HousePrecheckCheck an address

1001 Sheppard Ave EBayview Village, Toronto · City records before you offer

66.1 × 100.6 m6,530 m²on Ethennonnhawahstihnen' Lanecorner, also on Sheppard Ave E

3 things to check before you offer, including 3 building permits open, the oldest since 2018
N50 m
66.1 m frontage100.6 m deep

Everything here comes from public records: City of Toronto open data, TRCA and Statistics Canada, 15 sets in all. Each item leads to the record it comes from. Our sources

This house at a glance

Each score from 0 to 10: 0 needs attention, 10 all clear. Build potential is how much more you could add.

About 1001 Sheppard Ave E

1001 Sheppard Ave E is on a 66.1 m by 100.6 m lot on Ethennonnhawahstihnen' Lane in Bayview Village. This lot is not covered by Toronto's city-wide zoning by-law 569-2013, so a by-law of the former city or borough most likely still applies. Toronto Building can confirm which one. The lot also fronts Sheppard Ave E.

The City has 89 records on this lot since 2001. That is more than at 99% of Toronto houses. In 2026, a building permit was filed: "Proposed 9 maglocks in podium area". Status: permit issued. In 2025, a development application was filed: "Draft plan of standard condominium application for 19-storey and 31-storey buildings with a total of 990 residential units, 1080 parking spaces. this is known…". Status: draft plan approved. In 2024, a building permit was filed: "Part permit - construct a 19 storey tower with 168 residential units - tower c - block 15". Status: closed. 4 open permits mean the City has not closed the files. Ask the seller whether the work was finished and passed its final inspection.

Within 300 m, 6 development applications are open (the tallest up to 46 storeys). Within 300 m, the Committee of Adjustment decided 7 minor variance applications in the last 10 years and approved 100%. Bessarion station is a 2-minute walk.

Summary

What the City's records show on this house

  • 3 building permits open, the oldest since 2018ModerateFree check
  • Work or applications in progressModerateFree check
  • Zoning not in By-law 569-2013Moderate
  • 6 development applications open within 300 mLowFree check
  • 9 Committee of Adjustment files on this lotLowFree check

Left unchecked, any of these can mean unexpected costs, trouble after closing, or plans you can't carry out. Found before you offer, they give you room to negotiate. The full report explains what each one means for this house and what to do next.

Unlock the full report

15 sets of public records, already checked for you. Searching each one yourself and working out what it means for you takes time. We have done that work: what matters about this house and lot, in plain English, in a few minutes.

What to find out first

3 things to check before you offer.

What to find out before an offer, the steps to take, what each costs and how long it takesUnlock

Check carefully

Open City files

How much in the City's records needs answers before an offer

  • 3 building permits open, the oldest since 2018
  • Work or applications in progress
  • No open orders or by-law investigations

What this part means for this house, in plain EnglishUnlock

  1. 3 building permits open, the oldest since 2018

    ModerateCheck before you offer

    What the record shows, what it means for you and what to doUnlock

  2. Work or applications in progress

    ModerateCheck before you offer

    What the record shows, what it means for you and what to doUnlock

  3. 9 Committee of Adjustment files on this lot

    LowFor later, once you own it

    What the record shows, what it means for you and what to doUnlock

City files on this lot

89 records on file, more than at 99% of Toronto houses (median 0 records).

