HousePrecheckCheck an address

10 King St EDowntown Yonge East, Toronto · City records before you offer

Commercial residential · CR 12.0 (c8.0; r11.7) SS1 (x2327)15.4 × 34.0 m506 m²on King St E

1 thing to check before you offer, including building permit open since 2023
N20 m
15.4 m frontage34.0 m deep

Everything here comes from public records: City of Toronto open data, TRCA and Statistics Canada, 15 sets in all. Each item leads to the record it comes from. Our sources

This house at a glance

Each score from 0 to 10: 0 needs attention, 10 all clear. Build potential is how much more you could add.

About 10 King St E

10 King St E is on a 15.4 m by 34 m lot on King St E in Downtown Yonge East. The zoning is CR. A site-specific exception, 900.11.10(2327), changes some of the usual rules for this address.

The City has 40 records on this lot since 2001. That is more than at 99% of Toronto houses. In 2023, a building permit was filed: "Minor interior alteration to existing office space". Status: permit issued. In 2023, a building permit was filed: "To erect and display one illuminated wall sign, displaying static copy, at the first storey on the south elevation, with a face measuring 2.44m vertically by…". Status: closed. In 2022, a building permit was filed: "Rev #1-revise layoutproposal for interior alterations including demolition of an office & construction of millwork & corridor demising partition on the 14th…". Status: closed. An open permit means the City has not closed the file. Ask the seller whether the work was finished and passed its final inspection.

Within 300 m, 13 development applications are open (the tallest up to 80 storeys). Within 300 m, the Committee of Adjustment decided 10 minor variance applications in the last 10 years and approved 100%. King station is a 2-minute walk, and the lot is in its Major Transit Station Area.

Summary

What the City's records show on this house

  • Building permit open since 2023ModerateFree check
  • Site-specific exception 900.11.10(2327)Moderate
  • 13 development applications open within 300 mLowFree check
  • Priority retail street: King Street EastLow
  • Downtown Plan Secondary PlanLow

Left unchecked, any of these can mean unexpected costs, trouble after closing, or plans you can't carry out. Found before you offer, they give you room to negotiate. The full report explains what each one means for this house and what to do next.

Unlock the full report

15 sets of public records, already checked for you. Searching each one yourself and working out what it means for you takes time. We have done that work: what matters about this house and lot, in plain English, in a few minutes.

What to find out first

1 thing to check before you offer.

What to find out before an offer, the steps to take, what each costs and how long it takesUnlock

Check

Open City files

How much in the City's records needs answers before an offer

  • Building permit open since 2023
  • No open orders or by-law investigations
  • No work or applications in progress

What this part means for this house, in plain EnglishUnlock

  1. Building permit open since 2023

    ModerateCheck before you offer

    What the record shows, what it means for you and what to doUnlock

City files on this lot

40 records on file, more than at 99% of Toronto houses (median 0 records).

