HousePrecheckCheck an address

1 Overland DrBanbury-Don Mills, Toronto · City records before you offer

Residential multiple · RM (f21.0; a835; d1.0) (x37)64.0 × 67.7 m4,328 m²on The Donway Wcorner, also on Overland Dr

1 thing to check before you offer, including 3 building permits open, the oldest since 2013
N50 m
64.0 m frontage67.7 m deep

Everything here comes from public records: City of Toronto open data, TRCA and Statistics Canada, 15 sets in all. Each item leads to the record it comes from. Our sources

This house at a glance

Each score from 0 to 10: 0 needs attention, 10 all clear. Build potential is how much more you could add.

About 1 Overland Dr

1 Overland Dr is on a 64 m by 67.7 m lot on The Donway W in Banbury-Don Mills. The zoning is RM. A site-specific exception, 900.6.10(37), changes some of the usual rules for this address. The lot also fronts Overland Dr.

The City has 17 records on this lot since 1998. That is more than at 99% of Toronto houses. In 2024, a building permit was filed: "Revision 01 - changes to add fire pump and electrical distribution as per inspector requestinstallation of new sprinkler system to existing retirement home". Status: closed. In 2023, a building permit was filed: "Proposed installation of 2" backflow preventor". Status: closed. In 2022, a building permit was filed: "Proposed installation of make up air units". Status: closed. 3 open permits mean the City has not closed the files. Ask the seller whether the work was finished and passed its final inspection.

Within 300 m, 1 development application is open (the tallest up to 28 storeys). Within 300 m, the Committee of Adjustment decided 7 minor variance applications in the last 10 years and approved 100%. The nearest TTC stop is 1 Overland Dr - Better Living - Thompson House, a 1-minute walk.

Summary

What the City's records show on this house

  • 3 building permits open, the oldest since 2013ModerateFree check
  • Site-specific exception 900.6.10(37)Moderate
  • No permit for a second unit on fileLowFree check
  • 1 development application open within 300 mLowFree check
  • 3 City trees in front of this lotLowFree check
  • Central Don Mills Secondary PlanLow

Left unchecked, any of these can mean unexpected costs, trouble after closing, or plans you can't carry out. Found before you offer, they give you room to negotiate. The full report explains what each one means for this house and what to do next.

What the rules allow here: Multiplex up to 4 units · Lot split (severance)

Unlock the full report

15 sets of public records, already checked for you. Searching each one yourself and working out what it means for you takes time. We have done that work: what matters about this house and lot, in plain English, in a few minutes.

What to find out first

1 thing to check before you offer.

What to find out before an offer, the steps to take, what each costs and how long it takesUnlock

Check

Open City files

How much in the City's records needs answers before an offer

  • 3 building permits open, the oldest since 2013
  • No open orders or by-law investigations
  • No work or applications in progress

What this part means for this house, in plain EnglishUnlock

  1. 3 building permits open, the oldest since 2013

    ModerateCheck before you offer

    What the record shows, what it means for you and what to doUnlock

  2. No permit for a second unit on file

    LowCheck if it applies

    What the record shows, what it means for you and what to doUnlock

City files on this lot

17 records on file, more than at 99% of Toronto houses (median 0 records).