DateRecordAs the City filed itIn plain wordsStatus
2026-07-30Building permit
26 211141
Proposed 9 maglocks in podium areaPermit Issued
2026-04-29Building permit
20 226941
Revision 01: Clarification on egress stairs C-A and C-B. Clarification on high voltage room changed to storage room on the upper ground floor. Ceiling assembly revised to identify rooms not requiring acoustical batt insulation. Addition of remote annunciator panel in building B residential lobby.Construct a 27 storey tower with 257 residential units - Tower A - Block 15Cancelled
2025-05-29Development application
25 167441 NNY 17 CD
Draft Plan of Standard Condominium application for 19-storey and 31-storey buildings with a total of 990 residential units, 1080 parking spaces. This is known as Concord Park Place. Associated site plan control application 19 155827 NNY 17 SA.Draft Plan Approved
2024-12-17Building permit
20 227375
Part Permit - Construct a 19 storey tower with 168 residential units - Tower C - Block 15Closed
2024-06-13Building permit
24 112389
Rev 01: addition of 1 maglock on 2nd floor of Block 11 - 25-27 Mcmahon DriveStand Alone and Miscellaneous Work application for Electromagnetic LocksClosed
2024-04-25Zoning review
24 129384 PSP
No description on fileClosed
2024-04-25Zoning review
24 129405 POZ
No description on fileClosed
2024-03-25Development application
24 129384 NNY 17 SA
Official Plan Amendment and Zoning By-law Amendment applications to permit a 44- and 39-storey mixed use development at 1001 Sheppard Avenue East. The development proposes to incorporate an elementary school for the Toronto Catholic District School (TCDSB) into the first 2-storeys of the base building (Block 9) and a new school yard (Block 18). The proposed development would consist of 929 residential dwelling units and have a gross floor area of approximately 65,448.84 square metres, including 4,927.8 square metres for the TCDSB school, and retail space at street-level.Under Review
2024-03-25Development application
24 129405 NNY 17 OZ
Official Plan Amendment and Zoning By-law Amendment applications to permit a 44- and 39-storey mixed use development at 1001 Sheppard Avenue East. The development proposes to incorporate an elementary school for the Toronto Catholic District School (TCDSB) into the first 2-storeys of the base building (Block 9) and a new school yard (Block 18). The proposed development would consist of 867 residential dwelling units and have a gross floor area of approximately 60,809.5 square metres, including 4,618 square metres dedicated to the TCDSB school. A total of 480 square metres of retail space is proposed at street-level.Council Approved
2023-10-05Zoning review
22 124107 POZ
No description on fileClosed
2023-05-25Building permit
23 150722
The purpose of this alternative solution is to address the OBC requirement to install combination smoke and fire dampers at the duct openings that are part of the air-handling system that provides make-up air for the residential public corridors as required by Sentence 3.2.6.2.(5.1). On an alternative solution basis, it is proposed to install fire dampers only at the above noted duct openings.Approved
2023-05-25Building permit
23 150718
The purpose of this alternative solution is to address the OBC requirement to install combination smoke and fire dampers at the duct openings that are part of the air-handling system that provides make-up air for the residential public corridors as required by Sentence 3.2.6.2.(5.1). On an alternative solution basis, it is proposed to install fire dampers only at the above noted duct openings.Approved
2023-05-25Building permit
23 150708
The purpose of this alternative solution is to address the OBC requirement to install combination smoke and fire dampers at the duct openings that are part of the air-handling system that provides make-up air for the residential public corridors as required by Sentence 3.2.6.2.(5.1). On an alternative solution basis, it is proposed to install fire dampers only at the above noted duct openings.Approved
2022-11-21Building permit
20 227069
Conditional Permit - Part Permit - LEAD - Construct a 31 storey tower with 565 residential units, a 6 level podium with mixed retail on the ground floor and a 5 storey underground parking garage - Tower B - Block 15Closed
2022-05-26Building permit
18 228869
HVAC - Construct a new 29 storey condonminium and 4 storey townshousesClosed
2022-03-17Development application
22 124107 NNY 17 OZ
The application proposes two residential towers at 46 storeys (west) and 49 storeys (east) with a 6-storey podium. The application proposes a residential gross floor area of 79,572.7 square metres, including 1,184 residential units. A total of 2,148.5 square metres of non-residential gross floor area is proposed. The project proposes a total of 605 vehicle parking spaces including 122 visitor parking spaces. The parking rate would provide 96 retail spaces and 1 car-share. The project proposes 947 bicycle parking spaces, including 823 long term and 108 short term spaces.Under Review
2022-02-08Zoning review
19 155827 PSP
No description on fileClosed
2022-01-12Building permit
22 103228
