anything changes in the City's records, we email you the same day
    • A short summary of each part: City files, restrictions, flood and erosion, build potential, building nearby, area safety

    By paying you agree to the terms of use and the refund policy. Payment by Stripe. The report opens right after payment, and we email you a link to it; your account is made from the email you pay with. A screening of public records, not a legal opinion or a home inspection.

    Flag an error

    What is not right?

    The problem

    The records come from the City's open data; we check each flag against them. Your email is used only to answer this.