DateRecordAs the City filed itIn plain wordsStatus
2024-06-14Zoning review
24 164729 LTO
No description on fileClosed
2023-08-02Building permit
23 182212
Minor interior alteration to existing office space.Permit Issued
2023-02-25Building permit
23 112055
To erect and display one illuminated wall sign, displaying static copy, at the first storey on the south elevation, with a face measuring 2.44m vertically by 1.52m horizontally at the height of 3.55m.**Various Tenants**Closed
2022-12-09Building permit
22 131496
REV #1-REVISE LAYOUTProposal for interior alterations including demolition of an office & construction of millwork & corridor demising partition on the 14th floor level to create a new Suite 1401.Closed
2022-10-20Building permit
22 212978
Proposed interior alterations to existing office in unit 300Closed
2022-08-26Building permit
22 101087
Revision 01 - interior layout changeProposal for interior alteration.Closed
2022-06-09Building permit
22 155197
Interior alterations to offices in Unit 400 - Bentall GreenoakClosed
2022-06-02Building permit
22 149116
To erect and display 2 first party wall signs and 2 first party projecting signs, all illuminated, displaying static copy located at first storey.Dimensions:Wall Sign 1 & 2: 0.69m L x 2.68m w x 0.08m D at a height of 3.60m. (Sign 1 on south elevation and sign 2 on east elevation.)Projecting Sign 3 & 4: 0.61m L x 0.51m W x 0.18m D at a height of 3.21m. (Sign 3 on south elevation and sign 4 on east elevation.)**Circle K**Closed
2022-03-14Building permit
22 107161
Interior alterations to Circle K convenience storeClosed
2022-01-26Building permit
22 101140
Proposal for interior alteration.Cancelled
2021-10-07Building permit
21 156511
Proposal for interior alterations for existing office building unit 501Closed
2021-02-10Building permit
21 102344
Interior alterations to Group D officeClosed
2020-11-10Building permit
20 208098
Proposal for interior alterations on the 12th floor of an existing office building.Closed
2019-01-08Building permit
18 268743
INTERIOR ALTERATION OF EXISTING OFFICE SUITE 200 - EXCELLON RESOURCESClosed
2018-10-30Building permit
18 234523
Proposal for interior alterations to the entire 6th floor of existing office buildingClosed
2018-09-19Building permit
18 218171
Proposal for podium deck rehabilitation in existing multiple unit building.Closed
2018-06-20Building permit
18 171105
Proposal to construct interior alterations to existing office space - 11th Floor.Closed
2016-12-02Building permit
16 247262
Proposal to install a hot water tank and undercounter dishwasher in an existing ground floor restaurant, Unit 101, B Good Restaurant. See related permit 15 227574 BLD.Closed
2016-12-02Building permit
16 247258
Proposal to install an additional hvac system (ductless split system) in an existing ground floor restaurant, Unit 101, B Good Restaurant. See related permit 15 227574 BLD.Closed
2016-06-03Zoning review
16 167364 ZPR
No description on fileClosed
2016-03-22Building permit
16 123142
In conjunction with a restaurant on the premises, proposal to erect and display one illuminated wall sign containing static copy on the south elevation (facing King Street East). The proposed wall sign is 0.61 metres vertically by 4.724 metres horizontally at a height of 4.01 metres above grade. **B.GOOD REAL. FOOD. FAST**Closed
2015-11-05Building permit
15 245012
Proposed interior alterations on the 9th floor of existing office building.Closed
2015-10-22Building permit
15 227574
Proposal for interior alterations to unit 100 for a new restaurant (B.Good Restaurant) in the existing multiple use building. - Number of seats - 36Closed
2015-07-22Building permit
15 178644
Proposal to install 1 electro-magnetic lock - 7th floor, south elevator lobby.Closed
2015-06-04Building permit
15 165271
Proposal for interior alterations to the 7th floor office - unit 700. Tenant is "Cambridge Forums"Closed
2014-04-10Building permit
14 137451
Proposal to construct interior alterations including plumbing and hvac to suite 502 in the existing office.Closed
2014-04-08Building permit
14 136842
Construct interior alterations to existing office space within unit 1250Closed
2014-04-01Building permit
14 135034
Proposal for interior alterations to construct a new kitchenette in suite 401 of the existing office.Closed
2014-01-10Building permit
13 280716
Proposal for interior alterations to office space on the 15th floor of existing office building.Closed
2013-05-01Building permit
13 155358
Proposed interior alterations to existing office space on the 5th floor - Dundee Realty Management Corp.Closed
2012-08-14Building permit
12 227006
Proposed interior alterations to office space on the third floor (Unit 300)Closed
2010-09-22Building permit
10 256777
permit for one backflow device in basement of existing office building.Closed
2009-06-11Zoning review
09 148476 LTO
No description on fileClosed
2008-11-03Building permit
08 209757
Proposal for interior alterations to fit-out new tenant on 2nd floor of existing office building (432m2). Single-tenanted floor. New tenant: Satyam Computer Services Ltd.Closed
2008-07-15Building permit
08 177698
Proposal for interior alterations to third floor (60m2), for existing tenant in existing office space. Multi-tenanted.Closed
2008-06-16Building permit
08 169407
Proposal to install 1 mag lock on ground fl.Closed
2005-03-03Building permit
05 112676
Interior alterations to offices on 10th floorClosed
2003-04-17Building permit
03 124903
install 6 maglocks (2 each on 5,10,12) in office buildingClosed
2002-12-11Building permit
02 195455
Rear porch enclosure (addition) to SFD.Cancelled
2001-03-06Zoning review
01 012346 LTO
No description on fileClosed
Minor

Restrictions

How much heritage, nature and site-specific rules limit changes to the house

  • Site-specific exception 900.11.10(2327)
  • Priority retail street: King Street East
  • No heritage listing or designation

What this part means for this house, in plain EnglishUnlock

  1. Site-specific exception 900.11.10(2327)

    ModerateCheck if it applies

    What the record shows, what it means for you and what to doUnlock

  2. Priority retail street: King Street East

    LowFor later, once you own it

    What the record shows, what it means for you and what to doUnlock

  3. Downtown Plan Secondary Plan

    LowFor later, once you own it

    What the record shows, what it means for you and what to doUnlock

If you want to change or build

What the site-specific rules mean for an addition, a garage or a rebuild.

Site-specific exception 900.11.10(2327)

What the exception changes for this address, rule by ruleUnlock

Not on this lot

Flood and erosion rules

How much of the lot lies in the areas TRCA regulates for flooding and erosion

  • Outside the areas TRCA regulates

From TRCA's regulated areas only. Basement flooding, sewer back-up and the TRCA flood plain are not in this score yet; ask the seller and your insurer about water in the basement.

What this part means for this house, in plain EnglishUnlock

Little left to add

Build potential

How much more the rules allow on this lot, beyond what is on record

What this part means for this house, in plain EnglishUnlock

The lot and what the rules allow

N20 m
15.4 m frontage34.0 m deepon King St E
Zone
CR 12.0 (c8.0; r11.7) SS1 (x2327)
Height limit
76 m
Corner lot
No
Public lane
None
House footprint
412 m²
Back yard
2 m
Buildings on the lot
1

House and yards from the City's 3D Massing; a survey gives exact figures.