Proposed an alternative solution for protecting standpipe reisers with duct wrap.Please see attched summary of proposal application form.Approved
2021-10-03Development application
21 220950 NNY 17 CD
Draft Plan of Standard Condominium application for 18-storey and 29-storey buildings with a total of 466 residential units, 474 residential parking spaces and 66 visitor parking spaces. This is known as Block 11 of Concord Park Place. Associated site plan control application 18 263017 NNY 24 SA.Closed
2021-06-03Development application
21 164881 NNY 17 CD
Draft Plan of Standard Condominium application for 41-storey and 38-storey buildings with a total of 692 residential units, 634 residential parking spaces and 96 visitor parking spaces. This is known as Block 12 of Concord Park Place. Associated planning applications include OPA and rezoning application 10 22703 NNY 23 OZ; plan of subdivision application 10 246801 NNY 24 SB and minor variance application A0634/17NY.Closed
2021-03-11Minor variance
A0670/20NY
A mixed use building with three towers (19, 31 and 27 storeys) and a total gross floor area of 82,241.56 sq.m. 990 dwelling units, 754 bicycle parking spaces, 1,079 parking spaces and 3 loading space are proposed.Approved
2021-03-05Building permit
18 229039
DRN - Part Permit - LEAD PERMIT Construct a new 19 storey condominium with 160 units and 4 storey townhouses with 15 units, attached 2 storey podium and a 5 storey underground parking garageClosed
2021-01-06Building permit
21 101378
The purpose of this alternative solution is to address the OBC requirement to install fire hose cabinets within floor areas that are located not more than 5 m from every required exit serving the project.On an alternative solution basis, it is proposed to omit the installation of hose cabinets within floor areas. Rather, 65 mm hose connections will be installed within the exit stair shafts as required for this project in accordance with the 2015 National Building Code of Canada (NBC) Sentence 3.2.5.10.(1) and NFPA 14-2013 "Installation of Standpipe and Hose Systems". Additionally, 65 mm hose connections will be installed where required throughout the floor area to provide the required 30 m hose coverage to the floor areas of the Project as described in the proposal.Approved
2021-01-06Building permit
21 101371
The purpose of this alternative solution is to address the OBC requirement to install fire hose cabinets within floor areas that are located not more than 5 m from every required exit serving the project.On an alternative solution basis, it is proposed to omit the installation of hose cabinets within floor areas. Rather, 65 mm hose connections will be installed within the exit stair shafts as required for this project in accordance with the 2015 National Building Code of Canada (NBC) Sentence 3.2.5.10.(1) and NFPA 14-2013 "Installation of Standpipe and Hose Systems". Additionally, 65 mm hose connections will be installed where required throughout the floor area to provide the required 30 m hose coverage to the floor areas of the Project as described in the proposal.Approved
2021-01-05Building permit
21 101081
The purpose of this alternative solution is to address the OBC requirement to install fire hose cabinets within floor areas that are located not more than 5 m from every required exit serving the project.On an alternative solution basis, it is proposed to omit the installation of hose cabinets within floor areas. Rather, 65 mm hose connections will be installed within the exit stair shafts as required for this project in accordance with the 2015 National Building Code of Canada (NBC) Sentence 3.2.5.10.(1) and NFPA 14-2013 "Installation of Standpipe and Hose Systems". Additionally, 65 mm hose connections will be installed where required throughout the floor area to provide the required 30 m hose coverage to the floor areas of the Project as described in the proposal.Approved
2020-06-18Zoning review
18 263017 PSP
No description on fileClosed
2020-04-17Building permit
19 167603
Stand Alone Shoring and Excavation Permit for Soil Remediation - Block 15Closed
2019-12-31Zoning review
19 265056 PSP
No description on fileClosed
2019-12-27Development application
19 265056 NNY 17 SA
The application proposes two residential buildings at 28 storeys (west) and 36 storeys (east) with a 6-storey podium. The application proposes a residential gross floor area of 53,800 square metres, including 800 residential units. A total of 2,450 square metres of non-residential gross floor area is proposed. The project proposes a total of 453 vehicle parking spaces including 84 visitor parking spaces. The parking rate would provide 83 retail spaces on Block 7, 21 retail spaces off-site on Block 9, 264 residential on Block 7, 84 on Block 7, and 1 car-share on Block 7. The project proposes 610 bicycle parking spaces, including 480 long term and 120 short term spaces.Under Review
2019-12-02Building permit
17 228465
Part Permit - Underground parking garage for the development of two towers (33 adn 36 stories) and two blocks of stacked townhouses(4 stories) and a shared podiumClosed
2019-10-29Building permit
17 228864
