Everything here comes from public records: City of Toronto open data, TRCA and Statistics Canada, 15 sets in all. Each item leads to the record it comes from. Our sources
This house at a glance
Each score from 0 to 10: 0 needs attention, 10 all clear. Build potential is how much more you could add.
About 101 Fordwich Cres
101 Fordwich Cres is on a 15.2 m by 36.5 m lot on Fordwich Cres in Rexdale-Kipling. The zoning is RD.
The City has 5 records on this lot since 2025. That is more than at 93% of Toronto houses. In 2026, a building permit was filed: "Revision #1 - to the interior layoutproposed new garden suite". Status: application acceptable. In 2026, a building permit was filed: "Alternative solution application for obc 7.1.2.4.(2). the proposed plumbing design includes sanitary drainage and domestic cold water piping crossing the…". Status: approved. In 2026, a Committee of Adjustment application was filed: "To construct a new apartment building that will contain a total of 6 units". Status: deferred. Nothing on file is open right now.
No development applications are open within 300 m. Within 300 m, the Committee of Adjustment decided 7 minor variance applications in the last 10 years and approved 100%. The nearest TTC stop is Hinton Rd at Harefield Dr, a 2-minute walk.
Summary
What the City's records show on this house
- Work or applications in progressModerateFree check
- Records mention garden suite, multiplexModerateFree check
- 2 City trees in front of this lotLowFree check
Left unchecked, any of these can mean unexpected costs, trouble after closing, or plans you can't carry out. Found before you offer, they give you room to negotiate. The full report explains what each one means for this house and what to do next.
15 sets of public records, already checked for you. Searching each one yourself and working out what it means for you takes time. We have done that work: what matters about this house and lot, in plain English, in a few minutes.
What to find out first
2 things to check before you offer.
What to find out before an offer, the steps to take, what each costs and how long it takesUnlock
Open City files
How much in the City's records needs answers before an offer
- Work or applications in progress
- Records mention garden suite, multiplex
- No open orders or by-law investigations
What this part means for this house, in plain EnglishUnlock
Work or applications in progress
ModerateCheck before you offerSee the open permit check for this house
What the record shows, what it means for you and what to doUnlock
Records mention garden suite, multiplex
ModerateCheck before you offerSee the basement apartment check for this house
What the record shows, what it means for you and what to doUnlock
What this means: Toronto zoning by addressWhat this means: Building permits before buying
City files on this lot
5 records on file, more than at 93% of Toronto houses (median 0 records).
| Date | Record | As the City filed it | In plain words | Status |
|---|---|---|---|---|
| 2026-11-23 | Building permit26 179922 | Revision #1 - to the interior layoutProposed new garden suite | Application Acceptable | |
| 2026-07-23 | Building permit26 207223 | Alternative Solution Application for OBC 7.1.2.4.(2). The proposed plumbing design includes sanitary drainage and domestic cold water piping crossing the demising wall between adjacent dwelling units. Strict compliance with OBC Division B, Sentence 7.1.2.4.(2) is not practical due to the layout of the building and the location of the plumbing fixtures. This Alternative Solution proposes the following compensatory measures:Additional sanitary cleanouts on both sides of the demising wall;Enclosing the domestic cold water piping between adjacent units within a fire-rated enclosure from the water meter room to the demising wall; Providing flood leak detectors at the basement floor drains;All measures are shown on the revised plumbing drawings prepared by YMSD Consulting, issued in response to City comments | Approved | |
| 2026-07-15 | Minor varianceA0222/26EYK | To construct a new apartment building that will contain a total of 6 units. | Deferred | |
| 2026-06-02 | Building permit24 237784 | REV : Proposed revision to convert from fourplex to an apartment building.Proposal to demolish existing house and construct new three storey fourplex. | Under Review | |
| 2025-06-23 | Building permit24 237809 | Proposal to demolish existing one storey single family dwelling | Closed |
Restrictions
How much heritage, nature and site-specific rules limit changes to the house
- No heritage listing or designation
- No site-specific zoning exception
What this part means for this house, in plain EnglishUnlock
2 City trees in front of this lot
LowFor later, once you own itSee the tree permit check for this house
What the record shows, what it means for you and what to doUnlock
Flood and erosion rules
How much of the lot lies in the areas TRCA regulates for flooding and erosion
- Outside the areas TRCA regulates
From TRCA's regulated areas only. Basement flooding, sewer back-up and the TRCA flood plain are not in this score yet; ask the seller and your insurer about water in the basement.
What this part means for this house, in plain EnglishUnlock
Build potential
How much more the rules allow on this lot, beyond what is on record
- On record: multiplex, garden suite
- No public lane, so no laneway suite
What this part means for this house, in plain EnglishUnlock
The lot and what the rules allow
- Zone
- RD (f13.5; a510; d0.45)
- Height limit
- 9.5 m
- Lot coverage limit
- 33%
- Corner lot
- No
- Public lane
- None
- New house permit
- 2026
House and yards from the City's 3D Massing; a survey gives exact figures.
What you can build
Why, measured on this lot, and the most you could buildUnlock
Building nearby
How much neighbours are building and applying to change within 300 m
- 0 development applications within 300 m in 10 years, none open
- 2 suite and multiplex permits within 300 m in 10 years
- 7 minor variance decisions within 300 m, 100% approved
What this part means for this house, in plain EnglishUnlock
What the City allowed next door
Within 500 m, last 10 years: a guide if you plan to build or apply for something similar.
What neighbours have built and changed around you, and how the City decidedUnlock
Area safety
Police-reported crime in the neighbourhood against the Toronto median
- Lower than the Toronto median in 2 of 7 categories
- Robbery: 1.8 times the Toronto median
- Auto theft: 1.7 times the Toronto median
Neighbourhood rates per 100,000 people from the Toronto Police Service, not this street.
What this part means for this house, in plain EnglishUnlock
Rexdale-Kipling neighbourhood
About the area, not this house.
2021 Census, against the median Toronto neighbourhood
Getting around and schools
- Martin Grove StationNearest station36 min walk
- Hinton Rd at Harefield DrNearest TTC stop2 min walk
- Elmhurst DrNearest cycling route4 min walk
- St Benedict Catholic Elementary SchoolSchool7 min walk
- Rivercrest Jr SchoolSchool8 min walk
- Thistletown Collegiate InstituteSchool9 min walk
- Monsignor Percy Johnson Catholic Secondary SchoolSchool10 min walk
Police-reported crime, 2025, per 100,000 people
- Assaultcity median 636.3718.7
- Robberycity median 69.5125.8
- Shootingscity median 10.59
- Auto theftcity median 192.6332.4
- Theft over $5,000city median 46.162.9
- Break and entercity median 172.8170.7
- Theft from vehiclescity median 188.1188.7
Ready emails
Copy and send as they are.
4 questions for the seller and your lawyer, written outUnlock
What we checked, and what the City's records don't cover
We checked 48 sets of City of Toronto, TRCA and Statistics Canada open data for this address, last updated Nov 27, 2026. Our records don't cover flooding history, ownership and mortgages, or the condition of the house: ask the seller and your insurer about water in the basement, your lawyer about title, and book a home inspection.
See every source and when we loaded it · Pre-offer checklist