DateRecordAs the City filed itIn plain wordsStatus
2026-09-28Building permit
26 245793
1 GROUND SIGN WITH ELECTRONIC MOVING AND READOGRAPH COPY**BETTERLIVING COMMUNITY CENTRE**Cancelled
2025-04-24By-law investigation
25 148943 WST 00 IR
WasteClosed
2024-04-24Building permit
23 167164
Revision 01 - Changes to add fire pump and electrical distribution as per inspector requestInstallation of new sprinkler system to existing retirement homeClosed
2023-11-29Building permit
23 222621
Proposed installation of 2" backflow preventor.Closed
2022-03-08Building permit
21 239376
Proposed installation of make up air unitsClosed
2015-02-26Building permit
15 119139
Permit to install (2) new Electromagnetic Locking Devices on the G/F within existing long term care facility.Permit Issued
2013-10-25Building permit
13 181123
One storey sunroom addition in the court yard to Better Living Heath Community ServicesInspection
2013-09-09Building permit
13 214545
Replace fire alarm panel and fire alarm devices for The Thompson House Care Facility.Inspection
2012-08-08Building permit
12 213503
Four magnetic lock doors ong ground floorClosed
2010-03-26Building permit
10 137604
One maglock on ground floor leading to Day program roomClosed
2010-01-19Building permit
09 199725
HVAC - Interior Alterations commuity centre officesClosed
2009-10-16Building permit
09 179642
Interior Alterations to existing community cetntre (Taylor Place) No changes to Thompson House which is a home for the aged.Cancelled
2008-12-09Zoning review
08 228561 ZPU
No description on fileClosed
2004-06-22Building permit
04 149202
Interior alterations to nursing homeClosed - Dormant
1999-06-16Building permit
98 251932
HVACClosed - Dormant
1999-06-14Building permit
98 089537
INT ALT-4TH FLClosed
1998-11-04Building permit
98 093738
10 FIXClosed
Clear

Restrictions

How much heritage, nature and site-specific rules limit changes to the house

  • Site-specific exception 900.6.10(37)
  • No heritage listing or designation

What this part means for this house, in plain EnglishUnlock

  1. Site-specific exception 900.6.10(37)

    ModerateCheck if it applies

    What the record shows, what it means for you and what to doUnlock

  2. 3 City trees in front of this lot

    LowFor later, once you own it

    What the record shows, what it means for you and what to doUnlock

  3. Central Don Mills Secondary Plan

    LowFor later, once you own it

    What the record shows, what it means for you and what to doUnlock

If you want to change or build

What the site-specific rules mean for an addition, a garage or a rebuild.

Site-specific exception 900.6.10(37)

What the exception changes for this address, rule by ruleUnlock

Not on this lot

Flood and erosion rules

How much of the lot lies in the areas TRCA regulates for flooding and erosion

  • Outside the areas TRCA regulates

From TRCA's regulated areas only. Basement flooding, sewer back-up and the TRCA flood plain are not in this score yet; ask the seller and your insurer about water in the basement.

What this part means for this house, in plain EnglishUnlock

Good

Build potential

How much more the rules allow on this lot, beyond what is on record

  • Multiplex up to 4 units: likely fits
  • Secondary suite: likely fits
  • Lot split (severance): possible

What this part means for this house, in plain EnglishUnlock

  1. Multiplex up to 4 units

    LowFor later, once you own it

    What the record shows, what it means for you and what to doUnlock

  2. Lot split (severance)

    LowFor later, once you own it

    What the record shows, what it means for you and what to doUnlock

The lot and what the rules allow

N50 m
64.0 m frontage67.7 m deepon The Donway W
Zone
RM (f21.0; a835; d1.0) (x37)
Height limit
—
Lot coverage limit
35%
Corner lot
Yes, also on Overland Dr
Public lane
None
New house permit
None since 2000
House footprint
1,774 m²
Back yard
0 m
Buildings on the lot
3

House and yards from the City's 3D Massing; a survey gives exact figures.

What you can build

Why, measured on this lot, and the most you could buildUnlock

Some

Building nearby

How much neighbours are building and applying to change within 300 m

  • 1 development application open within 300 m, up to 28 storeys
  • 1 suite and multiplex permits within 300 m in 10 years
  • 7 minor variance decisions within 300 m, 100% approved

What this part means for this house, in plain EnglishUnlock

  1. 1 development application open within 300 m

    LowCheck if it applies

    What the record shows, what it means for you and what to doUnlock

What the City allowed next door

Within 500 m, last 10 years: a guide if you plan to build or apply for something similar.