HVAC - Construct a 33 storey apartment with 312 units, (with a shared underground parking garage 17-228465), shared podium and a canopy for the outdoor amenity spaceClosed
2019-10-29Building permit
17 228861
HVAC - Construct a 36 storey apartment with 342 units, (with a shared underground garage 17-228465) and (shared podium - review with the West Tower) and a canopy for the outdoor amenity spaceClosed
2019-10-09Building permit
19 234135
The purpose of this alternative solution is to address the requirements of Article 3.2.6.3 to prevent the passage of contaminated air from one building into another during a fire. -Proposed measure for link between BLK 12 and Blk. 11 in parking level.Approved
2019-10-09Building permit
19 234124
The purpose of this alternative solution is to address the OBC requirement to install fire hose cabinets within floor areas that are located not more than 5m from every required exit serving this Project.Approved
2019-09-16Building permit
19 222024
AS-PIPING AND VICTAULIC STAINLESS STEEL FITTINGSPlumbing - Underground parking garage for the development of two towers (33 adn 36 stories) and two blocks of stacked townhouses(4 stories) and a shared podiumApproved
2019-08-06Zoning review
19 201358 ZPR
No description on fileClosed
2019-05-17Development application
19 155827 NNY 17 SA
Proposal for three towers (19, 27 and 31-storeys) atop a 6-storey podium with a total of 990 residential units, 80,247 square-metres of residential gross floor area, and 1,995 square-metres of non-residential gross floor area.Closed
2019-02-07Minor variance
A0832/18NY
To legalize and maintain the existing undersized underground parking spaces.Approved
2018-12-28Zoning review
18 272522 ZPR
No description on fileClosed
2018-11-30Development application
18 263017 NNY 24 SA
Two residential towers, 18 and 29 storeys with five levels of underground parking, 30 townhouses (3 storey and stacked townhouse form) which are all part of one building having access either from an internal corridor or direct access at grade. A two storey podium on the north side will connect the two towers and townhouse units and the amenity area on the south side.Closed
2018-11-22Building permit
18 171432
Stand alone shoring and excavation for the remediation of the soil for Block 11Permit Issued
2018-10-24Building permit
18 244921
Proposal to erect a certified tent (15m x 25m - Cert # 14 251055). Oct 23-30/2018.Closed
2018-08-22Building permit
18 211349
Providing temporary site servicing connection to block 10. which will serve temporary site servicing for future bessarion community center required as per subdivison agreement. to parking lotPermit Issued
2018-06-05Building permit
18 172249
Alternative solution for underground N connection between 2 residential condosApproved
2018-05-01Zoning review
15 192524 PSP
No description on fileClosed
2018-04-27Zoning review
17 214190 PSP
No description on fileClosed
2018-03-20Building permit
17 217167
1 storey building for park forestry and recreation department (Woodsy Park Pavilion Building) to store equipments, washroom and public winter lounge.Closed
2018-01-10Building permit
17 239130
Shoring and excavation for the remediation of the soil Block 12Inspection
2017-12-28Building permit
17 279757
Stairs and standpipes Blk 12 A-JApproved
2017-10-13Building permit
17 240320
Install one 30'x60' pipe frame certified tent (14-251051) From Sept 29/17 to Oct 2/17Anchored with steel stakes and concrete blocksClosed
2017-09-14Minor variance
A0634/17NY
To construct two towers of 33 and 36 storeys linked by a podium containing lobby and amenity space together with townhouse units, total 692 dwelling units and 674 parking spaces.Approved
2017-08-10Development application
17 214190 NNY 24 SA
Site Plan application for Block 12 of Concord Park Place. The proposal is for two residential towers of 33 and 36 storeys connected by a three / four storey podium containing 38 townhouse units. A total of 692 residential units are proposed.Closed
2017-07-31Zoning review
17 208626 ZPR
No description on fileCancelled
2017-04-27Building permit
17 150614
Alternative Solution in connection to active Building Permit 13 256229 BLD East Tower for standpipe and hose system.Cancelled
2015-07-17Development application
15 192524 NNY 24 SA
Site Plan application for a 4-storey, 12,343 square metre community centre including a 52-space child care facility, aquatic centre and a recreation centre with 196 parking spaces in 3 levels of underground parking.Closed
2014-08-21Zoning review
14 209634 PCD
No description on fileClosed
2013-06-27Development application
13 195840 NNY 24 SA
To permit the construction of 712 residential dwelling units contained with in one 35-storey tower, one 36-storey tower and 16 townhouses with associated 4-level underground parking. NOAC issued on August 11, 2014.Closed
2011-12-29Building permit
11 331558
To design a standpipe system in a manner that the standpipe risers provided with hose connections will be located in exit stair enclosures. No fire hose cabinets will be provided in the floor areas or the exit stairs.Approved
2011-10-05Minor variance
A299/11NY