What you can build

    Why, measured on this lot, and the most you could buildUnlock

    Busy

    Building nearby

    How much neighbours are building and applying to change within 300 m

    • 13 development applications open within 300 m, up to 80 storeys
    • In the Queen station area
    • 10 minor variance decisions within 300 m, 100% approved

    What this part means for this house, in plain EnglishUnlock

    1. 13 development applications open within 300 m

      LowCheck if it applies

      What the record shows, what it means for you and what to doUnlock

    What the City allowed next door

    Within 500 m, last 10 years: a guide if you plan to build or apply for something similar.

    What neighbours have built and changed around you, and how the City decidedUnlock

    Crime well above median

    Area safety

    Police-reported crime in the neighbourhood against the Toronto median

    • Lower than the Toronto median in 1 of 7 categories
    • Assault: 3.7 times the Toronto median
    • Theft over $5,000: 2.2 times the Toronto median
    • Theft from vehicles: 2.1 times the Toronto median
    • Robbery: 2.1 times the Toronto median
    • Break and enter: 1.6 times the Toronto median

    Neighbourhood rates per 100,000 people from the Toronto Police Service, not this street.

    What this part means for this house, in plain EnglishUnlock

    Downtown Yonge East neighbourhood

    About the area, not this house.

    2021 Census, against the median Toronto neighbourhood

    Median household income (2020)$69,500median $84,500
    Households that own their home36%median 54%
    Population (2021)17,700median 16,813
    Homes built in 1960 or before7%median 29%
    Homes needing major repairs4%median 7%

    Getting around and schools

    • King StationNearest station2 min walk
    • King St West at Yonge St East Side - King StationNearest TTC stop1 min walk
    • Adelaide St ENearest cycling route2 min walk
    • Keystone International SchoolsSchool3 min walk
    • Victoria Street LincSchool3 min walk
    • St Michael's Choir School - Gymnasium BldgSchool10 min walk
    • Downtown Alternative SchoolSchool10 min walk

    Police-reported crime, 2025, per 100,000 people

    • Assaultcity median 636.32360.8
    • Robberycity median 69.5143.3
    • Shootingscity median 10.511.9
    • Auto theftcity median 192.675.6
    • Theft over $5,000city median 46.199.5
    • Break and entercity median 172.8274.7
    • Theft from vehiclescity median 188.1390.1

    More about Downtown Yonge East

    Ready emails

    Copy and send as they are.

    2 questions for the seller and your lawyer, written outUnlock

    What we checked, and what the City's records don't cover

    We checked 48 sets of City of Toronto, TRCA and Statistics Canada open data for this address, last updated Nov 27, 2026. Our records don't cover flooding history, ownership and mortgages, or the condition of the house: ask the seller and your insurer about water in the basement, your lawyer about title, and book a home inspection.

    See every source and when we loaded it · Pre-offer checklist

    Something here not right?

    Screening tool based on City of Toronto and TRCA open data. Not a zoning review or legal opinion. Site-specific exceptions, amendments not yet in the open data, minor variances and other by-laws can change the answer. Confirm with a Preliminary Project Review or Zoning Certificate from Toronto Building before buying or designing.

    Scores calibrated on Toronto house lots on 2026-10-19; prices and sources checked on 2026-10-06. Contains information licensed under the Open Government Licence – Toronto. TRCA regulation limits © Toronto and Region Conservation Authority.

    Full pre-offer report · 10 King St E

    1 thing to check at 10 King St E before you offer

    • Building permit open since 2023Moderate
    • Site-specific exception 900.11.10(2327)Moderate
    • 13 development applications open within 300 mLow
    • Priority retail street: King Street EastLow
    • and 1 more

    The report explains what each one can cost you on this house and what to ask the seller or the City before you offer.

    $29 CAD one time · opens right away

    See a sample report

    Full refund within 30 days if the report left out or misstated a City record on the lot. Refund policy

    Also in the report

    • A PDF to forward to your agent and lawyer
    • What you can build on this lot, measured on it
    • Every line linked to the City record it comes from
    • 15 sets of public records, already searched and read for you
    • A clear list of the 6 steps to take before you offer, so nothing slips
    • What each of the 5 findings can cost you or stop you doing, in plain English
    • A two-minute summary of this house, and what to find out first before you offer
    • What the City allowed your neighbours, a guide if you plan to build or apply for something similar
    • We watch this address for 90 days. If anything changes in the City's records, we email you the same day
    • A short summary of each part: City files, restrictions, flood and erosion, build potential, building nearby, area safety

    By paying you agree to the terms of use and the refund policy. Payment by Stripe. The report opens right after payment, and we email you a link to it; your account is made from the email you pay with. A screening of public records, not a legal opinion or a home inspection.

    Flag an error

    What is not right?

    The problem

    The records come from the City's open data; we check each flag against them. Your email is used only to answer this.