What neighbours have built and changed around you, and how the City decidedUnlock

Crime near median

Area safety

Police-reported crime in the neighbourhood against the Toronto median

  • Lower than the Toronto median in 2 of 7 categories

Neighbourhood rates per 100,000 people from the Toronto Police Service, not this street.

What this part means for this house, in plain EnglishUnlock

Banbury-Don Mills neighbourhood

About the area, not this house.

2021 Census, against the median Toronto neighbourhood

Median household income (2020)$91,000median $84,500
Households that own their home60%median 54%
Population (2021)27,155median 16,813
Homes built in 1960 or before24%median 29%
Homes needing major repairs4%median 7%

Getting around and schools

  • Don Valley StationNearest station23 min walk
  • 1 Overland Dr - Better Living - Thompson HouseNearest TTC stop1 min walk
  • Don Mills TrailNearest cycling route7 min walk
  • Seneca Hill Private SchoolSchool1 min walk
  • Overland Learning CentreSchool2 min walk
  • Greenland Public SchoolSchool11 min walk
  • Don Mills Mdl SchoolSchool12 min walk

Police-reported crime, 2025, per 100,000 people

  • Assaultcity median 636.3404.9
  • Robberycity median 69.5101.2
  • Shootingscity median 10.59.2
  • Auto theftcity median 192.6220.9
  • Theft over $5,000city median 46.167.5
  • Break and entercity median 172.8248.5
  • Theft from vehiclescity median 188.1211.7

More about Banbury-Don Mills

Ready emails

Copy and send as they are.

2 questions for the seller and your lawyer, written outUnlock

What we checked, and what the City's records don't cover

We checked 48 sets of City of Toronto, TRCA and Statistics Canada open data for this address, last updated Nov 28, 2026. Our records don't cover flooding history, ownership and mortgages, or the condition of the house: ask the seller and your insurer about water in the basement, your lawyer about title, and book a home inspection.

See every source and when we loaded it · Pre-offer checklist

Something here not right?

Screening tool based on City of Toronto and TRCA open data. Not a zoning review or legal opinion. Site-specific exceptions, amendments not yet in the open data, minor variances and other by-laws can change the answer. Confirm with a Preliminary Project Review or Zoning Certificate from Toronto Building before buying or designing.

Scores calibrated on Toronto house lots on 2026-10-19; prices and sources checked on 2026-10-06. Contains information licensed under the Open Government Licence – Toronto. TRCA regulation limits © Toronto and Region Conservation Authority.

Full pre-offer report · 1 Overland Dr

1 thing to check at 1 Overland Dr before you offer

  • 3 building permits open, the oldest since 2013Moderate
  • Site-specific exception 900.6.10(37)Moderate
  • No permit for a second unit on fileLow
  • 1 development application open within 300 mLow
  • and 2 more

The report explains what each one can cost you on this house and what to ask the seller or the City before you offer.

$29 CAD one time · opens right away

See a sample report

Full refund within 30 days if the report left out or misstated a City record on the lot. Refund policy

Also in the report

  • A PDF to forward to your agent and lawyer
  • What you can build on this lot, measured on it
  • Every line linked to the City record it comes from
  • 15 sets of public records, already searched and read for you
  • A clear list of the 7 steps to take before you offer, so nothing slips
  • What each of the 6 findings can cost you or stop you doing, in plain English
  • A two-minute summary of this house, and what to find out first before you offer
  • What the City allowed your neighbours, a guide if you plan to build or apply for something similar
  • We watch this address for 90 days. If anything changes in the City's records, we email you the same day
  • A short summary of each part: City files, restrictions, flood and erosion, build potential, building nearby, area safety

By paying you agree to the terms of use and the refund policy. Payment by Stripe. The report opens right after payment, and we email you a link to it; your account is made from the email you pay with. A screening of public records, not a legal opinion or a home inspection.

Flag an error

What is not right?

The problem

The records come from the City's open data; we check each flag against them. Your email is used only to answer this.