This is an application to permit the construction of a a thirty-three storey (including two storeys of mechanical penthouse) mixed use (residential and commercial) building on the above noted site (Parts 3 and 17 on the draft reference plan and Block 18 (formerly Block 14) on the draft plan of subdivision). The lands are presently vacant.Refused
2011-08-10Consent (lot split)
B013/11NY
This is an application for the division of the lands into three parts for conveyance purposes to create a new building lot, for lot additions to the lands to the east, for the granting of easements/rights-of-way and the consents to mortgage.Approved
2011-07-08Development application
11 234661 NNY 24 SA
West of Provost, Block 17 (formerly BL 4). The application is for a 23-storey mixed use building plus two storeys of mechanical penthouses. The mixed use building will contain retail at grade (800 m2) with a total of 428 residential units. The total gross floor area is 21,162 m² and a total of 458 parking spaces will be provided in 4-levels of underground parking. Notice of Approval Conditions and plans approved by the OMB at a hearing held on Feb 11, 2013.Closed
2011-02-10Building permit
10 298258
To erect and display two illuminated wall signs on the north-facing wall of the building (a sales office/presentation centre) and one double-sided illuminated ground sign near the Sheppard Ave E. frontage of the property. ** Concord - Park Place **Closed
2010-10-28Zoning review
10 286819 ZPR
No description on fileClosed
2010-08-25Development application
10 246801 NNY 24 SB
Application to revise the draft approved plan of subdivision for the lands west of Provost Drive. Approved by the OMB on March 8, 2013. Subdivision approval granted November 27, 2014.Closed
2010-07-23Development application
10 227038 NNY 24 OZ
Re-designate park and mixed use blocks and amend the existing zoning by-law performance standards, including height and density. Also seeking revisions to draft plan of subdivision. Applicant appealed in November 2011. Settlement endorsed by City Council Nov 26, 27 & 28, 2012. Approved by the OMB by Order dated March 8, 2013.Closed
2010-06-18Zoning review
10 200400 ZPR
No description on fileClosed
2010-05-21Zoning review
10 180304 ZPR
No description on fileClosed
2010-03-03Zoning review
10 125828 ZAL
No description on fileClosed
2010-01-28Zoning review
10 110953 ZAL
No description on fileCancelled
2010-01-28Development application
10 110948 NNY 24 SA
West of Provost, Block 18 (formerly Blk 14). The proposal is for a 33-storey residential building with a total gross floor area of 35,099m2 with retail and townhouse units at grade. Total residential units including the townhouses is 428 units. There will be a total parking supply of 463 in the underground parking accessed from a newly created road, McMahon Drive.Closed
2009-12-08Building permit
09 173647
One storey office/sales pavilion with basement - Concord Park Presentation CentreClosed - Dormant
2009-05-04Development application
09 133474 NNY 24 OZ
This is a preliminary conceptual application for information and comment as appropriate. It has been combined with Official Plan and Zoning application 10 227038 NNY 24 OZ.Closed
2009-02-04Consent (lot split)
B0090/08NY
This is an application for the divisions of the subject lands into three parts for conveyance purposes for creation of a new lot and a lot addition.Approved
2009-01-21Minor variance
A0726/08NY
This is an applicaiton to permit the construction of a temporary sales presentation centre on Block 5 of the above noted site for the proposed future mixed use community.Approved
2008-12-03Zoning review
08 226719 ZPR
No description on fileClosed
2008-07-02Minor variance
A0454/08NY
This is an applicaiton to permit the construction of a temporary sales presentaition centre on the above noted site for the proposed future mixed use community.Approved
2008-05-23Building permit
08 157322
Plumbing - New temporary sales centreCancelled
2008-05-09Building permit
08 157346
HVAC for temporary sales centre.Cancelled
2008-04-16Development application
08 147886 NNY 24 SA
Proposed 1 storey temporary sales centre (Total GFA 785m2). Revised application submitted December 2/08 which relocates sales centre on the lot. CClosed
2007-05-18Building permit
07 152465
Canadian Tire warehouseClosed
2005-04-14Zoning review
05 123188 ZPR
No description on fileClosed
2005-02-22Building permit
04 203075
make interior alterations. Tenant: TD Canada TrustClosed
2004-06-11Building permit
04 134301
To demolish exising Canadian Tire.Closed
2003-07-10Building permit
02 150101
HVAC - FOUNDATION PERMIT FOR NEW RETAIL STORE. SUPERSTRUCTURE PERMIT NO. 02 150109 - Partial Permit - FoundationClosed
2003-04-03Consent (lot split)
B008/03NY
This is an application under Section 50, 53 and 54 of the Planning Act for the consent of the Committee of Adjustment to the division of a parcel of residential lands into two parts for the purpose of a lot addition.Approved
2002-08-08Building permit
02 157661
DEMOLITION OF PIT STOP BUILDING.Closed
2002-04-18Zoning review
02 127837 ZPU
No description on fileClosed
2002-02-21Zoning review
02 112501 PSP
No description on fileClosed
2001-09-10Building permit
01 175447
INSTALL ONE CERTIFIED TENTCancelled
Minor

Restrictions

How much heritage, nature and site-specific rules limit changes to the house

  • Zoning not in By-law 569-2013
  • No heritage listing or designation

What this part means for this house, in plain EnglishUnlock

  1. Zoning not in By-law 569-2013

    ModerateCheck before you offer

    What the record shows, what it means for you and what to doUnlock

Not on this lot

Flood and erosion rules

How much of the lot lies in the areas TRCA regulates for flooding and erosion

  • Outside the areas TRCA regulates

From TRCA's regulated areas only. Basement flooding, sewer back-up and the TRCA flood plain are not in this score yet; ask the seller and your insurer about water in the basement.

What this part means for this house, in plain EnglishUnlock

Little left to add

Build potential

How much more the rules allow on this lot, beyond what is on record

What this part means for this house, in plain EnglishUnlock

The lot and what the rules allow

N50 m
66.1 m frontage100.6 m deepon Ethennonnhawahstihnen' Lane
Zone
—
Height limit
—
Corner lot
Yes, also on Sheppard Ave E
Public lane
None
House footprint
473 m²
Back yard
29.3 m
Buildings on the lot
1

House and yards from the City's 3D Massing; a survey gives exact figures.

What you can build

    Why, measured on this lot, and the most you could buildUnlock

    Active

    Building nearby

    How much neighbours are building and applying to change within 300 m

    • 6 development applications open within 300 m, up to 46 storeys
    • 7 minor variance decisions within 300 m, 100% approved

    What this part means for this house, in plain EnglishUnlock

    1. 6 development applications open within 300 m

      LowCheck if it applies

      What the record shows, what it means for you and what to doUnlock

    What the City allowed next door

    Within 500 m, last 10 years: a guide if you plan to build or apply for something similar.

    What neighbours have built and changed around you, and how the City decidedUnlock

    Crime below median

    Area safety

    Police-reported crime in the neighbourhood against the Toronto median

    • Lower than the Toronto median in 4 of 6 categories

    Neighbourhood rates per 100,000 people from the Toronto Police Service, not this street.

    What this part means for this house, in plain EnglishUnlock

    Bayview Village neighbourhood

    About the area, not this house.

    2021 Census, against the median Toronto neighbourhood

    Median household income (2020)$83,000median $84,500
    Households that own their home60%median 54%
    Population (2021)22,330median 16,813
    Homes built in 1960 or before10%median 29%
    Homes needing major repairs6%median 7%

    Getting around and schools

    • Bessarion StationNearest station2 min walk
    • Sheppard Ave East at Blue Ridge RdNearest TTC stop1 min walk
    • Esther Shiner BlvdNearest cycling route6 min walk
    • North York LincSchool5 min walk
    • Elkhorn Public SchoolSchool8 min walk
    • Bay School of CanadaSchool9 min walk
    • St George AcademySchool12 min walk

    Police-reported crime, 2025, per 100,000 people

    • Assaultcity median 636.3439.5
    • Robberycity median 69.556.6
    • Auto theftcity median 192.6139.8
    • Theft over $5,000city median 46.149.9
    • Break and entercity median 172.8176.4
    • Theft from vehiclescity median 188.1169.8

    More about Bayview Village

    Ready emails

    Copy and send as they are.

    4 questions for the seller and your lawyer, written outUnlock

    What we checked, and what the City's records don't cover

    We checked 48 sets of City of Toronto, TRCA and Statistics Canada open data for this address, last updated Nov 27, 2026. Our records don't cover flooding history, ownership and mortgages, or the condition of the house: ask the seller and your insurer about water in the basement, your lawyer about title, and book a home inspection.

    See every source and when we loaded it · Pre-offer checklist

    Something here not right?

    Screening tool based on City of Toronto and TRCA open data. Not a zoning review or legal opinion. Site-specific exceptions, amendments not yet in the open data, minor variances and other by-laws can change the answer. Confirm with a Preliminary Project Review or Zoning Certificate from Toronto Building before buying or designing.

    Scores calibrated on Toronto house lots on 2026-10-19; prices and sources checked on 2026-10-06. Contains information licensed under the Open Government Licence – Toronto. TRCA regulation limits © Toronto and Region Conservation Authority.

    Full pre-offer report · 1001 Sheppard Ave E

    3 things to check at 1001 Sheppard Ave E before you offer

    • 3 building permits open, the oldest since 2018Moderate
    • Work or applications in progressModerate
    • Zoning not in By-law 569-2013Moderate
    • 6 development applications open within 300 mLow
    • and 1 more

    The report explains what each one can cost you on this house and what to ask the seller or the City before you offer.

    $29 CAD one time · opens right away

    See a sample report

    Full refund within 30 days if the report left out or misstated a City record on the lot. Refund policy

    Also in the report

    • A PDF to forward to your agent and lawyer
    • What you can build on this lot, measured on it
    • Every line linked to the City record it comes from
    • 15 sets of public records, already searched and read for you
    • A clear list of the 7 steps to take before you offer, so nothing slips
    • What each of the 5 findings can cost you or stop you doing, in plain English
    • A two-minute summary of this house, and what to find out first before you offer
    • What the City allowed your neighbours, a guide if you plan to build or apply for something similar
    • We watch this address for 90 days. If anything changes in the City's records, we email you the same day
    • A short summary of each part: City files, restrictions, flood and erosion, build potential, building nearby, area safety

    By paying you agree to the terms of use and the refund policy. Payment by Stripe. The report opens right after payment, and we email you a link to it; your account is made from the email you pay with. A screening of public records, not a legal opinion or a home inspection.

    Flag an error

    What is not right?

    The problem

    The records come from the City's open data; we check each flag against them. Your email is used only to answer this.